Summary of Division 2 Detailed Specifications for Pennsauken Community Pool Improvements
This document is a comprehensive set of detailed specifications and technical requirements for the Pennsauken Township, New Jersey Community Pool Improvements project. The specifications govern construction activities including site clearing and preparation, excavation, drainage infrastructure, concrete work, pool construction and amenities, electrical systems, and landscaping. Major work components include removal of existing pool coping and bottom, installation of new reinforced concrete pool floors and walls, construction of concrete stairs and decking, installation of a water slide, shade structure, ADA pool lift, diving board, and associated pool systems. The project requires compliance with the 2019 U.S. Customary English Standard Specifications for Road and Bridge Construction from the New Jersey Department of Transportation, as amended. Specific quantities are detailed for various construction items such as 354 linear feet of existing concrete walkway removal, 664 linear feet of chain link fence removal, and 575 linear feet of pool coping removal. Contractor minimum wage rates are determined by the New Jersey Department of Labor, and the contractor must maintain compliance with soil erosion and sediment control standards throughout construction. All work must be performed according to approved plans and subject to engineer inspection and approval.
The specifications establish detailed material requirements, construction procedures, quality assurance standards, and measurement and payment terms for each work category. Soil erosion and sediment control measures are included in the prices bid for items requiring same, with separate payment not made for these controls. Mobilization and demobilization payments are made on a lump-sum basis in scheduled increments as project work progresses, capped at ten percent of the total contract price. Concrete work requires minimum 28-day compressive strength of 4,000 to 4,500 psi depending on application, with air content and water-cement ratio specifications for freeze-thaw and waterproof applications. Pool-specific work includes epoxy coating, bullnose coping installation, perimeter tile, lane line painting, and spray pad features manufactured by RainDrop. All contractors must demonstrate a minimum of five years' experience in public pool construction and provide references for five comparable projects completed within two years prior. Submittals for major components such as pool coatings, tiles, spray features, shade structures, water slides, and pool lifts require engineer approval prior to ordering. The project involves coordination with utility companies, particularly PSE&G for electrical service relocations, and requires electrical bonding of pool equipment in accordance with NEC Article 680.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pennsauken_Community_Pool_Improvements.pdf | ||
| State_Rates.pdf | ||
| 274104254-camden-10-1-2026.pdf | ||
| 26-09-30_Pennsauken_Pool_-_R2_-_Plan_Set.pdf | ||
| 11_-_Spec_Prov.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2-1
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
DIVISION 2
DETAILED SPECIFICATIONS
TABLE OF CONTENTS
SECTION 2 - GENERAL 2
SECTION 154 - MOBILIZATION 4
SECTION 158 - SOIL EROSION AND SEDIMENT CONTROL AND WATER QUALITY CONTROL 4
SECTION 160 – PRICE ADJUSTMENTS 8
SECTION 201 - CLEARING SITE 9
SECTION 202 - EXCAVATION 13
SECTION 301 - SUBBASE 18
SECTION 302 - AGGREGATE BASE COURSE 19
SECTION 601 – PIPE 19
SECTION 602 – DRAINAGE STRUCTURES 22
SECTION 605 – FENCE 24
SECTION 606 – SIDEWALKS, DRIVEWAYS AND ISLANDS 26
SECTION 613 – POOL CONSTRUCTION 31
SECTION 614 – POOL AMMENTIES 33
SECTION 615 – POOL SYSTEMS 36
SECTION 651 - WATER 37
SECTION 652 – SANITARY SEWERS 47
SECTION 701 – GENERAL ELECTRICAL ITEMS 54
SECTION 803 - PREPARATION OF EXISTING SOIL 57
SECTION 804 - TOPSOILING 58
SECTION 806 - HYDROSEEDING 59
SECTION 810 - MOWING 60
SECTION 901 - AGGREGATE 61
SECTION 903 - CONCRETE 62
SECTION 905 - REINFORCEMENT METALS 64
SECTION 909 – DRAINAGE 65
SECTION 914 - JOINT MATERIAL 66
SECTION 917 - LANDSCAPING MATERIALS 67
SECTION 919 - MISCELLANEOUS 68
2-2
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
The following section is added to the Standard Specifications:
SECTION 2 - GENERAL
2.01 AUTHORIZATION OF CONTRACT
The contract for this project is authorized by the provisions of local public contracts law, NJSA 40A: 11-1 et seq.
2.02 SPECIFICATIONS TO BE USED
The 2019 U.S. Customary English Standard Specifications for Road and Bridge Construction, of the New Jersey Department of Transportation and as amended herein, shall govern the construction of this project.
2.03 WAGE RATES
The contractor shall pay the minimum wage rates determined by the New Jersey Department of Labor.
State wage rates may be obtained from the New Jersey Department of Labor (609-292-2259). The State wage rates in effect at the time of award will be made a part of this contract, pursuant to Chapter 150, Laws of 1963 (NJSA 34:11-56.25 et seq.).
In the event it is found that any employee of the contractor or any subcontractor covered by the contract, has been paid a rate of wages less than the minimum wage required to be paid by the contract, the contracting agency may terminate the contractor's or subcontractor's right to proceed with the work, or such part of the work, as to which there has been a failure to pay required wages and to prosecute the work to completion or otherwise.
The contractor and his sureties shall be liable to the contracting agency for any excess costs occasioned thereby.
