This specification document outlines the requirements for Central Energy Plants (CEP) and related HVAC equipment preventative maintenance, inspections, repairs, refurbishment, and rental services for Fort Lauderdale-Hollywood International Airport (FLL) under the Broward County Aviation Department (BCAD) Maintenance Division. The contract encompasses comprehensive mechanical and electrical maintenance for water-cooled chillers, cooling towers, chiller water and condenser water pumps, heat exchangers, refrigerant monitors, and associated HVAC systems across five terminal locations and a rental car center. The scope includes both corrective and preventative maintenance, emergency 24/7 response capabilities, ductwork installation, and temporary chiller rental equipment deployment. Covered equipment includes 12 chillers (nine Carrier units and three York units), 16 cooling tower cells (Evapco and BAC brands), multiple pump and motor assemblies, plate heat exchangers, and refrigerant monitoring systems. The contractor must perform Standard Preventative Maintenance between May and July annually and Annual Preventative Maintenance between November and January, with both services including detailed inspections, measurements, calibrations, filter replacements, and vibration analyses. The contract term begins on the first of the month following sixty calendar days after award or expiration of the current contract.
The contractor must meet strict qualification requirements, including a minimum of five years' consecutive experience in similar CEP services, maintaining a local presence within the tri-county area with two-hour emergency response capability, and employing a minimum of six certified technicians holding factory certifications for Carrier, York, and Dunham-Bush chillers, EPA Section 608 Universal Certification, and A2L refrigerant safety training. All personnel require FLL Airport security badging, Customs Access Seals, and must complete SIDA training and ramp driving certifications prior to contract commencement. The contractor is responsible for all labor, materials, tools, equipment, transportation, and administrative costs, with major and minor repairs, installations, and refurbishments quoted on a turnkey basis. Pricing includes an estimated annual pass-through allowance of $800,000 for parts and materials, $10,000 for permits and hazardous waste disposal, $100,000 for specialized heavy equipment rental, and $200,000 for specialized subcontracting services. Contractor labor is billed only for time spent on-site at the BCAD Maintenance Facility, with non-business hours (after 5:00 PM, before 7:00 AM, weekends, and holidays) requiring advance BCAD Representative approval. The contractor must warrant all labor for a minimum of 12 months and provide manufacturer warranties on all equipment and parts, with extended warranty requirements for all covered chillers and cooling towers.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS AND REQUIREMENTS
CENTRAL ENERGY PLANTS AND RELATED HVAC EQUIPMENT
PREVENTATIVE MAINTENANCE, INSPECTIONS, REPAIRS, REFURBISHMENT,
AND RENTAL SERVICES
1. SCOPE OF WORK
1.1. Provide preventative maintenance (PM), inspections, repairs, refurbishment, installation, and rental services for Water Cooled Chillers, Cooling Towers, Chiller Water and Condenser Water Pumps (CHW/CW Pumps), Heat Exchangers, Refrigerant Monitors and all associated Central Energy Plants (CEP) equipment at Fort Lauderdale- Hollywood International Airport (FLL) for Broward County Aviation Department Maintenance Division (BCAD).
1.2. The objective of this Contract is to perform comprehensive mechanical and electrical maintenance, inspections, repairs, and installations services for CEP Water Cooled Chillers, Cooling Towers, CHW/CW Pumps, Refrigerant Monitors, Heat Exchangers and related heating, ventilation, and air conditioning (HVAC) systems. This includes both corrective and preventative maintenance, repairs, installations, replacements, emergency services, ductwork, piping, parts, materials, and all equipment associated with the CEP systems at FLL Airport. This shall include complete emergency service 24-hours per day, 7 days per week and holidays response capability of repairing or replacement of worn, defective and/or obsolete parts, equipment and devices. The contractor will provide documentation in accordance with all the terms, conditions, provisions and specifications contained herein and Original Equipment Manufacturer (OEM) extended warranty requirements.
1.3. Contractor will provide all trained and certified personnel, labor, tools, materials, transportation, supplies, equipment, security badging, and on-site supervision necessary to test, clean, inspect, repair, replace, install, adjust and lubricate Water Cooled Chillers, Cooling Towers, CHW/CW pumps, refrigerant monitors, Heat Exchangers, and all equipment associated with these CEP systems.
1.4. Contractor is responsible for the maintenance and repairs of all CEP equipment and associated items. The Contractor is responsible for the development of an inspection and preventative maintenance work schedule for the Water Cooled Chillers, Cooling Towers, CHW/CW pumps, Heat Exchangers and all associated equipment detailed in this Contract.
1.5. Contractor pricing for each Standard Preventative Maintenance, Annual Preventative Maintenance, and inspections shall include all labor, on and off-site supervision, project management, tools, materials, transportation, travel, supplies, equipment, and consumables to perform work, including mechanical adjustments and minor repairs as required herein. This shall also include all administrative cost not limited to project management and personnel security badging costs per the Specifications herein.
1.6. Contractor pricing submitted for major and minor repairs, new installations, refurbishment or replacements, shall include a turnkey proposal with labor hours, on and off-site supervision, transportation and travel, parts, equipment, and consumables to properly perform all major and minor repairs, new installations, or replacements. This shall include all administrative costs not limited to project management and personnel security badging costs per the Specifications herein.
1.7. Prices offered on Bid Table comprise all costs and constitute complete compensation, including administrative cost (including security badging), travel, supervision, etc. No additional charges for travel time, labor or material will be accepted.
