This is a price sheet for a re-bid asbestos sampling and consulting services contract issued by Bergen County, New Jersey, in cooperation with the New Jersey Cooperative Purchasing Alliance for members #CK04 and #11BECCP. The contract establishes catalog pricing for a comprehensive range of asbestos consulting and laboratory analysis services to be provided over a 12-month period commencing on the date of award. The scope of work encompasses fourteen major service categories, including abatement technical specification design for both subchapter 8 and non-subchapter 8 projects, DCA variances, bulk sample analysis via multiple methodologies, air sample analysis, PCB content analysis, on-site microscopist services, project supervision and monitoring by asbestos safety technicians, USEPA certified AHERA building inspector services for sample collection, project management and supervision, and final report preparation.
The price sheet requires vendors to submit unit costs for each service line item, with many services offering multiple turnaround time options ranging from 6 hours to 72 hours, as well as differentiated pricing for normal working hours, evening hours, and weekend hours where applicable. The contract structure allows the County of Bergen and cooperative alliance members to utilize established catalog pricing throughout the contract term, with extension of pricing available beyond the initial 12-month period. Vendors must provide their name, signature, and date on the submission, and all services are to be delivered in compliance with applicable regulations and standards for asbestos consulting and analysis in New Jersey.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BC-BID-26-23.2 RE-BID - ASBESTOS - SAMPLING AND CONSULTING SERVICES | ||
| VENDOR NAME: | ||
| VENDOR SIGNATURE | ||
| DATE: | ||
| 12-Month Contract Period | ||
| Item | Description | Cost/Unit |
| 1.0 | Abatement Technical Specification Design (subchapter 8)Including DCA fees, permit fees, C/O as necessary | |
| 2.0 | DCA Variance (if required) | |
| 3.0 | Abatement Technical Specification Design (non-subchapter 8) | |
| 4.0 | Bulk Sample Analysis via Polarized Light Microscopy (PLM) | |
| 4.1 | 72 Hour Turn Around Time | |
| 4.2 | 48 Hour Turn Around Time | |
| 4.3 | 24 Hour Turn Around Time | |
| 4.4 | 6 Hour Turn Around Time | |
| 5.0 | Bulk Sample Analysis of Non-friable Organically Bound samples via Polarized Light Microscopy (PLM-NOB) | |
| 5.1 | 72 Hour Turn Around Time | |
| 5.2 | 48 Hour Turn Around Time | |
| 5.3 | 24 Hour Turn Around Time | |
| 5.4 | 6 Hour Turn Around Time | |
| 6.0 | Sample Analysis via Phase Contrast Microscopy (PCM) | |
| 6.1 | 72 Hour Turn Around Time | |
| 6.2 | 48 Hour Turn Around Time | |
| 6.3 | 24 Hour Turn Around Time | |
| 6.4 | 6 Hour Turn Around Time | |
| 7.0 | Air Sample Analysis via Transmission Electron Microscopy (TEM) | |
| 7.1 | 72 Hour Turn Around Time | |
| 7.2 | 48 Hour Turn Around Time | |
| 7.3 | 24 Hour Turn Around Time | |
| 7.4 | 6 Hour Turn Around Time | |
| 8.0 | Bulk Sample Analysis via Transmission Electron Microscopy (TEM) | |
| 8.1 | 72 Hour Turn Around Time | |
| 8.2 | 48 Hour Turn Around Time | |
| 8.3 | 24 Hour Turn Around Time | |
| 8.4 | 6 Hour Turn Around Time | |
| 9.0 | Bulk Sample Analysis for PCB contect | |
| 9.1 | 10 Day Turn Around Time | |
| 9.2 | 5 Day Turn Around Time | |
| 10.0 | Services of On Site AIHA/AAR registered Phase Contrast Microscopist | |
| 11.0 | Project Supervision/Monitoring Services by Asbestos Safety Technician | |
| 11.1 | Normal Working Hours | |
| 11.2 | Evening Hours | |
| 11.3 | Weekend Hours | |
| 12.0 | Services of USEPA certified AHERA Building Inspector for bulk sample collection | |
| 12.1 | Normal Working Hours | |
| 12.2 | Evening Hours | |
| 12.3 | Weekend Hours | |
| 13.0 | Project Manager/Supervisor | |
| 13.1 | Normal Working Hours | |
| 13.2 | Evening Hours | |
| 13.3 | Weekend Hours | |
| 14.0 | Final Report Preparation |