2.04 GENERAL
Whenever any section, subsection, subpart or subheading is amended by such terms as changed to, deleted or added it is construed to mean that it amends that section, subsection, subpart or subheading of the 2019 NJDOT Standard Specifications for Road and Bridge Construction unless otherwise noted.
Whenever reference to page number is made, it is construed to refer to the 2019 NJDOT Standard Specifications for Road and Bridge Construction unless otherwise noted.
Henceforth in this supplementary specification whenever reference to the State, Commissioner, Department, Engineer or Inspector is made, it is construed to mean the particular municipality or county executing this contract.
Whenever reference to Title 27 is made, it is construed to mean Title 40.
2.05 TERMINOLOGY
In addition, the following terms are herein amended:
COMMISSIONER. Change all reference to the Owner.
DEPARTMENT. Change all reference to the Owner.
DEPARTMENT LAB. The testing lab under contract to the Owner or any other Testing Lab specified in the Supplemental Specifications.
ENGINEER. The Owner's Engineer or his duly authorized representative.
INTERAGENCY ENGINEERING COMMITTEE. Delete all reference to this committee in the specifications.
RESIDENT ENGINEER. The Owner's Engineer or his duly authorized representative.
STATE. Change all reference to the Owner.
2.06 MATERIALS
2-3
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
Materials or assemblies as specified will be accepted on the basis of certificates of compliance stating that such materials or assemblies fully comply with the requirements of the contract.
Materials or assemblies used on the basis of certificates of compliance may be sampled and tested at any time and, if found not to be in conformity with the contract requirements, will be subject to rejection whether in place or not. The contractor shall require the manufacturer or supplier to furnish three copies of certificates of compliance with each delivery of materials, components and manufactured items that are acceptable by certification. One copy shall be furnished to the Engineer, one copy shall be furnished to the District Office Bureau of Local Aid (if the project has received funding through the "1984 Trust Fund Authority Act") and one copy shall be retained by the Contractor.
Certificates of compliance shall contain the following information:
1. Project and location to which the material is consigned.
2. Name of the contractor to which the material is supplied.
3. Kind of material supplied.
4. Quantity of material represented by the certificate.
5. Means of identifying the consignment, such as label marking, seal number, etc.
6. Date and method of shipment.
7. Statement that the material has been tested and found in conformity with the pertinent contract requirements stated in the certificate.
8. Signature of a person having legal authority to bind the supplier.
9. Signature attested to by a notary public or other properly authorized person.
Payments relative to materials specified to be accepted on the basis of certificates of compliance shall not be made until the Engineer has in his possession an acceptable certificate of compliance.
2-4
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 154 - MOBILIZATION
154.01 DESCRIPTION
154.02 MATERIALS
154.03 PROCEDURE
154.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Delete the entire text of this Article and substitute the following:
The following is added:
Payment for mobilization and demobilization will be made on a lump sum basis regardless of the fact that the Contractor may have, for any reason, shut down its work on the project or moved equipment away from the project and back again.
Payment will be made in accordance with the following schedule:
1. When five percent of the work is completed, and the progress schedule is submitted to the engineer, 25 percent of the lump sum bid for mobilization or 2.5 percent of the total contract price, whichever is less, will be paid.
2. When ten percent of the work is completed, and required project schedule updates are submitted to the engineer, 50 percent of the lump sum bid for mobilization or five percent of the total contract price, whichever is less, will be paid.
3. When 15 percent of the work is completed, and required project schedule updates are submitted to the engineer, 75 percent of the lump sum bid for mobilization or 7.5 percent of the total contract price, whichever is less, will be paid.
4. When 20 percent of the work is completed, and required project schedule updates are submitted to the engineer, 100 percent of the lump sum bid for mobilization or ten percent of the total contract price, whichever is less, will be paid.
5. When all work on the project is complete, payment for the lump sum bid for mobilization in excess of ten percent of the total contract price will be made.
6. The percentage of work completed shall be the total of payments earned compared to the total contract price. The total of payments earned excludes the amount paid for this item and the amount paid for materials furnished but not incorporated into the work, if any.
7. No payments will be made for mobilization until a progress schedule is submitted, except when all work on the project is complete, then 50 percent of the lump sum bid for mobilization will be paid and no further payment(s) will be made for the lump sum bid for mobilization.
Pay Item Pay Unit
MOBILIZATION AND DEMOBILIZATION LINEAR FOOT
SECTION 158 - SOIL EROSION AND SEDIMENT CONTROL AND WATER QUALITY CONTROL
158.01 WORK INCLUDED
The following is added to this subsection:
2-5
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
"Soil Erosion and Sediment Control" shall include the furnishing of all materials, labor, and equipment necessary for implementing proper measures to reasonably control soil erosion from construction operations and prevent excessive flow of sediment from the construction site. Such work may include the installation of water diversion structures, diversion ditches and sediment basins, compaction testing, compaction mitigation, seeding and mulching, and sodden critical areas to provide temporary protection. All work shall be performed in accordance with the approved soil erosion plan and detail sheets.
158.02 MATERIALS
The following is added to this subsection:
Materials shall conform to the requirements of appropriate articles of "Standard for Soil Erosion and Sediment Control in New Jersey" as adopted January 2014, revised July 2017, and the Standard Specification for Road and Bridge Construction of the New Jersey Department of Transportation, 2019 as added to and amended. Such standard specifications are made part of the specifications by this reference and will not be repeated herein. In case of conflict between the above-mentioned requirements, the standard requiring the higher in terms of quality of materials and workmanship shall prevail.
