S01 Amendment 003 - Clarification Corrections Revised and additional documents.pdf
PDF 110 KB Posted
- Attached to
- BARATARIA BASIN LANDBRIDGE CONSTRUCTION PROJECT - BA-27 Repair - LAFOURCHE AND JEFFERSON PARISHES, LOUISIANA
- Solicitation number
- 12FPC321B0006
About this file
This document provides an amendment to an invitation for bids for construction services. The amendment includes additional documents to support bids for the Barataria Basin Landbridge Construction Project in Lafourche and Jefferson Parishes, Louisiana being conducted by the Department of Agriculture Under Secretary for Farm Production and Conservation. Construction includes repair of the BA-27 section of the landbridge. The amendment provides sign-in sheets from the site visit, questions and answers, revised bid schedules and construction specifications, revised plans and drawings, as-built drawings, notes on geotechnical reports, and additional geotechnical reports. Revisions include adding new construction specifications, revising material quantity estimates and specifications, modifying alignment details on plan sheets, and updating notes related to maximum placement elevations for lightweight aggregate and articulating concrete block mat thickness. Bids for the construction services are due by April 30, 2021 and performance is required within 124 days of notice to proceed. The acquisition is set aside for small businesses.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12FPC321B0006
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
SYRACUSE NY 13202
NRCS-NY-122C31
SUITE 354, ROOM 520
441 S. SALINA STREET
FPAC BUS CNTR- ACQ DIV-SECTION 3
USDA-NRCS NEW YORK STATE OFFICE
FPAC-HQ-12FPC3
WASHINGTON DC 20250
1400 INDEPENDENCE AVE SW, RM 6801-S
FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE
05/07/20210003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/22/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Barataria Basin Landbridge Project - BA-27 Repair - LaFourche and Jefferson Parishes, LA
This amendment serves to provide the following documents:
1. Sign in Sheet from Site Showing
2. Questions and Responses
3. Revised Bid Schedule
4. Revised Construction Specifications package
5. Revised set of Plans/Drawings
6. As-Built Drawings - for CU2, CU7, and CU8
7. Notes to Contractors Regarding Geotechnical Reports
8. Geotechnical Reports 1-4
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
BRIAN T. DWYER
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC321B0006/0003
9. List of Points Staked at Site
10. Consolidated Test Data
11. Test Data Summaries
CHANGES TO CONSTRUCTION SPECIFICATIONS:
Construction Specification 13 - Pilings is added.
Construction Specification 25 - Rockfill
- Section 10 A(1)iii. Changes the maximum elevation above which Lightweight Aggregate (LWA) bags cannot be placed from 2.5ft to +2.7'.
- Section 10 A(1)iv. Changes the word "is" to
"are" and changes text "+2.5' " to "+2.7' "
- Section 10 A(2)i. Removes the "Angle of
Internal Friction" section in the table.
- Section 10 A(2)i. Removes the "Direct Shear" testing note thereby eliminating the associated testing requirement.
- Section 10 A(2)i. Adds note allowing the use of an alternate LWA gradation.
Construction Specification 65 - Articulating
Concrete Block (ACB) Revetment System.
- Section 7A (2)i. Removes the word "nominal" pertaining to the ACB mat thickness.
- Section 7A (2)x. Removes the wording "...be tied in such a way shall.."
- No drawings will be modified as a result of the changes described above for Construction
Specification 65 - Articulating Concrete Block
(ACB) Revetment System.
Construction Specification 93 - Identification
Markers or Plaques
- Section 6A (2)i, Buoy Lights. Changes the word
"yellow" to "white" as it pertains to buoy light color.
Construction Specification 95 - Geotextile
- Section 7A (1), General. Added note clarifying surface preparation requirement.
Material Specification 512 - Wood Piles is added.
Material Specification 583 - Coal Tar-Epoxy Paint is added.
Material Specification 585 - Wood Preservatives and Treatment is added.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12FPC321B0006/0003
CHANGES TO DRAWINGS:
Sheet 10 - The plan view has changed due to a minor change in revetment centerline alignment for CU#2 from station 31+50 to station 32+00.
This has in turn changed the coordinate values for the revetment centerline, the access channel centerline, as well as the access channel PIs.
Sheet 10 is replaced with Sheet 10A3.
Sheet 11 - The revetment centerline profile has changed due to the change in the revetment centerline alignment for CU#2 from station 31+50 to station 32+00. Sheet 11 is replace with Sheet 11A3.
Sheet 14 - The cross section has changed due to the change in the revetment centerline alignment for CU#2 from station 31+50 to station 32+00.
Sheet 14 is replaced with Sheet 14A3.
Sheet 15 - Notes 4 and 5 has changed to reflect the revised maximum elevation (+2.7') above which no LWA bags can be placed. Notes 7 and 8 were added to the notes section. The word ¿nominal¿ was removed as it pertains to the thickness of the ACB mats. Sheet 15 is replaced with Sheet 15A3.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .