This is an invitation for bids for construction services. The contractor shall furnish all labor, materials, equipment, and supervision necessary to construct construction measures as described in the attached specifications and drawings for the BARATARIA BASIN LANDBRIDGE CONSTRUCTION PROJECT - BA-27 Repair in Lafourche and Jefferson Parishes, Louisiana. The acquisition is a total small business set-aside. Bids are due by April 30, 2021 at 12:00 PM Central time and will be opened via teleconference. An organized site visit has been scheduled for April 13, 2021 at 9:30 AM Central time at the Clovelly Boat Launch. Prospective bidders must RSVP at least two days in advance and bring their own boat transportation. The performance period is 124 days after notice to proceed. Davis Bacon wage rates apply. The estimated value of construction is between $1,000,000 and $5,000,000.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
+BARA T ARIA BASIN LAND BRIDGE REP AIR (BA-27)
CONSTRUCTION UNITS NO. 2 & 7
CONSTRUCTION SPECIFICATIONS
Specification Number Title Pages SP Special Provisions SP-1 to SP-9 5 Pollution Control 5-1 to 5-9 7 Construction Surveys 7-1 to 7-10 8 Mobilization & 8-1 to 8-2
Demobilization 21 Excavation 21-1 to 21-6 25 Rockfill 25-1 to 25-6 65 Articulating Concrete Block 65-1 to 65-5
Mats
93 Identification Markers & 93-1 to 93-2 Plaques
94 Contractor Quality Control 94-1 to 94-10 95 Geotextile 95-1 to 95-6
SWPPP Draft Storm Water Pollution SWPPP-1 to SWPPP-9 Prevention Plan
NOi Notice of Intent CSW-G-1 to CSW-G-17 NOT Notice of Termination CSW-T-1
Material Specifications
S ecification Number Title Pa es 592 Geotextile 592-1 to 592-3
NRCS -January 2021 LA - Barataria Basin Landbridge Repair (BA-27) CU 2 & 7
NRCS – January 2021
LA – Barataria Basin Landbridge Repair CU 2&7 SP-1
SPECIAL PROVISIONS
1) Additional insured parties
The Contractor shall include the following landowners as additional insured parties on any and all pertinent liability insurance policies maintained by the Contractor during the construction of the project. Such insurance policies shall include completed operations coverage and shall provide that those parties will be protected from and defended and insured against, without costs or expense to those parties, any liability or loss (including loss of life), or damage to property of any kind, arising wholly or in part from or in connection with operations on their properties.
A copy of all certificates of insurance listing the additional insured parties shall be provided to the (CO) at least 10 calendar days prior to the preconstruction meeting.
• State of Louisiana
• Martin J. McAndrews, Jr.
• Louisiana Delta Farms, LLC
• Delta Farms Oil Company, LLC
• Rigolets Limited Partnership
• Goyamo Oil Company, LLC
• Monticeto Oil Company, LLC
• IP Farms, Inc.
2) Notification Prior to Property Access
The Contractor shall provide written notification to the Contracting Officer (CO), Contracting
Officer’s Representative (COR), and Project Manager (PM) at least 7 days prior to their initial access to the property. The notice shall indicate the planned date of initial access. Contact information for the Project Manager will be provided to the Contractor during the
Preconstruction Conference.
3) Access By Landowners, Lessees, and Others
The Contractor is made aware that occasional access by landowners, lessees and oilfield and utility company employees throughout the work area may be required. The Contractor shall provide for such passage in a reasonably adequate and satisfactory manner, as determined by the
CO, on such occasions.