Embankment shall be Zone 3 conforming to Subsection 203.02.01.
Pipe for temporary slope drains shall be a minimum size of 8 inches and shall conform to Section 909.02. End sections and elbows shall be of the same material as the pipe to which they are to be joined.
Other materials shall conform to the following subsections:
Topsoil Stabilization Matting 917.08
158.03 CONSTRUCTION
The following is added to this subsection:
In the event that temporary soil erosion and sediment control measures are required due to the contractor's failure, for any reason, to install or maintain soil erosion and sediment controls, either as part of the work or as directed, such work shall be performed by the contractor at no cost to the Owner.
The work on soil erosion and sediment controls shall also include, but not be limited to, the following:
1. All soil erosion and sediment control practices on this project shall be constructed in accordance with the "Standards for Soil Erosion and Sediment Control in New Jersey", or as approved for this project.
2. The smallest practicable area of land shall be exposed at any one time during the project and wherever feasible, natural vegetation shall be retained and protected. Stripping of vegetation, grading or other soil disturbance shall be done in a manner which will minimize soil erosion.
3. Schedule of construction operations shall be submitted to the Engineer for his approval.
4. A 72-hour notice shall be given to the Engineer and appropriate Soil Conservation District Office prior to the start of construction or grading. This notice can be verbal but must be followed by a written statement not less than forty-eight (48) hours prior to start-up.
5. All soil erosion and sediment control devices shall be in place prior to any major soil disturbance or installed and removed in their proper sequence to allow for further operations on the site.
6. All sediment control structures shall be checked and maintained on a regular basis and all basins shall be cleaned periodically when storage capacity is affected by siltation.
7. During construction, any additional control measures as deemed necessary to prevent erosion or sediment beyond those measures shown on the approved plans shall be installed or employed at the direction of the Engineer.
8. After completion of construction, soil and sediment controls shall be left in place until all disturbed areas are stabilized.
2-6
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
9. Disturbed areas including roadway embankments shall be maintained in a rough graded condition and temporarily seeded and/or mulched until proper weather conditions exist for the establishment of permanent vegetative cover.
10. All areas disturbed by grading on which permanent or semi-permanent seeding or temporary seeding have not been made and all slopes with a grade steeper than 2:1 shall be treated by mulching. The mulch shall be applied at a rate of 2 tons per acre or equivalent measure, according to State standards.
11. All areas disturbed by grading including soil stockpiles, which will not be used or constructed upon a period greater than thirty (30) days shall be temporarily seeded and protected as required.
12. All areas disturbed by grading which will not be constructed upon within six (6) months are to be stabilized with a permanent type seeding and fertilizing.
13. Prior to installation of required topsoil in open areas, all compaction testing, and/or compaction mitigation measures (tilling or discing) to the subsoils, shall be completed, as set forth in the “Standards for Soil Erosion and Sediment Control in New Jersey”, specifically the ‘Standards for Topsoiling’ and the ‘Standards for Land Grading’.
All compaction testing shall be completed in the presence of the Engineer.
14. All disturbed areas shall be topsoiled, limed and fertilized prior to both temporary and permanent seeding in conformance with charts and tables as set forth in the "Standards for Soil Erosion and Sediment Control in New Jersey".
15. Hay bales shall be deemed unacceptable filter material in areas greater than one-half (1/2) acre.
16. Access and haul roads shall be protected with stone access strips and coarse stone filters in appropriate locations.
17. Fording of streams shall be kept to a minimum and where frequent crossings are contemplated, temporary bridges or culverts shall be constructed.
18. Storm drainage inlets are to be either capped or protected by temporary filter devices to prevent the entry of sediment carried by runoff water until vegetation and/or paving is established as planned.
19. Wherever well points, pumps or other dewatering methods are used, care shall be taken to provide for the elimination of said dewatering.
20. All drainage swales shall be parabolic in shape unless otherwise noted and shall conform to SCS design and standards.
21. Drainage swales and other structures shall be located in the field so as to retain as much of the original vegetation as possible, especially in the case of large trees.
22. Soils having a pH of 4 or less or containing iron sulfide shall be covered with a minimum of 12 inches of soil having a pH of 5 or more before seedbed preparation. The added soil shall be limed.
23. Roadways shall be swept at the end of each working day by the contractor. When deemed necessary by the Engineer, the contractor shall have the roadways swept by a mechanical sweeper. Same shall be provided at no additional cost to the Owner.
24. All soil erosion and sediment control devices shall be removed at the completion of the construction project or at such time when all disturbed areas are stabilized.
25. The contractor is advised that the proposed soil erosion and sediment control measures are subject to the Engineer's review and approval and shall be verified prior to the installation of the same.
Should the construction driveway fail to minimize the tracking of soils onto existing roadways, alternate methods acceptable to the Owner, local police department and/or engineer shall be immediately implemented by the contractor.
The amount of surface area of erodible earth material exposed at one time by clearing and grubbing, excavation, borrow or fill operations, without stabilization, shall not exceed 750,000 square feet for clearing and grubbing
2-7
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc operations, or 750,000 for grading operations without prior approval. The engineer may increase or decrease these amounts commensurate with the contractor's capability and progress in keeping the construction current with the approved progress schedule.