1.8. Parts, equipment, and materials required for Standard PM and Annual PMs, inspections, repairs, refurbishment, and installation services shall be provided by the Contractor via a pass-thru allowance. The BCAD Contract Administrator, Program/Project Coordinator Senior or on-site BCAD Superintendent (BCAD Representative) must authorize use of any allowances prior to Vendor incurring costs related to an allowance amount. No markup or additional fees are allowed on payment of allowance items. This includes, but is not limited to, overhead, profit, “runner’s fees”, etc.
2. MINIMUM QUALIFICATIONS
2.1. Proof of Local Presence: Contractor must be located within tri-County area to ensure response time for service calls. Regardless of location, Contractor must be onsite (with qualified technician) within two (2) hours of service request, 24 hours a day, 7 days a week, 365 days a year, including Broward County (County) observed Holidays.
2.2. Contractor shall demonstrate a minimum of five (5) years of consecutive experience providing CEP services for projects of similar scope and size as required per the specifications herein.
2.3. Contractor shall demonstrate a minimum of five (5) years of consecutive experience providing mechanical hydronic systems services for CEPs for projects of similar scope and size as required per the specifications herein.
2.4. The Contractor shall be responsible for obtaining and providing the necessary services of the OEM for any controls, upgrades, or other work requiring proprietary expertise or authorization.
2.5. Contractor shall provide an Account Manager able to communicate with BCAD Representative clearly and effectively regarding all activities and/or situations related to the Contract. Contractor Account Manager shall have at least five (5) consecutive years of experience in managing CEP contracts of similar size and scope of work to this project.
2.6. Contractor shall provide an Account Supervisor responsible to be onsite and supervise the technicians’ daily work and able to communicate with BCAD Representative clearly and effectively regarding all activities and/or situations related to the Contract.
Contractor must an equally responsible alternate to provide the Account Supervisor’s duties when the primary Account Supervisor is absent. Contractor Account Supervisor shall have at least two (2) consecutive years of experience in supervising technicians involved in CEP contracts of similar size and scope of work to this project.
2.7. Contractor personnel must be able to obtain an Authorized Signatory and maintain security badging as maintenance services will be located in the secured area near or on the aircraft apron.
2.8. Contractor shall be evaluated based on the requirements set forth in this Contract, which includes Contractor experience, responsiveness, communication, customer service, capability, past performance, and other criteria to determine acceptability such as repairs, inspections, testing, quality of work, delivery and suitability for this Contract.
2.9. Contractor technicians must meet the following requirements:
2.9.1. Contractor technicians must hold factory certifications to provide maintenance and repair services for FLL OEM chillers covered under this contract, including Carrier, York, and Dunham-Bush.
2.9.2. To ensure timely performance of all services under this Contract, the Contractor shall maintain sufficient staffing levels such that certified technicians are available to service each chiller type covered by this Contract at all times. The Contractor is encouraged to utilize technicians holding multiple OEM certifications to maximize service responsiveness and continuity. Contractor must provide a minimum of six (6) technicians with all FLL OEM factory certifications and security clearance at all times.
2.9.3. All Contractor technicians must hold U.S. Environmental Protection Agency (EPA) Section 608 Universal Certification.
2.9.4. All Contractor technicians must have obtained specialized A2L refrigerants safety training prior to award of this contract.
2.10. Contractor must submit certificates of training on the specified chillers at FLL for each technician assigned to perform work under this Contract. Copies of the certificates should be provided with the bid or within three (3) days of request by BCAD.
2.11. Any deviation from these certification requirements must receive prior written approval from the BCAD Representative. Failure to provide appropriately certified technicians shall constitute non-compliance with the Contract requirements.
3. CONTRACT START-UP AND SECURITY REQUIREMENTS
3.1. Commencement of this Agreement will be on the first of the month following sixty (60) calendar days from award of the Contract or expiration of the current contract, whichever is later. During this time, the Contractor is required to:
3.1.1. Attend a start-up meeting with BCAD no later than five (5) business days following the date of award. The meeting will include a walk-through of all CEP equipment at the Terminals and Rental Car Center (RCC) and other BCAD facilities to ensure that the scheduling of activities in conjunction with BCAD, all airlines and tenant operations is fully understood (excludes incumbent vendor).
3.1.2. Contractor must immediately initiate and successfully obtain at least two (2) authorized Signatory (including attending training classes, initiate applications
(including Customs Seal applications) and successfully obtain security badges and Seals and non-movement driving authorization (Vehicle Requirements/Vehicle Ramp Driving) for all employees assigned to this contract within 30 calendar days of contract award, for the purpose of obtaining FLL Airport Issued Identification Media pursuant to all Security Regulations of BCAD, U.S. Department of Homeland Security, and Transportation Security Administration (TSA), and specifically, the Code of Federal Regulation (CFR) 49 CFR Part 1542 – Airport Security. Failure to do so may result in termination of the contract.
3.1.3. Identify and provide the BCAD Representative with a list of its Account Manager, Account Supervisor and key personnel, with telephone numbers, who shall be responsible for fulfilling all the requirements of this Contract. Contractor Key Personnel List shall be provided to the BCAD Representative within 30 days from the contract award and shall be updated when changes are made.
3.1.4. Perform an inspection and assess the condition of all equipment covered under this Contract to establish a condition baseline within thirty (30) calendar days from the contract award. Contractor shall prepare and provide a survey report of the equipment to the BCAD Representative for review and approval within seven (7) calendar days of the inspection and assessment date.