Work under this contract is permitted under two separate Department of the Army permits (COE permit) No. MVN-2004-0467-CQ and No. MVN-2000-01595-EJJ. A Copy of Page 1 of the permit must be conspicuously displayed at the project site. Also, a copy of the signed permit
LA – Barataria Basin Landbridge Repair CU 2&7 SP-2 must be kept at the project site until the work is completed. The Contractor shall also post in an area visible by all employees:
• Equal Opportunity is the Law poster,
• Notice to All Employees poster,
• Approved SWPPP and Notice of Intent,
• Davis Bacon Wage Rates,
• Emergency Contacts,
• Hurricane Evacuation Plan,
• LA One Call tickets
4) Horizontal and Vertical Datums
All elevations stated in the plans and specifications refer to North American Vertical Datum
(NAVD88), Geoid 99. All horizontal datum references in the plans and specifications refer to
State Plane Louisiana South 1702 NAD 83 feet.
5) Protection of pipelines and underground utilities
The Contractor shall notify Louisiana One Call (LA ONE CALL) at 1-800-272-3020 72 hours prior to digging, placing Light Weight Aggregate bags and Articulating Concrete Block mats, or driving piling in order to locate utility lines. The LA One Call ticket shall be renewed every 20 calendar days or as required by law. The Contractor shall provide all LA One Call ticket numbers to the COR.
Additional Contractor responsibilities and restrictions near pipelines and other utilities and structures shall be as noted in the following:
a. Barges or other watercraft shall not anchor, spud, or dredge near any pipeline within 50 feet of any pipeline, without specific prior written approval from the pipeline company. All vessels shall be floating when crossing any pipeline. Spuds shall be welded or pinned up while traveling near and/or crossing any pipeline.
b. No heavy construction equipment will operate (place an operating load) within 50 feet of any pipeline without specific prior approval from the designated pipeline company. When necessary, timber mats shall be used when crossing a pipeline, as required and approved by the designated pipeline company. Written approval and requirements from the pipeline companies shall be provided to the CO at least 48 hours prior to operating equipment near any pipeline.
LA – Barataria Basin Landbridge Repair CU 2&7 SP-3
c. The Contractor shall cross pipelines only at the locations and in the manner designated and approved by the pipeline company. The approved method shall not remove the soil cover over the pipeline. Pipeline companies may require the Contractor to cross their pipelines at high tide and during daylight hours only. These requirements shall be determined by the agreement the Contractor has with each specific pipeline company for crossing each pipeline.
d. The Contractor shall schedule a pre-work meeting and establish lines of communication with the associated pipeline company to discuss all aspects of the planned activities, pipeline marking schedule, pipeline crossing locations, excavations within 100 feet of any pipeline.
e. Any pipeline markers damaged or removed by the Contractor shall be replaced within 24 hours of such damage or removal.
f. All equipment crossings of the pipeline shall be marked or flagged.
g. The Contractor shall be liable for any expense, loss or damage to any pipeline due to the presence of his/her equipment/operations in the vicinity of the pipeline, including but not limited to coating repair, pipe replacement, operational downtime or gas loss that the pipeline company may sustain resulting from the operations or activities of the Contractor, its agents or employees during construction for any project feature.
h. If the Contractor’s facilities or related equipment are damaged or destroyed or if said operations and equipment must be relocated or removed due to any emergency, operational or maintenance requirements arising out of the day to day business activities of any pipeline company, the pipeline company shall not be liable to the Contractor or to any other person or entity for any damages whatsoever, including, but not limited to, damages of any type arising from the loss of product, loss of profit, interruption of business activity or business loss of any kind. Additionally, any subsequent repair and/or reinstallation of said facilities shall be at the sole (100%) cost of the Contractor.
i. No excavation will be allowed within 50 feet of any pipeline. No activities that will result in the reduction of the existing cover over any pipeline will be permitted.
j. The Contractor shall be in constant consultation with the pipeline representative and the COR during construction activities within 100 feet of any pipeline. The Contractor shall provide written documentation to the CO if a pipeline company chooses not to have a representative on site during construction activities in the vicinity of their pipeline.
6) Known Pipelines
Known utilities are shown in the construction drawings. It is possible that some pipelines and/or utilities exist that have not been shown. The Contractor shall perform a magnetometer survey to locate pipelines within 150 feet of the proposed access channels. Pipelines located within 150 feet of the access channels shall be marked in the field prior to construction and shall remain marked throughout construction. The Contractor shall be on the alert for such pipelines and utilities and shall report them immediately to the Contracting Officer (CO).