158.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Delete the entire text of this Article and substitute the following:
Separate measurement shall not be made for soil erosion and sediment control.
Separate payment will not be made for soil erosion and sediment control.
Payment for soil erosion and sediment control will not be made, including all compaction testing, and/or compaction mitigation (tilling or discing) measures. Payment for Soil Erosion and Sediment Control, including all work and materials as detailed above and required by the soil erosion control plan and FSCD Certification, including the removal of such measures at completion of the construction project or at such time when all disturbed areas are stabilized, shall be included in the price bid for items requiring same.
2-8
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 160 – PRICE ADJUSTMENTS
NOT IN CONTRACT
2-9
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 201 - CLEARING SITE
201.01 DESCRIPTION
This article of the Standard Specification is amended as follows:
Add the following to this Article:
All tree stumps shall be grubbed out within the limits of the project.
Clearing Site shall also include the removal of all trees, brush, weeds, roots, matted leaves, small structures, debris, and other objectionable material, vegetation and growth, trimming of shrubs and hedges, and the relocation of existing fences where directed.
Clearing site shall also include the removal of all obstructions either standing or fallen within the limit of construction and for which payment is not provided for in the contract.
Clearing site shall also include the removal and salvaging of existing inlet or manhole frames, covers, or grates, benches, as well as the delivery of any of these items not utilized in this construction contract to the Owner.
The removal of existing storm drains where required on the plan and backfilling with suitable excavated materials from the project site shall be performed in accordance with the provisions of Sections 202, 203 and 601 of the Standard Specifications.
The contractor shall notify the utility companies prior to the start of construction and shall schedule his work so as not to be unnecessarily delayed by the utility companies, nor should he unnecessarily delay the utility companies from performing their work.
Clearing site shall also include restoration of all grassed area, driveways, pavement areas, and all else disturbed outside the limit of work and the cleaning of existing inlets, manholes, and storm sewers to provide positive flow from proposed storm sewer discharges into the existing storm sewer system.
201.02 MATERIALS
201.03 CONSTRUCTION
201.03.01 Clearing Site
A. Preparation
B. Clearing and Grubbing
The following is added:
All trees to be removed shall be done so by persons certified in New Jersey to work adjacent to overhead electrical lines.
C. Plugging Pipe
E. Removing Pipe, Inlets and Manholes
This article of the Standard Specifications is amended as follows:
Perimeter drainage pipe shall be removed where directed in the Drawings.
Add the following paragraphs to this Article of the Standard Specifications:
If the area where pipes, inlets, or manholes lay outside of proposed pavements, backfill shall be with suitable excavated materials from the project. Backfill of excavated areas within proposed pavement areas shall be made with suitable excavated materials from the site, dense graded aggregate base course or soil aggregate Type I-3, as directed by the Engineer.
2-10
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
No payment will be made for backfill with suitable excavated materials from the job site. Payment for backfill with soil aggregate Type I-3 and dense graded aggregate base course, where directed, will be made at the unit price bid for these items in the proposal.
All structures not to be removed during construction shall be protected throughout the duration of construction.
All costs shall be included in the lump sum price bid for Clearing and Preparation of Site.
F. Removing Sidewalks, Driveways, Curb and Gutters
The following is added:
Remove and dispose of existing concrete walkways, including bedding, where directed in the Drawings.
Payment for removal of existing concrete shall include the sawcutting.
All costs shall be included in the lump sum price bid for Clearing and Preparation of Site.
G. Removing Electrical Material and Equipment
Existing electrical conduit, wiring, and appurtenances within the clearing limits shall be removed under the lump sum pay item. The Contractor shall coordinate with the owning utility to de-energize and disconnect all conductors prior to removal, in accordance with utility requirements and OSHA regulations. Conduit shall be removed complete with fittings, junction boxes, and hardware, except where noted to remain and be protected in place.
Removed material shall be disposed of off-site unless the Engineer directs salvage and delivery to the Owner, at no additional cost.
All costs shall be included in the lump sum price bid for Clearing and Preparation of Site.
H. Remove Existing Pool Coping
Existing pool coping shall be removed in its entirety, including all associated mortar, sealant, as shown on the plans or as directed by the Engineer. Removal shall be performed in a manner that avoids damage to the pool shell, deck, and adjacent improvements to remain. Any damage caused by the Contractor's operations shall be repaired at no additional cost to the Owner. Removed coping and debris shall be disposed of off-site in accordance with all applicable regulations.
All costs shall be included in the lump sum price bid for Clearing and Preparation of Site.
I. Remove Main Concrete Pool Bottom
Existing pool bottom to be removed where directed in the Drawings or as directed by the Engineer.
All costs shall be included in the lump sum price bid for Clearing and Preparation of Site.
J. Remove Existing Horseshoe Pit and Post and Rail Fence
Contractor shall remove existing horseshoe pit and post and rail fence as directed in the Drawings or by the Engineer. Pit decking, post, and rail fence to be disposed of offsite. Sand pit to remain for regrading during construction.
K. Remove and Relocate Existing Light Poles (To Be Coordinated with PSE&G)
Contractor shall coordinate directly with PSE&G prior to and during construction for the relocation of the existing light pole shown on the plans. Coordination shall include, but not be limited to, scheduling of disconnection and reconnection of electrical service, confirmation of the proposed relocation location and any required easement or clearance requirements, and sequencing of work to minimize service interruption.