3.1.5. The survey report shall include the Contractor’s observations of deficiencies in equipment condition, operation and/or performance and shall provide a written baseline report of discrepancies, which once approved by the BCAD Representative will serve as a “starting point” for the Contractor to provide the ongoing maintenance and repairs.
3.1.6. Within thirty (30) calendar days from contract award, Contractor will develop and provide PM Plans and schedules. Contractor will provide a sample Preventative Maintenance Report, in MS Excel format, to cover all work to be performed for the BCAD Representative review and approval.
3.1.7. Within thirty (30) calendar days from contract award, Contractor will develop and provide a sample work checklist and service report and Lock Out Tag Out (LOTO) procedures for the BCAD Representative review and approval.
4. ADDITIONAL SECURITY REQUIREMENTS
In addition to the Supplement Security Requirements included in this Contract, Contractor employees assigned to this Contract must obtain and maintain a Fort Lauderdale-Hollywood International Airport (FLL) Airport Issued Security Identification Media with U.S. Customs and Border Protection (CBP) Customs Access Seals pursuant to all Security Regulations of BCAD, U.S. Department of Homeland Security (DHS), Transportation Security Administration (TSA), and specifically, the Code of Federal Regulation (CFR) 49 CFR Part 1542 – Airport Security;
and U.S. Customs and Border Protection (CBP) Security Area pursuant to CFR 19 CFR § 122.182.
4.1. Contractor shall ensure acquisition of all necessary security media, vehicle permits, and security services from all entities having regulatory jurisdiction of the sites.
4.2. All security costs and time associated with obtaining security clearance will be at Contractor’s cost and will not be reimbursed by BCAD.
4.3. Contractor must proceed with submitting security applications immediately but no later than 48 Hours following award to ensure its employees receive FLL Security Media and privileges in time for Contract Commencement.
4.4. Under no circumstances shall any of the Contractor’s personnel, vehicles, or equipment enter or move upon any area not authorized by BCAD, DHS, CBP, TSA, and any security mandates in place.
4.5. FLL Airport Issued Security Identification Media:
4.5.1. All Contractor employees working under this Contract must be able to obtain and maintain unescorted access into the Security Identification Display Area (SIDA), with Customs Access Seal, and must attend SIDA training prior to Work assignment. All employees must be fingerprinted, approved, and ready to Work at the time of the Contract Commencement date. Failure to have all employees approved at the Contract Commencement date may result in Contract termination. Copy of all Contractor personnel security badges shall be provided to the Contract Administrator or designee ten (10) calendar days after Contract Commencement Date.
4.5.2. The management and control of Contractor employees in the performance of this Contract shall be the sole responsibility and prerogative of the Contractor;
however, Contractor shall comply with the Contract requirements, BCAD, DHS, CBP and TSA regulations concerning conduct of employees.
4.5.3. Contractor is required to conduct an employee background check on each proposed employee for work assignment at FLL in connection with this Contract. Only when an employee is successfully approved by Contractor, the Contractor shall submit an FLL Airport Security Identification Media application and Customs Access Seal application for said proposed FLL stationed employee.
4.5.4. Only employees who have obtained FLL Airport Issued Security Identification Media shall be assigned to work in connection with this Contract. For each applicant, a DHS criminal history check will be conducted immediately preceding ten (10) years, and a CBP criminal history background check is conducted from age sixteen (16) to the present for Customs Access Seals.
4.5.5. The County shall deduct Two Hundred‐Fifty Dollars ($250.00) for every Contractor employee presented to the County for access control badging (a) for whom the above background check has not been completely and accurately performed, or (b) who should not have been presented per the above guidelines. The Contractor remains responsible for any/all regulator deductions associated with the Contractor failure to properly conduct/complete the required background check. The amount payable herein by Contractor is not a deduction, it is in addition to any access control badging application fee paid by the employee and is payable regardless of access control badge issuance to the employee.
4.5.6. The application to obtain a FLL Airport Issued Security Identification Media must be dropped off in-person to BCAD Credentialing Center located at 50 Terminal Drive, 4th Floor (Suite 400), Fort Lauderdale, FL 33315.
4.5.7. Contractor vehicles regularly engaged in the installation, service, or maintenance activities must prominently display company name, telephone number, and contractor license number, if applicable.
4.6. U.S. Customs and Border Protection (CBP/Customs) Access Program
4.6.1. In order for the Contractor employee to have unescorted access in CBP restricted, secured, or sterile areas of FLL facilities, it is a federal requirement that each Contractor employee pass a background check and be badged with a Customs Access Seal. For specific badging requirements, costs and forms please contact the Airport’s Security Badging Office at http://fll.net.
4.6.2. For each Customs Access Seal applicant, DHS criminal history is checked for the immediately preceding ten (10) years and CBP criminal history background is conducted from applicant’s age sixteen (16) to current day. Each employee must provide:
i. A ten (10) year work history.
ii. Any gaps in employment of thirty (30) days or more during a ten (10) year period must be explained.
4.7. Delegated Authorized Signatory
4.7.1. Contractor must delegate at least two (2) individuals to be Authorized Signatory for the purpose of obtaining SIDA and Customs Seals for the FLL Airport Issued Identification Media pursuant to all Security Regulations of BCAD; TSA; and specifically, the Code of Federal Regulation (CFR) 49 CFR Part 1542 – Airport Security. The delegated Signatory will be required to attend training prior to approval.