LA – Barataria Basin Landbridge Repair CU 2&7 SP-4
• All pipelines that are shown in the drawing should not interfere with the Contractor’s construction methods. If the Contractor believes that a pipeline will interfere with their construction methods, then they should contact the COR immediately.
7) Marine environment advisory
The Contractor is advised that the project lies within a dynamic marine environment subject to significant changes in environmental conditions and that water surface elevations in this area can vary due to weather, daily tides, and operation of the local water control structures.
Historical data can be obtained from the U.S. Army Corps of Engineers, the U.S. Geological
Survey, the State of Louisiana's Coastal Protection and Restoration Authority (CPRA), or the
National Oceanic and Atmospheric Administration (NOAA).
The Contractor is responsible for taking the appropriate measures to ensure that water level fluctuations, rainfall events, and soil conditions do not interfere with access to and from the construction site or with completion of the construction activities.
8) Notification of Coast Guard
The Contractor shall notify the Eighth Coast Guard District so that a Local Notice to Mariners may be prepared, as required. Notification, with a copy of the COE permit approval and drawings, should be mailed to the following address:
CDR 8th Coast Guard District (dpw)
Hale Boggs Federal Bldg.
500 Poydras St. Suite 1230
New Orleans, LA 70130-3396
A copy of the notification shall be provided to the Contracting Officer (CO) prior to the NTP being issued. The Contractor shall also provide the posted Local Notice to Mariners to the CO indicating that the project information has been included.
E-mail notification must also be provided to the Eighth Coast Guard District, Aids to Navigation
Branch, Marine Information Office 7 to 10 days prior to excavation or construction operations.
The Marine Information Office may be reached by e-mail at d8marineinfo@d8.uscg.mil
Telephone inquiries can be directed to 504-671-2327. A copy of the e-mail notification shall be provided to the CO prior to construction.
Any updates or revisions to the above items shall be provided to the CO and COR immediately.
9) Contractor’s navigation requirements
The Contractor’s navigation requirements include, but are not limited to, the following:
a. Inland Navigation Rules
LA – Barataria Basin Landbridge Repair CU 2&7 SP-5
All marine vessels shall follow the Inland Navigation Rules which are contained in the following Federal Laws or Regulation: International Navigational Rules Act of 1977 (Public
Law 95-75, 91 Stat. 308, or 33 U.S.C. 1601-1608), and the Inland Navigation Rules Act of
1980 (Public Law 96-591, 94 Stat. 3415, 33 U.S.C. 2001-2038). These rules can be found on the Internet at http://www.navcen.uscg.gov/mwv/navrules/rotr_online.htm. All marine vessels shall display the lights and day shapes required by Part C – Lights and Shapes of the
Inland Navigation Rules. The location, type, color, and size of the lights and day shape shall be in accordance with Annex I – Positioning and Technical Details of Lights and Shapes.
Any vessel engaged in excavation is considered a “Vessel restricted in her ability to maneuver” and shall display all the lights and shapes required in Rule 27: Vessel Not Under
Control.
b. Obstruction to navigation
The Contractor shall operate in compliance with pertinent U.S. Coast Guard regulations and shall conduct work in such a manner as to minimize any obstruction to navigation. If the
Contractor’s excavation equipment or any other floating equipment obstructs any navigation, making navigation difficult or endangering the passage of vessels, said equipment shall be promptly moved on the approach of any vessel to the extent necessary to afford a practical passage. Upon completion of work, the Contractor shall promptly remove the excavation equipment and other floating equipment, as well as ranges, LWs, piles and any other marks or objects that are not permanent project features placed in the navigable water or on shore.