L. Removing and Dispose of Existing Chain Link Fence, (Including Foundations)/
Contractor shall remove and dispose of the existing chain link fence, to the limits shown on the Drawings, or as directed by the Engineer. Material shall be disposed of off-site.
2-11
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
201.03.02 Clearing Site, Bridge and Clearing Site, Structure
201.03.03 Temporary Shielding
201.03.04 Removing Underground Storage Tanks (NOT INCLUDED IN CONTRACT)
201.03.05 Monitoring Wells
201.03.06 Sealing Abandoned Wells (NOT INCLUDED IN CONTRACT)
201.03.07 Demolition (NOT INCLUDED IN CONTRACT)
201.03.08 Asbestos Removal
201.03.09 Disposal of Removed Materials and Debris
201.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Delete the entire text of this Article and substitute the following:
Measurement and payment will be made under:
CLEARING AND PREPARATION
OF SITE
LUMP SUM
1,607 SY REMOVE AND DISPOSE OF EXISTING CONCRETE WALKWAYS,
INCLUDING BEDDING
354 LF REMOVE AND DISPOSE OF EXISTING CHAIN LINK FENCE, INCLUDING
FOUNDATIONS
664 LF REMOVE EXISTING POOL COPING
575 LF REMOVE EXISTING PERIMETER DRAINAGE PIPE
722 LF REMOVE EXISTING PERIMETER ELCTRICAL CONUDIT AND WIRING
1 LS ACQUISITION, INSTALLATION, AND MANAGEMENT OF LAMINATED MATS
OR OTHER SOIL AUGMENTATION OR SUPPORT TECHNIQUES TO MINIMIZE
EFFECT OF SOFT SPOTS ON CONSTRUCTION ACTIVITIES
Add the following:
The bidder is advised that a maximum bid price has been set for the lump sum price indicated for site clearing.
Payment for any and all items associated with clearing site in excess of the maximum bid price indicated shall be included in the prices bid for all items requiring the same.
Separate payment will not be made for the items associated with clearing site for which individual pay items have not been provided in the contract. Payment shall be included in the price bid for clearing site, and/or the prices bid for all items requiring the same.
Separate measurement and payment will not be made for clearing site with exception to the following:
Payment for the removal of storm drainage structures and storm sewer pipes, sanitary sewer manholes and hydrant assemblies shall be made based on the actual number of storm drainage structures, sanitary sewer manholes and hydrant assembly removed. Separate payment will not be made for the removal of storm drainage pipes, structures and hydrant assemblies that are located within trenches for proposed utility lines.
2-12
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
Separate measurement and payment will not be made for the delivery of salvaged signs, castings, and hydrant assemblies to their respective owners.
Payment for clearing site shall be made commensurate with the total value of work completed on the project as determined by the engineer.
2-13
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 202 - EXCAVATION
202.01 DESCRIPTION
The following is added to this Article of the Standard Specifications:
The excavations shall be made to conform with the lines of the finished grades and structures wherever practical.
The excavations shall not be carried below the required grades by machine and back-filled to the grade of foundations, bottom slabs, footings, or pipelines. The trench in which pipe, manholes, or inlets are to be constructed shall be excavated from the surface and to such depths and widths (not less than 12 inches greater than the maximum external dimension of the structure) as will give suitable room for bracing and supporting, pumping and draining, and for removing from the excavation any material which the Engineer may deem inadequate for foundation. All excavations shall be of sufficient width to permit work to be done completely, in the manner intended and of the size specified and/or shown on the plans.
The length of the trench to be opened or the area of the surface to be disturbed and restored at any time will be limited by the Engineer with regard both to expeditious construction, and convenience to the Owner. New trenches will not be excavated if previous trenches are in need of back-filling or labor is needed to restore the surface of the ground to a safe and proper condition.
Trenches for pipes shall be a minimum of 2' wider at the bottom than the outside diameter of the pipe and shall not remain open in excess of 50' in length nor remain open overnight.
Excavation for subsurface structure shall also include the excavation required to provide compacted granular bedding as shown in the Construction Details. Whenever the material at the bottom of a bedding or other subsurface structure excavation is soft or otherwise unsuitable, it shall be removed to such depth as the Engineer may require and the space back-filled with Coarse Aggregate Type 57.
All excavations for pipelines shall be clear of boulders, rock, masonry, or other similar material which shall be excavated to a level at least six inches below the bottom of the pipe, and carefully refilled with approved material mechanically compacted to provide a stable subbase. Rock or boulders shall be removed from sides of trenches to 12 inches outside the wall of the pipe, unless permission to do otherwise is expressly given. Gravel or stone bedding shall be provided, placed and compacted to the minimum depths when indicated on the plans. The bottom of the trench shall be excavated where the earth is suitable for good foundation to the form and size of the lower portion of the pipe or other structure, so that there shall be full and adequate support for the structure which is to be built on it. Ample excavation shall be made under and around the pipe joints for jointing and to relieve the bell of shearing forces.
Excavation, unclassified, shall also include removal of hot mix asphalt pavement overlay, hot mix asphalt pavement, and reinforced and non-reinforced concrete pavement.
In addition, excavation, unclassified, shall include the sawcutting of the existing pavement. This shall be at a distance of one foot from the edge of the existing pavement that is to remain in place to form a proper bond between the new pavement and the existing pavement, or as directed by the Engineer.
Excavation, unclassified, shall also include, as required, the separation and temporary stockpiling of suitable earth materials from excavation and the rehandling of the stockpiled materials for the construction of the roadway embankments, subbase, base courses and backfill if and where directed by the Engineer.
Excavation, unclassified, shall also include removal of unsuitable material in cut sections disclosed by proof rolling.
Where rock is encountered at the locations of the proposed inlets, manholes, and headwalls, the rock shall be dressed to level beds as directed by the Engineer.
Unauthorized Excavation
Special care will be taken with the final six inches of all excavations. In no case shall the excavation be carried below grade by machine and backfill used to establish the required grade. Where the excavation has been carried below grade through error or because of slides or cave-ins, the contractor shall at his own expense restore such areas with 3/4 inch graded gravel or crushed stone or as directed by the Engineer. If the Contractor excavates
2-14
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc below the required grade for structures, the overexcavation shall be filled with material subject to the requirements of the Engineer. The material may include 2000 psi concrete if so ordered by the Engineer.
Sheeting and Bracing
Where necessary for safety or to prevent disturbance, damage, or settlement of adjacent structures, pipelines, utilities, improvements, or paving, excavations shall be sheeted and braced. Any damage to new or existing structures occurring through settlement, water or earth pressure, or other causes due to inadequate construction procedures of the Contractor in any other manner, shall be repaired by the Contractor at his own expense.
Dewatering and Protection from Flooding
The Contractor shall dewater the excavations promptly and continuously throughout the progress of the work and shall keep the excavations dry at all times until the structures to be built therein, are completed. Where work is to be performed below groundwater level, the Contractor shall provide, operate and maintain dewatering facilities sufficient to maintain the excavation free from groundwater for the time required to complete the work in the proper workmanlike manner.
The Contractor shall protect uncompleted work from flooding during storms or from other causes. All pipelines or structures not stable against uplift during construction or prior to completion shall be thoroughly braced or otherwise protected.
All necessary precautions shall be taken to prevent disturbance of, and to properly drain, the areas upon which concrete is poured, and upon which pipe is to be laid. All concrete shall be kept dry for one month after pouring except curing.
All water pumped and bailed from the trench or other excavation shall be conveyed in a proper manner through an approved settling basin and to a suitable point of discharge by the Contractor at his own expense.
Construction Safety
The Contractor shall follow the various requirements contained in the Construction Safety Code, latest edition, as prepared by the State of New Jersey, Department of Labor and Industry, Bureau of Engineering and Safety. In addition, the Contractor shall comply with the "Construction Safety and Health Regulations" of the Occupational Safety and Health Administration, Title 29, Chapter XVII, Part 1926 or latest revision.
Protection of Existing Pipelines and Structures
Care shall be taken not to relocate without the consent of the Engineer any sewers, drains, culverts, water or gas pipes or structures near them that could affect their stability. All utilities shall be securely hung, braced, or supported in place until the work is completed. Whenever it is necessary to interfere with said structures or pipelines, the Contractor shall maintain their services at his own expense and repair all damages caused by his act or neglect of work. The integrity of all pipelines and structures shall be maintained throughout the construction and same shall be left in an equivalent condition or improved condition after completion of construction.
Adequate precautions shall be taken to prevent settlement of existing improvements.
In case water pipes, gas pipes, conduits, or other utilities become damaged or broken in the prosecution of the work, the Contractor shall give immediate notice to the proper authorities and shall be responsible for any damage to persons or property caused by such breaks. Failure to give prompt notice to the authorities shall make the Contractor responsible for any needless loss of water or gas, or for interruption of services.
When house connections or service pipes supplying water or gas as well as underground sprinkler systems are broken during construction, the Contractor shall repair them at his own expense. Delays, such as would result in adjoining buildings having to do without water or gas for a needlessly long period, will not be tolerated. The Municipality reserves the right to remedy such delays by ordering outside parties to make such repairs at the expense of the Contractor.
If so directed in writing, the Contractor shall make permanent changes in the location of water mains if they are obstructing the new structures to be built. The cost of such changes will be paid for as extra work based on the valuation made by the Engineer and depend on his decision as to whether the work done is or is not included in the work required and bid for by the Contractor under the contract. In rendering all such accounts, the Contractor
2-15
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc shall itemize both the labor and materials involved and provide other information as may be required by the Engineer.
Underground Objects and Utilities
Information as to the location of existing utilities has been collected from various sources, but the results of such investigations are shown on the contract drawings and are not guaranteed as to accuracy. The Contractor is particularly directed to the fact that underground objects or material location, elevation, or type is not warranted to be approximately correct (nor can they be assumed to be the only subsurface objects or materials which may be encountered in the work). The Contractor shall make all necessary investigations to satisfy himself as to the existing conditions prior to bidding work, including the locating of existing underground sprinkler systems.
202.02 MATERIALS
202.03 CONSTRUCTION
202.03.01 STRIPPING
This Article of the Standard Specifications is amended as follows:
Strip vegetation and underlying soil to a depth of 4 to 6 inches below the existing ground surface. Topsoil must be stored on the job site. The removal of excess topsoil from the project must not be done until completion of all topsoiling work and upon the approval of the Engineer.