4.7.2. Prior to being approved as an Authorized Signatory, the applicants must attend a two-hour training class and successfully pass a test to obtain signatory privileges.
4.7.3. U.S. Customs and Border Protection CBP Access Program:
a) Contractor must delegate at least two employees to act as CBP
Access Program Coordinators and assume the responsibility of submission of all applications for the purpose of obtaining a Customs Seal for the FLL Airport Issued Identification Media pursuant to all Security Regulations of BCAD; TSA; and specifically, the Code of Federal Regulation (CFR) 49 CFR Part 1542 – Airport Security.
b) Contractor is required to post a continuous CBP Form 301 Bond or an http://fll.net/
Airport Security Bond. The bond is obtained from an authorized surety company as referenced in 19 CFR113.37. The face value of the bond depends upon how many employees will require access to the CBP security areas. Questions regarding the bond applications should be directed to (317) 614-4880, or via email to cbp.bondquestions@dhs.gov.
c) For each Customs Seal applicant, DHS criminal history is checked for the immediately preceding ten (10) years and CBP criminal history background is conducted from applicant’s age sixteen (16) to current day.
i. Each employee must provide a ten (10) year work history.
ii. Any gaps in employment of thirty (30) days or more during a ten (10) year period must be explained.
4.8. Vehicle Requirements/Vehicle Ramp Driving (non-movement areas)
4.8.1. All personnel providing services under this contract shall apply, receive and maintain Ramp Driving privileges
4.8.2. Prior to being approved for Ramp Driving, the applicants must attend a training class and successfully pass a test to obtain certifications and privileges.
4.8.3. Contractor must provide its own vehicle to service the secured areas of FLL (airside).
4.8.4. Only authorized personnel may drive Contractor vehicles on the airside of FLL.
4.8.5. Applications and ramp driving training shall be provided to the Contractor by
BCAD.
4.9. Key Control:
4.9.1. The Contractor shall secure and safeguard all keys, key cards, and any other entry devices and codes provided by the County and shall maintain a record of the key numbers issued to its employees. All key and other entry devices used by the Contractor's employees in the performance of the Work shall be returned to the County when the Contract expires or when requested by the County.
4.9.2. The Contractor shall immediately report to the County all keys and/or security badges issued to it by the County that are lost or stolen.
4.9.3. These prohibitions and requirements shall also be applicable to all individuals regarding access, removal, and/or possession of any information, confidential data, materials, supplies, or equipment. The Contractor shall not duplicate and shall not allow any such issued items to be duplicated or removed from the job site.
4.9.4. CONTRACTOR shall not permit any employee to have keys or access to locked rooms designated herein until such employee (s) have been successfully badged and is determined to need such access to perform the work under this contract.
4.9.5. At the County’s sole discretion, Contractor shall be required to replace, re‐key, or reimburse the County for replacement of locks or rekeying following the loss or theft of Keys issued to the Contractor. In the event of a loss, theft or duplication of a master key by the Contractor, County shall replace all locks and keys associated with that system and the Contractor shall be responsible for the cost of replacement which will be deducted from the next invoice payment due to the Contractor under this Contract. The County shall be the sole determiner of the cost of replacement.
5. CONTRACTOR RESPONSIBILITIES
5.1. Contractor must provide an Account Manager and Account Supervisor to manage, supervise, and coordinate all work on and off site described in this specification.
5.2. The Contractor Account Manager and Account Supervisor shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this Contract.
5.3. The Account Manager and Account Supervisor shall be available during normal business hours and within two (2) hours of a request to meet with BCAD Representative to discuss issues and problem areas.
5.4. The Account Manager and Account Supervisor shall attend scheduled Performance Review Meetings with the BCAD to discuss issues relating to this Contract. The Contractor will be responsible for preparing a meeting summary and disseminating to all stakeholders.
5.5. Contractor shall provide only qualified, trained, and certified technicians in performing chiller, cooling tower, pump, heat exchanger and refrigerant monitor inspections, PM, repairs, replacements, and services for all the work included in the Specifications herein.
5.6. Contractor will be responsible to provide on and off-site supervision of its staff to ensure work is completed effectively and timely. At no time will BCAD staff be considered the Contractor’s supervision.
5.7. Prior to the start of work on any assigned day, the Contractor personnel must first report to the Aviation Maintenance facility to sign in and must sign out upon completion of the work for the day. Each individual technician coming onsite to perform work must sign in.
5.8. Contractor and all employees are responsible to check in and check out with the BCAD Representative at the beginning and end of each workday. Each workday, the Contractor will review daily work, completed work, and any outstanding issues with the BCAD Representative.
5.9. Contractor shall provide ladders, extension ladders, lifts, scissor lifts, hydraulic lifts and any other equipment, tools or testing devices required to service all CEP locations properly at no additional cost to BCAD. All equipment must be utilized in accordance with OSHA requirements approved. The Contractor is responsible for transporting such equipment at no additional expense to the BCAD, without delay and within the required response time, causing no delay in services/repairs.
5.10. Contractor is responsible for providing commonly used consumables such as nuts, bolts, washers refrigerant, oil, filters cleaning chemicals, rags, various tapes, wire nuts and sealants for minor repairs and preventive maintenance. The cost of all consumables shall be included in the Contractor unit prices.
5.11. The Contractor is responsible for all necessary PM, repairs and performance of all equipment and parts covered under this Agreement. The Contractor is in no way relieved of the responsibility for the performance and operation of all equipment, parts, and repairs furnished. The contractor will ensure timely delivery of materials, parts, equipment etc.
even if it is not of their manufacturers.
