This document outlines specifications for the rehabilitation of the ARS Woodward Embankment Dam in Woodward County, Oklahoma. The project involves boring and jacking a new 30-inch principal spillway pipe through the existing dam, building a new principal spillway tower, constructing a roller compacted concrete auxiliary spillway over the top of the existing dam, disposing of and filling in the existing concrete auxiliary spillway, and clearing and grubbing trees and vegetation from designated areas.
The specifications define six bid items for the work, including mobilization, de-mobilization, and construction of a temporary access road. Mobilization will also involve providing electrical and internet services to the government's field office throughout the contract period. A subsidiary item requires the contractor to furnish and install a solar-powered webcam, along with hosting services, to allow remote monitoring of construction progress. The contractor must remove all site staging areas and restore pre-existing conditions after completing the work.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NRCS – 11/14 8-3
OK – ARS WOODWARD
4. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item 6, Mobilization
This item consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under this contract.
This item also consists of constructing/maintaining the ingress-egress road throughout the duration of the project. The ingress/egress road is for temporary construction access only. Upon completion of the project it is to be returned to pre-existing conditions.
The road shall not extend beyond 30 ft. wide, without approval by the Contracting Officer (CO). Pre-existing conditions of all haul routes shall be photographed and documented prior to use by the Contractor. This documentation shall be submitted to the CO prior to initiating any site work.
Contractor shall provide traffic control measures along highway regarding traffic entering and exiting the highway.
The contractor must unplug and maintain the principal spillway conduit at the beginning of construction and maintain it open until the new principal spillway is complete.
This item shall include all traffic signs, warning devices, and any other material used for traffic control along the highway.
All necessary traffic control shall be in conformance with the Manual on Uniform Traffic Control Devices (MUTCD) and the current Oklahoma Department of Transportation Standards and Specifications.
This item shall further consist of furnishing and installing electrical service and internet service to the Governments field office (travel trailer).
(1) The electrical service shall be 110 and 220 volt, minimum (7200 watts) alternating current with an adequate grounding system. A generator is not allowed.
(2) The Contractor shall be responsible for supply of power to the Governments field office throughout the contract period.
(3) The internet service must have unlimited data and be the fastest speed that is commercially available in the area. The service may be provided by an internet service provider or a cellular telephone company through a “hotspot” that is available at all times during the performance period.
(4) The contractor shall remove all developed site staging area items after the site work is completed.
NRCS – 11/14 8-4
Items of work subsidiary to this bid item are:
(a) Web Cam System and Services- Construction Specification 8.
b. Subsidiary Item, Web Cam System and Services
Provide a web cam system and attendant services, consisting of one (1) camera for the purpose of monitoring construction progress. Provide web hosting services, including but not limited to image storage, image transmission, web site maintenance and virus protection. Provide all necessary equipment for camera mounting, maintenance, power supply, and associated power regulators.
Provide a web camera that meets or exceeds the following:
(1) Sensor: 35.9x24 mm, 12 million effective pixels
(2) Image Size: 6016 x 4016
(3) Lens: 28-140mm (equivalent), 5x optical zoom, F-Stop 3.0 (f/3.0) with auto settings for different outdoor lighting conditions.
(4) Solar powered.
Include optical image stabilizer and 65 degree wide angle view of project site.
Camera must have environmental camera housing, allowing the camera to operate outside in a still position for the life of the construction contract free from contaminants.
The Contracting Officer will select the mounting location for the camera.
The camera must take a photo of the designated area every fifteen (15) minutes while construction activities are in progress.
The camera may be required to be moved to a different location during different phases of construction as directed by Contracting Officer.
All images will be posted to a web site constructed by the Contractor.
Submit monthly downloads of all images to the Engineer via DVD disc(s) and provide a final set of all images taken during the contract at the end of the contract via DVD discs. All images must be in *.jpg format and sorted by camera location and date/time the image was taken. All images must be stamped with date the photo was taken.
The contractor is responsible for all operation and maintenance of the camera and for damage, theft, or vandalism. Any interruption in service will be addressed in a timely manner commensurate with the type of work ongoing at that time.
NRCS – 11/14 8-5
No separate payment will be made for web cam system or services. Compensation for the web cam system and services will be included in the payment for Bid Item 6, Mobilization.