The contractor shall make his own arrangements for storing topsoil materials. If topsoil materials are to be stored on private property, the contractor shall obtain and deliver to the Engineer written releases from the owners of the property for the storage.
Before trench excavation, the Contractor shall strip the existing topsoil and store for future use.
202.03.02 EXCAVATING TEST PITS
202.03.03 EXCAVATING UNCLASSIFIED MATERIAL
A. Excavating
The following is added to this Article of the Standard Specifications:
Excavation shall be carried out to the elevations or depths shown on the plans prior to proofrolling.
The contractor shall take special precautions necessary to prevent damaging any existing utilities. He shall be held liable for repairs of any damage done to these utilities.
1. Wet Areas
2. Foundation and Bridge Areas
3. Rock Areas
This Article of the Standard Specifications is amended as follows:
Delete the third paragraph of this article and substitute the following:
If it is determined that in-place stabilization is required, use rock bolting or other stabilization techniques as directed. Blasting is prohibited.
The following is added to this subsection:
4. SAWCUT
This work shall consist of making longitudinal and transverse cuts in existing pavement as directed by the engineer.
2-16
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
Sawcuts shall be made with an approved power saw full depth in order to prevent damage to the existing pavement, sidewalk, driveways or curbs and to provide a neat edge for the adjacent proposed sidewalk, driveways or curbs as shown on the plans or as directed by the engineer.
B. Temporary Storing
The following is added to this Article of the Standard Specifications:
The contractor shall make his own arrangements for storing suitable excavated materials. If any such materials are to be stored on private property, the contractor shall obtain and deliver written releases from the owners of the property being used for storage to the Engineer. The contractor shall be responsible for phasing his operation in order to use suitable excavated materials in the embankment areas.
C. Measuring Elevation
202.03.04 EXCAVATING REGULATED MATERIAL
202.03.05 EXCAVATING ACID PRODUCING SOIL (APS)
202.03.06 REMOVING PAVEMENT
202.03.07 REUSE OR DISPOSAL OF EXCESS MATERIAL
This subsection of the standard specifications is amended as follows:
Excess excavated earth may be permitted to be reused to widen or flatten slopes of embankment, or to fade embankments into cuts, or reuse as approved at other locations or disposed of.
Excess rock excavation may be permitted to be used along slopes adjacent to streams for slope protection in accordance with Subsection 603.
Excess broken concrete and bituminous concrete may be permitted to be used in the construction of embankments in accordance with subsection 203.
Excess material other than earth or rock not used as specified above shall be recycled or disposed of in accordance with Subsection 201.03.09.
Excess earth or rock not used as specified above and unusable soil or rock shall be placed at sites provided by the contractor outside of the project.
Unsuitable material shall be disposed of offsite at locations secured by the Contractor.
202.03.08 DISPOSAL OF REGULATED MATERIAL
202.03.09 DISPOSAL OF REGULATED MATERIAL, HAZARDOUS
The following subsections are added to this Article of the Standard Specifications:
202.03.09.01 REMOVAL OF EXISTING SANITY SEWER
The contractor shall remove all sanitary sewer mains, manholes, laterals, risers, and cleanouts as indicated on the plans or as directed. Manholes, mains and laterals shall be flushed clean of all sewage prior to removal. The manholes, mains, laterals and all debris shall be disposed of in accordance with Subsection 201.09. All manhole castings shall be delivered to the Owner, as directed.
Asbestos cement pipe, if encountered and removed, shall be removed and disposed of in accordance with Section 202.03.09.02, as well as all applicable federal, state, and local requirements, including, but not limited to, current USEPA regulations (NESHAP, 40 CFR 61 Subpart M); OSHA regulations (29 CFR 192658);, the current New Jersey asbestos hazard abatement subcode (N.J.A.C. 5:23-8); the current NJDEP regulations (N.J.A.C.
7:26-1 et. seq.); and notification regulations (N.J.A.C. 5:23-8.6, 40 CFR 61 Subpart M, and N.J.A.C. 7:26-2:12), as well as applicable health and safety monitoring requirements.
2-17
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
202.03.09.02 REMOVAL AND DISPOSAL OF ASBESTOS CEMENT PIPE
202.03.10 REMOVE AND REPLACE ROADWAY BASE
202.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Excavation shall not be measured for payment and shall be included in the various bid items in the proposal.
If the plans have been altered or when disagreement exists between the Contractor and the Engineer as to the accuracy of the plan quantities in any balance, or the entire project, either party shall have the right to request and cause the quantities involved to be measured as specified hereinafter.
The average end areas method will be used for computing the volume of earthwork except where it is impractical to measure material by the cross sectional method due to the erratic type or location of the work. In the event of such situation, the excavation may be measured by acceptable method involving three-dimensional measurements.
Computations for excavation in intersection areas and abandoned drainage systems will not be done by the average end areas method, but rather by a suitable method selected by the Engineer to provide an accurate quantity.
Separate measurement and payment will not be made for sawcutting of any kind. The cost for this work shall be included in the unit price bid for each item requiring same.
Unstable material disclosed in an embankment which was not constructed properly, in the Engineer's opinion, shall be removed and replaced at no additional cost to the owner.
No separate payment will be made for the following but cost thereof shall be included in the respective unit prices submitted for the various items listed in the Proposal:
1. All excess and unsuitable excavation for which no use is shown on the plans or prescribed in the specifications shall be disposed of by the Contractor at sites to be provided by the Contractor outside the contract limits of the project.
2. Providing sheeting, shoring, bracing which would be pulled away or left in place as per direction of the Engineer.
3. Dewatering, if necessary, of whatever means.
No separate payment will be made for excavation required to provide bedding for all subsurface structures but the cost thereof shall be included in the respective unit prices submitted for the various items of subsurface structures listed in the Proposal.
No separate payment will be made for Pipe Bedding; rather the cost thereof shall be included in the unit prices of the various pipes in the proposal.
2-18
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 301 - SUBBASE
301.01 DESCRIPTION
301.02 MATERIALS
The following is added:
Subbase shall be constructed using existing insitu granular soils or furnished and installed 2" to 2-1/2" clean stone, or aggregate, NJDOT type 57 if and where directed by the engineer.
Soil support fabric, or geotextile, if and where ordered, shall conform to Subsection 919.01.
301.03 CONSTRUCTION
301.03.01 SUBBASE
A. Preparing Subgrade
Where directed by the Engineer, the contractor shall install a geotextile soil support fabric prior to the placing of the proposed dense graded aggregate base course and/or clean stone subbase. The subgrade shall be cleared of all large stones and sharp objects that could puncture the fabric prior to placement. The fabric should then be rolled out into the sub-grade by at least two men, beginning on the firmest soil of the site perimeter to establish an anchor point. Lateral and longitudinal seams should be overlapped 3' or more or sewn. Aggregate may be used to hold down the fabric until the sub-base can be placed. Ground securing pins may also be used on the overlap sections.
Once the fabric is in place, the aggregate subbase can be backdumped onto the fabric beginning on firm soil at a point just in front of the fabric. The aggregate should be spread in lifts to allow proper compaction while not overstressing the fabric. Where extremely soft subgrades exist, care should be taken during aggregate placement to insure that the fabric is not moved out of position. Deformations or ruts that appear in the subbase shall be filled with additional aggregate until stabile. Areas of the fabric which are damaged or moved out of position during aggregate placement shall be exposed and covered with a fabric "patch" overlapping 3 to 4 feet onto unaffected areas.
B. Spreading and Grading
C. Compacting
301.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Delete the entire text of this Article and substitute the following:
Separate measurement and payment will not be made for subbase constructed of insitu soils or insitu aggregates.
Separate payment will not be made for overlap or patch areas of soil support fabric.
Payment for the excavation required to install subbase materials shall be made based on the various unit price bid items as listed in the bid form.
2-19
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
SECTION 302 - AGGREGATE BASE COURSE
302.01 DESCRIPTION
The following is added to this Article of the Standard Specifications:
The contractor is herein advised that the use of imported recycled material as an alternate to dense graded aggregate is subject to the submission of gradation test results and priority pollutant plus forty test results indicating the material is acceptable for the intended use in accordance with NJDEP criteria and requirements.
One set of test results per source shall be provided for every 1000 cubic yards of imported material provided that a minimum of one set of results is submitted per street. Further, any recycled material to be utilized must come from a State licensed recycling facility.
302.02 MATERIALS
302.03 CONSTRUCTION
302.03.01 Aggregate Base Course
A. Preparing Subgrade or Subbase B. Density Control Strip C. Aggregate Base Course Placement D. Thickness Requirements
This Article of the Standard Specifications is amended as follows:
Delete the first paragraph of this article and substitute the following:
The thickness will be measured at a frequency not exceeding 100 feet or as established by means of test holes or other methods. Test holes shall be refilled with the base course material and the material compacted in layers not more than 6 inches thick with a flat-face mechanical tamper.
E. Compaction Acceptance Testing
The following subheading is added to these specifications:
F. Waiving Standard Compaction Requirements
When the Special Provisions waive the requirements of Subheadings B and E above and no alternative method is specified, the base course shall be placed and compacted according to subsection 203.03.02.
The compaction requirements in subheadings B and E are waived.
The following subheading is added to these specifications:
G. Maintenance Under Traffic Control
Traffic shall not be permitted to ride on the compacted base course.
302.04 MEASUREMENT AND PAYMENT
This article of the standard specifications is amended as follows:
Delete the entire text of this Article and substitute the following:
Payment for the excavation, as well as installing aggregate base course shall be made based on the various unit price bid items as listed in the bid form.
SECTION 601 – PIPE
601.1 MATERIALS
This Article of the Standard Specifications is amended as follows:
2-20
H:\Legacy\Howell-FS1\SEC\Pennsauken Township\Project Files\PK00501.C01 - Municipal Pool Improvements\Specifications\13 - Div 2.doc
Add the following to this article:
Dense Graded Aggregate 901.3 Geotextiles 919.7
601.2 CONSTRUCTION
The following is added to this Article:
Trench openings shall not remain open overnight under any circumstances: Backfill in roadways shall be made with dense graded aggregate. Backfill in other areas shall be with suitable previously excavated materials unless otherwise shown on the plans.
The contractor shall maintain areas where storm drains are installed in good serviceable condition, and all abrupt depressions shall be immediately repaired to the satisfaction of the Engineer.
The contractor shall construct any necessary ditches or trenches to keep the site and the work sufficiently drained at all times during progress of the work.
Subbase outlet drains and pipe bedding drains will be installed where indicated on the plans, or where directed by the Engineer, and…