5.12. Contractor service vehicle shall contain common parts, equipment and materials necessary to perform services at the time of first response for minor repairs, Standard and Annual PMs and Inspections. BCAD will not be charged for labor hours or travel time and costs attributed to the Contractor personnel travel to obtain common parts, equipment and materials needed to perform and complete scheduled minor repairs, Standard PM, Annual PM and Inspections. Only time on the jobsite will be billed.
5.13. Contractor must conform and execute all Standard PM, Annual PM and Inspections, repairs, replacements, and installations, based on the manufactures and BCAD specifications and in accordance with the requirements stated herein. Contractor will be fully responsible for all costs and repairs of chillers, cooling towers, CW and CHW pumps, and all associated CEP equipment due to the Contractor failure to provide and perform proper inspections, preventive maintenance and repairs. This includes all extended warranty requirements for Carrier, York, and Dunham-Bush chillers, BAC and Evapco cooling towers, and all associated CW and CHW pumps.
5.14. The Contractor must produce a set of records related to extended warrantee requirements. Records will be provided within five (5) calendar days of request to the BCAD Representative.
5.15. The Contractor will provide a preventative maintenance report, work checklist and service report for each repair, replacement, installation, inspection and preventive maintenance.
The preventative maintenance report, work check list and service report will provide information and results for each item and each piece of equipment serviced and must be provided to the BCAD Representative within (3) three calendar days of completion of the work for review. All required paperwork, as detailed above, must be approved and signed by Contractor and BCAD Representative. BCAD Representative reserves the right to inspect the work in order to approve payment. BCAD signatures on Contractor work ticket are not a guarantee of payment.
5.16. Contractor must schedule all work with the BCAD Representative, via email, at least 72 hours in advance of all services. Failure to notify the BCAD Representative at least 72 hours in advance of all services schedule will result in rescheduling with no charge to BCAD. Cancellations of scheduled work by either party must be made by phone or email no less than 24 hours in advance. All cancellations must be rescheduled at time of cancellation.
5.17. All Contractor’s personnel must wear photo identifications (IDs) and uniform with company name. Contractor personnel shall present a neat appearance and be easily recognized as Contractor employees. Contractor vehicles must have an affixed company sign on all vehicles.
5.18. Contractor will be escorted by BCAD maintenance personnel to complete all inspections, installations, preventive maintenance, and repairs.
5.19. Contractor to provide safe, clean, reliable, efficient and operational equipment.
5.20. Contractor equipment must meet industry, safety, and operating standards.
5.21. Contractor to provide uninterrupted services to FLL Airport
5.22. Contractor will ensure appropriate staffing levels are maintained at all times.
5.23. Contractor to provide Standard and Annual PM and Inspection program in accordance with the equipment manufacturer and BCAD requirements herein for water cooled chillers, cooling towers, heat exchangers, CW / CHW pumps and all associated CEP equipment.
5.24. All certified technicians must provide inspections, preventive maintenance, and repair services in a professional manner. All certified technicians must be thoroughly trained, highly motivated and consistently deliver seamless and excellent customer service to BCAD, airlines, public, and all airport staff.
5.25. Contractor shall provide employees who are literate in English. All Contractor employees who perform services pursuant to this Contract shall be able to read, write, speak and understand the English language or provide interpreter at Contractor’s expense.
5.26. The Contractor must attend routine in-person meetings as required by the BCAD Representative
5.27. Contractor shall perform all work using licensed journeymen and must comply with American Society of Heating, Refrigerating and Air- Conditioning Engineers (ASHRAE) standards, South Florida Building Code, and Sheet Metal and Air Conditioning Contractor’ National Association (SMACNA).
5.28. Contractor shall obtain any and all permits required by regulatory agencies, other than the Broward County Board of BCAD Commissioners, applicable to this contract. It is the responsibility of the Contractor to apply for, obtain and notify the BCAD Representative of all permits and impact fees as may be required from regulatory agencies to perform all work.
5.29. Contractor shall provide “signed & sealed” shop drawings required for permitting with regulatory agencies to the BCAD Representative.
5.30. BCAD shall reimburse the Contractor for permitting and shop drawing costs associated with required services under this contract. Refer to Special Instructions to Vendors.
5.31. Contractor shall provide all services to ensure permit is closed correctly as required by regulatory agencies having jurisdiction and must provide documentation upon final inspections and invoicing.
5.32. Contractor shall comply with all applicable Federal, State, BCAD, City and Local Laws, Regulations and Codes and be governed accordingly as they will apply to this project and the actions or operations of those engaged in the work or concerning materials used.
5.33. Contractor shall obtain required inspections closing permits within time allotted by permit, pay for any fines levied due to circumstances in which fines are incurred due to Contractor’s negligence (this type of fines is not reimbursable).
5.34. The Contractor must supply its personnel with personal protective equipment (PPE) in accordance with OSHA requirements.
5.35. Contractor shall, at its sole expense, promptly repair or replace, to the satisfaction of the Contract Administrator or designee, any County property damaged or lost as a result of the Contractor actions or omissions. Any such repair or replacement shall be of like kind and value. If the Contractor fails to repair or replace the damage or loss within fourteen
(14) calendar days following written notice from the Contract Administrator or designee, the County may, at its sole discretion, repair or replace the damaged or lost property and deduct the associated costs from any amounts due to the Contractor under this Contract.