The Contractor shall be responsible for keeping all waterways clear of any floating debris
(woody or other) that may cause a hazard to navigation. Any floating debris shall be collected immediately and disposed of off-site in accordance with all local, state, and federal regulations.
c. USCG inspection and certification
All vessels that are regulated by the United States Coast Guard (USCG) shall have current inspection and certifications issued by the USCG before commencing construction. A copy of the certification shall be posted in a public area on board the vessel.
d. Other vessel inspection and certification
All vessels not subject to USCG inspection and certification or not having a current
American Bureau of Shipping (ABS) Classification shall be inspected in working mode annually by a marine surveyor accredited by the National Association of Marine Surveyors
(NAMS) or the Society of Accredited Marine Surveyors (SAMS). The surveyor must have at least five years of experience in commercial marine vessels and equipment. The Contractor shall submit the marine surveyor’s qualifications to NRCS, which shall include type of certification e.g. Hull and Machinery, Commercial Workboat etc., number of years of as a
Certified Marine Surveyor and other type of surveys conducted by the marine surveyor e.g.
Marine Facilities, Commercial Vessel under 1600GT. The CO may disapprove the marine survey if the qualifications are not appropriate for the intended use of the vessel. All other vessels shall be inspected before being placed in use and at least annually by a qualified http://www.navcen.uscg.gov/mwv/navrules/rotr_online.htm
LA – Barataria Basin Landbridge Repair CU 2&7 SP-6 person. The inspection shall be appropriate for the intended use of the vessel. The inspection, as a minimum, shall evaluate the structural integrity of the vessel and compliance with the
National Fire Protection Association code 302 – Pleasure and Commercial Motor Craft. The inspection shall be documented. A copy of the most recent inspection documentation shall be posted in a public area on board the vessel. A copy of the inspection documentation shall be furnished to the COR prior to the vessel being used onsite.
In addition to the above, NRCS will perform a Safety Inspection of all vessels and equipment prior to being used on the jobsite and periodically throughout the performance of work. The
Contractor shall five a minimum of 48-hour notice when a piece of equipment needs to be inspected by NRCS.
e. License requirement
Officers and crew shall be in possession of a current valid USCG license or a correctly endorsed document as required by the USCG, which shall be posted in a public area on board the vessel. A copy of the documentation for all officers and crew shall be submitted to the
COR prior to their arrival at the site.
10) Work limits
The Contractor’s movement in the project area shall be limited to the work limits, and access channels stated in the specifications and as shown on the drawings. The Contractor shall provide documentation to NRCS of any alternative access routes 48 hours prior to the use of the alternative access routes.
11) Limitation of equipment use
Airboats and small outboards shall be used whenever practical to reduce the usage of marsh buggies. Established trails and access canals shall be utilized whenever possible. Marsh buggy use shall be limited to the limits of the project features. If the Contractor chooses to use airboats, written permission from the respective landowner shall be obtained by the Contractor and a copy shall be provided to the CO.
12) Restoration of Site and Repair of Damages
In the event of surface alterations resulting from activities of the Contractor, beyond those alterations absolutely necessary for accessing the sites and conducting project activities, the
Contractor is responsible for restoring the site, to the greatest extent practical, to conditions existing at commencement of Contractor activities. Contractor shall repair or replace, in like manner, any fences, roads, bridges, launches, trails, waterways, and other facilities which may be damaged or destroyed during the construction of the structures and/or appurtenances installed as part of the project. The contractor shall take caution as to not damage the existing Permanent
Warning signs or timber piles. If the Contractor should damage or remove and lose the permanent warning signs and/or timber piles, then the contractor shall replace at no cost to the
Government and meet the requirements as shown in the drawings. The Contractor shall be responsible for removal and disposal of all litter, debris, and survey stakes/poles associated with construction of the project from the project sites upon completion of authorized work.
LA – Barataria Basin Landbridge Repair CU 2&7 SP-7
Construction materials and all temporary measures installed by the Contractor shall be removed by Contractor as concurred in by the COR. If the Contractor is unable to fulfill these responsibilities, the Contractor or its insurance carrier will be responsible for the cost of such repairs and restoration.
