About this file
This is a Public Bid Pricing Sheet Submission for the Delaware Valley University Livestock Project, managed by the Bucks County Conservation District in Doylestown Township, Pennsylvania. The project encompasses construction of an on-farm manure and pasture management system including a roofed bed-pack manure storage facility, a concrete under-barn liquid manure storage tank, a heavy use area with associated infrastructure, stormwater management systems, a slatted stream crossing, stone livestock walkways, water pipelines, and hydrants. The bid submission contains 16 line items with varying quantities, including lump sum components such as erosion and sedimentation controls, manure storage structures, curbing and collection systems, stone access roads, roof gutters and underground piping, grass diversions, animal walkways, stream crossings, and water infrastructure. Unit-priced items include manual controlled curtains, interior metal fencing, waterers, buried livestock pipelines, overhead doors, and metal siding. Sealed bids were required by 11:30 p.m. EDT on Thursday, September 24, 2026, submitted through the PennBID website.
Four contractors submitted bids for the project: Gordon H. Baver, Inc. at $897,099.99 (lowest bid), King Construction at $1,036,166.00, Twining Construction at $1,215,135.00, and White Horse Construction Inc. at $1,681,950.00. Bids were evaluated on a competitive basis with unit pricing for select items and lump sum pricing for major construction components. The pricing sheet identifies the lowest overall cost submission and tracks pricing variations across bidders for individual line items, enabling comparative analysis of cost differences in specific construction elements such as the manure storage tank ($201,580–$535,500), the roofed heavy use area structure ($451,542–$683,200), and various infrastructure components.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Cost Selected #
Selected ($) # Locked Items Selected Lowest QuanƟtyRequired UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost UnitPrice TotalCost
#1-1 FALSE Erosion & Sedimentation Controls, Final Site Stabilization (Lump Sum) $ 0 $ 4,655.0 1 $ 40,874.0 $ 40,874.0 $ 29,130.0 $ 29,130.0 $ 53,000.0 $ 53,000.0 $ 4,655.0 $ 4,655.0 #1-2 FALSE 31,104 Cu. Ft. slatted liquid under-barn manure storage tank & footer drain (Lump Sum) $ 0 $ 201,580.0 1 $ 219,365.0 $ 219,365.0 $ 295,400.0 $ 295,400.0 $ 535,500.0 $ 535,500.0 $ 201,580.0 $ 201,580.0 #1-3 FALSE 62'W x 240'L roofed Heavy Use Area/Manure Storage Structure & footer drain (Lump Sum) $ 0 $ 451,542.0 1 $ 451,542.0 $ 451,542.0 $ 504,600.0 $ 504,600.0 $ 683,200.0 $ 683,200.0 $ 475,460.0 $ 475,460.0
#1-4 FALSE
Curbing, Collection box, Dropbox, Underground Piping for runoff from existing unroofed lots to liquid under-barn manure storage tank (Lump Sum) $ 0 $ 22,385.0 1 $ 45,793.0 $ 45,793.0 $ 67,100.0 $ 67,100.0 $ 42,200.0 $ 42,200.0 $ 22,385.0 $ 22,385.0
#1-5 FALSE 567 ft of stone access road for access to structure (Lump Sum) $ 0 $ 23,110.0 1 $ 27,958.0 $ 27,958.0 $ 46,100.0 $ 46,100.0 $ 44,400.0 $ 44,400.0 $ 23,110.0 $ 23,110.0
#1-6 FALSE
-Roof Gutters for Existing Barn & Planned Structure; -Underground Piping for Roof Runoff;
-Underground Piping for Footer Drain outlet; -Rock Apron for pipe outlets (Lump Sum) $ 0 $ 38,390.0 1 $ 38,390.0 $ 38,390.0 $ 56,520.0 $ 56,520.0 $ 53,900.0 $ 53,900.0 $ 42,410.0 $ 42,410.0
#1-7 FALSE
Grass Diversion to direct upslope water around planned structure; include seeding & mulching using Erosion Control Blanket (Lump Sum) $ 0 $ 8,620.0 1 $ 44,952.0 $ 44,952.0 $ 36,190.0 $ 36,190.0 $ 9,100.0 $ 9,100.0 $ 8,620.0 $ 8,620.0
#1-8 FALSE 825 ft of stone animal walkway (Lump Sum) $ 0 $ 23,455.0 1 $ 23,455.0 $ 23,455.0 $ 44,520.0 $ 44,520.0 $ 39,200.0 $ 39,200.0 $ 25,605.0 $ 25,605.0 #1-9 FALSE 40' long slatted stream crossing (Lump Sum) $ 0 $ 13,195.0 1 $ 16,056.0 $ 16,056.0 $ 21,900.0 $ 21,900.0 $ 54,400.0 $ 54,400.0 $ 13,195.0 $ 13,195.0 #1-10 FALSE (2) Water Hydrants, 1325 ft buried water pipeline, 1290 ft surface water pipeline (Lump Sum) $ 0 $ 15,875.0 1 $ 28,863.0 $ 28,863.0 $ 25,900.0 $ 25,900.0 $ 45,800.0 $ 45,800.0 $ 15,875.0 $ 15,875.0 #1-11 FALSE Manual controlled curtain along Heavy Use Area (Ft) $ 0 $ 12,015.0 150 $ 128 $ 19,200.0 $ 114 $ 17,100.0 $ 140 $ 21,000.0 $ 80.1 $ 12,015.0 #1-12 FALSE Interior metal fencing, gates, slantbars, headlocks in heavy use area (Lump Sum) $ 0 $ 35,900.0 1 $ 37,124.0 $ 37,124.0 $ 35,900.0 $ 35,900.0 $ 44,100.0 $ 44,100.0 $ 36,690.0 $ 36,690.0 #1-13 FALSE Ball Float style waterers for heavy use area (Ea) $ 0 $ 1,640.0 2 $ 975 $ 1,950.0 $ 1,355.0 $ 2,710.0 $ 900 $ 1,800.0 $ 820 $ 1,640.0 #1-14 FALSE 160 PSI 1.25-inch sch-40 buried livestock pipeline to supply heavy use area waterers (ft) $ 0 $ 1,179.996 600 $ 21 $ 12,600.0 $ 5.8 $ 3,480.0 $ 40 $ 24,000.0 $ 1.96666 $1,180.0 #1-15 FALSE 12' wide overhead garage-style type doors on heavy use area (Ea) $ 0 $ 6,555.0 2 $ 4,387.0 $ 8,774.0 $ 5,950.0 $ 11,900.0 $ 4,600.0 $ 9,200.0 $ 3,277.5 $ 6,555.0 #1-16 FALSE Metal Siding around perimeter of manure storage & portion of heavy use area (Ft) $ 0 $ 6,124.999814999999235 $ 82 $ 19,270.0 $ 71 $ 16,685.0 $ 90 $ 21,150.0 $ 26.063829 $6,125.0
Livestock Project (16)
0 0 0 0 $ 0 $ 0 $ 0 $ 0
Gordon H. Baver, Inc King Construction Twining Construction White Horse Construction Inc $ 1,036,166.0 $ 1,215,135.0 $ 1,681,950.0 $ 897,099.995815