The Contractor shall remain liable for any repair or replacement costs that exceed the amounts withheld by the County. The County shall have sole discretion in determining the cost of repair or replacement.
6. APPLICABLE STANDARDS
6.1. Contractor shall perform all testing, maintenance, inspection, repair, removal and installation in a safe manner and in accordance with applicable laws and regulations. In addition to all Building Codes and State Standards, the following agencies and acts may apply:
EPA U.S. Environmental Protection Agency
OSHA Occupational Safety and Health Act
UL Underwriters Laboratories Standard
ASTM American Society of Test Methods
SMACNA Sheet Metal and Air-Conditioning Contractor’s National Association
ASHRAE American Society of Heating, Refrigerating and Air-Conditioning Engineers
ANSI American National Standards Institute
NEC National Electric Code
ADA Americans with Disabilities Act
ICC International Code Council
7.1. Where not more specifically described in any of the various sections of these specifications, quality of work shall conform to all methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion of the services. All work shall be executed by personnel skilled in their respective lines of work.
8. EMERGENCY REPAIRS AND REPLACEMENT TIMES
8.1. Contractor must be available twenty-four (24) hours, seven (7) days a week, 365 days a year to perform and complete Emergency Services and call back services on critical CEP systems and main Air Conditioning source for all buildings and computer rooms.
8.2. Contractor will have a 24-hours per day, 7 days per week service center or answering service. This service center or answering service shall be able to reach the Contractor’s Account Manager, Account Supervisor, and HVAC technicians at all times. Contractor shall maintain capability to respond to alarms, emergency service calls or natural disasters related to the operation of all CEP systems.
8.3. Contractor must respond and be onsite within two (2) hours of notification for Emergency Services.
8.4. Contractor will provide Emergency Service and provide authorized emergency contact personnel, including email and 24/7 telephone number. The contractor emergency contact person must be authorized to release parts, materials, and equipment to BCAD during non-business hours, in the event of an emergency repair requirement. Any changes with the Contractor’s authorized emergency contact personnel must be promptly submitted to BCAD Representative.
8.5. An immediate assessment of the emergency repair problem encountered must be communicated to the BCAD Representative within two (2) hours of arrival at site. If an immediate repair is not possible, an accurate projection of expected completion time must be provided by the Contractor by phone and e-mail to BCAD Representative. If the BCAD Representative is not available, Contractor will communicate with Airport Operations Control Center (AOCC) as last resort. The Contractor shall provide a turnkey emergency repair proposal to BCAD Representative.
8.6. No emergency work shall begin without approval from BCAD Representative.
9. MAJOR REPAIRS AND REPLACEMENT TIMES
9.1. Major failures, repairs, installations, refurbishment and replacements are defined as work that affects airport operations and customer experience.
9.2. For major failures, repairs installations, and replacements: Contractor is required to visit the site (CEP or BCAD Facilities) to assess the issue of concern. The Contractor must provide a turnkey proposal for the work to BCAD Representative within (3) three calendar days from the site visit. Contractor must complete all major failures, repairs, installations and replacements within thirty (30) calendar days from the date of approved proposal, unless otherwise approved in writing, in advance, by the BCAD Representative. In the event that the work takes more than thirty (30) calendar days to complete, a daily progress
7. QUALITY OF WORK
report by e-mail from the Contractor will be required. Status calls should be made to BCAD Representative with expected completion time refined at each report.
9. MINOR REPAIRS AND REPLACEMENTS TIMES
9.1. Minor failures, repairs, installations and replacements, for all equipment located at CEP and all BCAD Facilities must be completed within two (2) calendar days from date of identified failure. In the event that the work takes more than two (2) calendar days to complete, a daily progress report by e-mail from the Contractor will be required. Status calls should be made to Representative with expected completion time refined at each report. Refer to Section 5.12.
9.2. No work shall begin without an approved proposal, purchase order number or verbal approval from BCAD Representative.
10. HOURS OF SERVICE
10.1. Business Hours: for the purposes of billing, business hours shall be defined as 7:00 AM to 5:00 PM, Monday through Friday, except BCAD observed holidays.
10.2. Non-Business Hours: for the purposes of billing, non-business hours service shall be defined as 5:01 PM to 6:59 AM, Monday through Friday and BCAD observed holidays and weekends (Saturday and Sunday).
10.3. Contractor is expected to perform all inspections, replacements, installations, preventative maintenance and repairs during Business Hours.
10.4. All work to be performed during Non-Business Hours must be approved by the BCAD Representative in advance. BCAD will not pay for work not approved.
10.5. Only actual time on the job site shall be invoiced. Contractor’s billable time will begin when technicians sign in at BCAD Maintenance Facility. Contractor technicians’ time will end when signing out at BCAD Maintenance Facility. Each individual technician must sign in and sign out when coming on to the jobsite and leaving the jobsite. BCAD will not pay for Contractor’s employee breaks or travel time to obtain parts or materials for the work.
10.6. All hourly labor rates shall be pro-rated and billed to the closest quarter hour increments.
For example: 1 to 15 minutes = ¼ hour; 16 to 30 minutes = ½ hour, etc. All hours shall be verified by the BCAD Representative. No additional trip charges, mileage, or travel fees will be charged by the Contractor.
11. CHILLER RENTAL EQUIPMENT
11.1. Contractor will provide chiller rental equipment if the BCAD equipment requires off-site repair or if the on-site repair cannot be completed with twenty-four (24) hours.