13) Removal of equipment
All tools, equipment, and other property (excluding project features) taken upon or placed upon the land or water bottoms by the Contractor shall remain the property of the Contractor. All such tools, equipment and other property shall be removed by the Contractor prior to the final payment being made.
14) Notice of conflict between Contractor and Subcontractor/supplier
The Contractor shall notify the Contracting Officer within seven (7) calendar days of occurrence of any written or oral notice of conflict between Contractor and any Subcontractor/supplier regarding non-payment for services or supplies. In the event that a lawsuit is filed, and the prime
Contractor is notified of such lawsuit while the contract is active, the Contractor shall notify the
Contracting Officer within seven (7) calendar days of receipt of such notice.
15) Contractor review of plans and specifications
The Contractor shall review the plans and specifications for accuracy and completeness. The
Contractor shall also make their own determination of the quantities of work required to complete the construction and make their own assessment of the site and work required prior to bidding. Any discrepancies, errors, or omissions shall be brought to the attention of the
Contracting Officer (CO) prior to the bid due date.
16) Cultural Resources
The Contractor shall be on the alert for cultural resource deposits. Resource materials with potential cultural significance consist of the remains of prehistoric (Native American) or historic maritime or terrestrial activity, or human remains. Typical examples of cultural resources found in coastal Louisiana include but are not limited to, material from historic shipwrecks, prehistoric
(aboriginal) dugouts, fire hearths, pottery, or human bones. If the Contractor discovers any cultural resource deposits, the Contractor shall cease all work within 100 feet of the site and immediately notify the CO and COR.
17) Disturbance of wildlife
Disturbing, injuring, collecting, or attempting to disturb, injure, or collect any flora, fauna, or other property is prohibited.
a. West Indian manatee Protection Measures
The endangered West Indian manatee (Trichechus manatus) is known to regularly occur in
Lakes Pontchartrain and Maurepas and their associated coastal waters and streams. It also can be found less regularly in other Louisiana coastal areas, most likely while the average
LA – Barataria Basin Landbridge Repair CU 2&7 SP-8 water temperature is warm. Based on data maintained by the Louisiana Natural Heritage
Program (LNHP), over 80 percent of reported manatee sightings (1999-2011) in Louisiana have occurred from the months of June through December. Manatee occurrences in
Louisiana appear to be increasing and they have been regularly reported in the Amite, Blind, Tchefuncte, and Tickfaw Rivers, and in canals within the adjacent coastal marshes of southeastern Louisiana. Manatees may also infrequently be observed in the Mississippi
River and coastal areas of southwestern Louisiana. Cold weather and outbreaks of red tide may adversely affect these animals. However, human activity is the primary cause for declines in species number due to collisions with boats and barges, entrapment in flood control structures, poaching, habitat loss, and pollution.
i. During in-water work in areas that potentially support manatees all personnel associated with the project should be instructed about the potential presence of manatees, manatee speed zones, and the need to avoid collisions with, or injury to, manatees. All personnel should be advised that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine
Mammal Protection Act of 1972 and the Endangered Species Act of 1973.
Additionally, personnel should be instructed not to attempt to feed or otherwise interact with the animal, although passively taking pictures or video would be acceptable.
ii. All onsite personnel are responsible for observing water-related activities for the presence of manatees. We recommend the following to minimize potential impacts to manatees in areas of their potential presence:
iii. All work, equipment, and vessel operation should cease if a manatee is spotted within a
50-foot radius (buffer zone) of the active work area. Once the manatee has left the buffer zone on its own accord (manatees must not be herded or harassed into leaving), or after 30 minutes have passed without additional sightings of manatees(s) in the buffer zone, in-water work can resume under careful observation for manatee(s).
iv. If a manatee(s) is sighted in or near the project area, all vessels associated with the project should operate at a “no wake/idle” speed within the construction area and at all times while in waters where the draft of the vessel provides less than a four-foot clearance from the bottom. Vessels should follow routes of deep water whenever possible.
v. If used, siltation or turbidity barriers should be properly secured, made of material in which manatees cannot become entangled, and be monitored to avoid manatee entrapment or impeding their movement.