11.2. Any rental must have prior approval from BCAD Representative before proceeding.
11.3. Chiller rental equipment fee shall be in accordance with prices specified on the bid table.
Prices offered on the bid table shall be comprised of all costs and constitute complete compensation including freight, shipping cost, mobilization, all licensed personnel to connect all equipment, material, hook-ups, pumps, valves, hoses, power cables, equipment (including generator), installation services, start-up and labor, uninstall, demobilization and all other associated materials necessary for a turnkey project .
11.4. Contractor must review the BCAD designated rental equipment location, routing and connection of hoses, and routing and connection of electrical lines prior to installing rental equipment.
11.5. BCAD will not pay for rental equipment fee until equipment is operating.
11.6. Chiller rentals shall be of adequate size / capacity (tonnage) and power type to compensate for the unit in need of repair. Contractor may need to provide multiple rental units to meet total capacity requirements based on rental equipment availability.
11.7. Contractor will provide operation instructions to BCAD staff for chiller rental equipment at no additional cost to the BCAD.
11.8. Contractor shall provide flexible hose, electrical cables, and other connecting hardware necessary to connect chiller rental equipment to existing openings, where applicable.
11.9. If power is not available for the rental equipment, Contractor shall provide power generator capable of supporting supplied chiller rental equipment. No fuel charge shall be charged. Fuel and fueling services for generators will be provided by BCAD.
11.10. Contractor shall supply appropriate power cables per building code requirements and to include ground cables.
11.11. Contactor shall provide all services, equipment (including generator), materials and all licensed personnel to connect all equipment and make fully functional.
11.12. Contractor is responsible to obtain any all permits required for operation of rental equipment.
11.13. Contractor shall provide “signed and sealed” shop drawings required for permitting with local municipalities to the BCAD Representative.
11.14. Contractor shall submit permit application(s) for local municipalities’ approval within five
(5) business days of receipt of a Purchase Order (PO) for rental equipment; deviations must be approved by the BCAD Representative.
11.15. Contractor shall provide all services and materials to interface to the facilities’ existing life safety systems and cooling systems.
11.16. Routine maintenance for rental equipment is the responsibility of the Contractor. The Contractor will coordinate any rental equipment shutdowns for maintenance or repairs with the BCAD Representative. Routine maintenance for all rental equipment shall be performed and completed at the sole discretion and convenience of the BCAD
Representative.
11.17. The Contractor shall ensure chiller rental is delivered, installed, commissioned, and fully operational within ten (10) business days of receipt of permit approval; deviations must be approved by BCAD Representative.
11.18. In the event the chiller rental is no longer operational, Contractor must repair or replace rental within 48 hours at its own cost. BCAD will not pay for non-operational rental equipment or labor for the repair.
11.19. Contractor shall provide all services to ensure permit is closed correctly as required by local municipalities.
11.20. Contractor will provide to the BCAD Representative a written report after each routine maintenance.
11.21. In the event of a storm warning, it shall be the responsibility of the Contractor to make immediate arrangements to secure or remove the rental equipment. The contractor will coordinate with BCAD Representative to secure or remove rental equipment as necessary. Following the storm and without delay, the Contractor and BCAD Representative will inspect and determine if all rental equipment is fully operational, confirmed safe, and ready for operation.
12. DUCTWORK
12.1. Contractor shall furnish and install ductwork and all associated material in connect to repair services of existing ductwork. Ductwork must be installed with independent support system to the building’s structure. Ductwork installed with support system tied to other existing support systems will not be accepted. Contractor will install turning vanes in 90-degree ducts to direct airflow. Contractor will replace all fire dampers affected by the installation of new ductwork at no additional cost to BCAD.
12.2. Interior Ductwork required to be G-90 galvanized sheet metal, 22 gauge, lined with 1.5 inches of R-6 Duct liner.
12.3. Exterior Ductwork required to be stainless steel sheet, ASTM A167, Class 304 or 316, Condition A (annealed) finish No. 4, lined with 1.5 inches of R-6 Duct liner.
12.4. Ductwork must be fabricated and installed per SMACNA HVAC Duct construction Standards- Metal and Flexible.
12.5. All ductwork seams must be sealed with high velocity duct mastic.
12.6. Ductwork must meet all local building code requirements.
12.7. Contractor must provide all associated equipment and materials for a turnkey installation.
12.8. Contractor must coordinate with BCAD’s building automation system (BAS) controls Contractor for all installations, connections and operation of BAS actuators, duct heaters, and any other device requiring BAS controls.
12.9. Contractor pricing per cubic foot shall include installation and all other associated costs, including insulation, necessary to provide a complete turnkey project.
12.10. Ductwork shall have a minimum one-year warranty upon installation and BCAD acceptance.
12.11. Contract shall provide corrosion resistant protective coatings where needed on ductwork as part of any repair, installation or maintenance when requested. Contractor pricing for equipment coating services shall be per installed linear feet. Coating shall have a minimum one-year warranty upon installation and BCAD acceptance.
13. QUALITY CONTROL
13.1. Contractor shall develop and adhere to a Quality Control Program which complies at a minimum with the following:
13.1.1. Providing a proactive approach to monitor work performance a n d ensure compliance with this Contract’s requirements.
13.1.2. Providing documentation and forms to record Standard and Annual PMs and Inspection service, including corrective actions performed.
13.1.3. Comply with BCAD Audit of Contract Performance and Compliance.
13.1.4. Comply with BCAD per the Standard and Annual PMs and Inspection services’ audits and requests.
13.2. Contractor shall provide a Quality Control Program to the BCAD Representative within thirty (30) days of contract award for approval.
14. LOST AND FOUND PROPERTY
Contractor shall immediately turn in all personal property found on BCAD property, while providing contracted services to BCAD Lost and Found offices.
15. SAFETY REQUIREMENT
15.1. Contractor must at all times conduct its operations in a safe manner. Contractor shall promptly take all precautions which are reasonable or necessary to safeguard against risks. Contractor shall make regular safety inspections of all equipment covered under this Contract and the tools used in the execution of this Contract, in compliance with these specifications:
15.1.1. Contractor shall be solely responsible for the discovery, determination and correction of any unsafe conditions arising in connection with the performance of the Contract.
15.1.2. Contractor shall be responsible for initiating, maintaining, and supervising safety programs in connection with the performance of this Contract.
Contractor shall take all necessary precautions to ensure the safety of persons, property, equipment and vehicles.
15.1.3. Contractor must provide maintenance services and repairs for covered equipment in compliance with the most current OEM manual and will be subject to safety inspections by the BCAD Representative
15.1.4. Contractor shall be responsible on a daily basis to maintain a clean work site, to remove debris, and to dispose of it properly at the Contractor’s expense.
Contractor will be responsible for disposal of hazardous waste materials that may be a result from maintenance or repair work performed. Whenever disposing of hazardous material, the Department of Natural Resource Protection shall be contacted by Contractor for proper disposal instructions.
This requirement shall be solely the Contractor’s responsibility. Contractor shall provide disposal records to the BCAD Representative. Contractor’s prices in the Bid Table must include disposal costs.
15.1.5. All refrigerants will be handled in accordance with EPA Stratospheric Ozone Protection Clean Air Act, Section 608.
15.1.6. Contractor shall provide all equipment necessary to recover, recycle, and reclaim refrigerants in accordance with the Clean Air Act. Contractor shall comply with all EPA standards and procedures for handling Chlorofluorocarbons (CFCs), Hydrochlorofluorocarbons (HCFCs), Hydrofluorocarbons (HFCs) and A2L (mildly flammable) refrigerants.
15.1.7. All work shall be performed in accordance with 2023 National Electrical Code and 2023 Florida Building Code, or the latest version accepted by the BCAD.
15.1.8. Contractor should be aware of the highly corrosive effects of hydrogen sulfide that may be present at some locations and shall recommend and provide corrosion resistant protective coatings where needed on equipment as part of any repair, installation or maintenance when requested. Contractor pricing for coating services shall be per tonnage of air conditioning. Coating shall have a minimum one-year warranty upon installation and BCAD acceptance.
15.1.9. Contractor shall erect barriers and signs as necessary according to approved Maintenance of Traffic (MOT) plans obtained from FLL safety team to protect his workers, BCAD employees and the public while repair work is in progress.
Contractor shall comply with the latest 2025 OSHA standards or latest version to protect employees and his crews while performing work.
15.1.10. Contractor shall take necessary steps to minimize opportunities for CEP equipment downtime. Repairs shall be expedited to keep all CEP equipment downtime to a minimum. Contractor shall notify the BCAD Representative if it becomes necessary to take equipment out of service.
15.1.11. The repeated failure of any Contractor employees to follow the rules of the Safety Program or to otherwise comply with applicable safety requirements shall be the basis for removing such employee from work on the Contract. The BCAD Representative must be notified immediately.
15.1.12. Contractor must have an established, system-wide safety program which will identify, minimize, eliminate, and control safety hazards and their employee’s risks. The safety program shall establish appropriate requirements, levels of responsibility, accountability, and method of documentation.
15.1.13. The safety program, which may be revised from time to time, must be kept current and on file at all times with the BCAD Representative .The Safety Plan must be reviewed and updated upon request by the BCAD but under no circumstances will this be less than annually. At a minimum, the safety program shall address the following:
a) Overall approach to safety.
b) Environmental protection.
c) Property protection.
d) Health protection and use of personal protective equipment to perform scope of work.
e) Fire prevention and protection.
f) Systematic review of hazards and action plan to avoid identifiable hazards.
g) Procedures for the assessment of preventable and unpreventable accidents.
h) Documented Safety & Health Program.
15.1.14. Lock out Tag out procedures must be rigorously practiced and enforced when working on equipment.
15.1.15. BCAD reserves the right at its sole discretion, to inspect all areas and direct Contractor to make immediate corrections if any safety hazards are identified.
15.1.16. In the event BCAD should elect to stop work due to any hazards after Contractor has been notified and provided reasonable time to correct, Contractor shall bear all costs for eliminating the hazard and shall not be granted compensation for the work stoppage. Contractor shall pay all additional expenses.
15.1.17. Proper spill control measures must be taken
16. REPAIR AND REPLACEMENT PARTS
16.1. Contractor must furnish and install all replacement parts required, including replacement of obsolete parts, and upgraded parts, both of a major and minor nature. Contractor must furnish spare parts at the request of BCAD Representative
16.2. Contractor must provide all new parts, materials, necessary tools, equipment, and labor to complete repairs, installations, inspections and preventive maintenance services. Contractor to ensure replacement of all covered equipment and items is per the manufacturers and BCAD recommendations. Contractor will ensure full operation of all CEP equipment.
16.3. Contractor shall retain all parts replaced for at least ten (10) days after completion of the job. The contractor will make these parts available for inspection upon BCAD request.
This is the start of the file's text. The full file is on GovTribe.