LA – Barataria Basin Landbridge Repair CU 2&7 SP-9
vi. Temporary signs concerning manatees should be posted prior to and during all in-water project activities and removed upon completion. Each vessel involved in construction activities should display at the vessel control station or in a prominent location, visible to all employees operating the vessel, a temporary sign at least 8 ½” X 11” reading language similar to the following: “CAUTION BOATERS: MANATEE AREA/ IDLE
SPEED IS REQUIRED IN CONSTRUCTION AREA AND WHERE THERE IS LESS
THAN FOUR FEET BOTTOM CLEARANCE WHEN MANATEE IS PRESENT”. A
second temporary sign measuring 8 ½” X 11” should be posted at a location prominently visible to all personnel engaged in water-related activities and should read language similar to the following: “CAUTION: MANATEE AREA/ EQUIPMENT
MUST BE SHUTDOWN IMMEDIATELY IF A MANATEE COMES WITHIN 50
FEET OF OPERATION”.
vii. Collisions with, injury to, or sighting of manatees should be immediately reported to the Service’s Louisiana Ecological Service Office (337.291.3100) and the Louisiana
Department of Wildlife and Fisheries, Natural Heritage Program (225.765.2821).
Please provide the nature of the call (i.e. report of an incident, manatee sighting, etc.);
time of incident/sighting; and the approximate location, including the latitude and longitude coordinates, if possible.
LA – Barataria Basin Landbridge Repair CU 2&7 5-1
Construction Specification 5—Pollution Control
1. Scope
The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
The following BioPreferred® product categories are applicable to this specification: — mulch and compost materials erosion control materials fertilizers dust suppressants agricultural spray adjuvants
2. Material
Silt fence shall conform to the requirement of Materials Specification 592, Geotextile. All other material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works
The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas from impacting properties and streams below the construction site(s). These basins are temporary
LA – Barataria Basin Landbridge Repair CU 2&7 5-2 and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile silt fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. Silt fences shall be installed and maintained in accordance with ASTM D6462. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
4. Chemical pollution
The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5. Air pollution
The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
LA – Barataria Basin Landbridge Repair CU 2&7 5-3
6. Maintenance, removal, and restoration
All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment
Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
8. Items of work and construction details
LA – Barataria Basin Landbridge Repair CU 2&7 5-4
8. Items of Work and Construction Details
The LDEQ Louisiana Pollution Discharge Elimination System (LPDES) dictates that construction sites greater than five acres in size require a general permit for storm water discharge (LAR100000). Part IV of LAR100000
(http://www.deq.louisiana.gov/portal/Portals/0/permits/lpdes/pdf/FINAL%20LAR100000.pd
f) requires a Storm Water Pollution Prevention Plan. Please note that the rules for the
LPDES process relative to construction sites are contained in the LAC Title 33:IX.2341.
Rules for storm water discharges associated with construction sites covered by general permits are found in LAC Title 33:IX.2345.
Items of work to be performed in conformance with this specification and the construction details therefore are:
A. Subsidiary Item, Pollution Control
1) General
i. This item shall consist of all work necessary to control erosion and sediment pollution, chemical pollution, water pollution, and air pollution during the period of this contract.
ii. The Contractor shall perform the work in a manner that will reduce erosion, minimize sediments and other pollutants to the water and streams, and create a minimum of air pollution.
iii. As a part of this requirement, a Storm Water Pollution Prevent Plan (SWPPP) shall be submitted to the Louisiana DEQ prior to the pre-construction meeting in accordance with General Permit No. LAR 100000, and a copy of the SWPPP shall be submitted to the CO at the same time.
iv. All paints and hazardous materials shall be kept in the original containers and tightly sealed with the manufacturer's label attached. These must be properly stored when not in use. They shall also be stored in a neat orderly manner in their original containers. Disposal of surplus materials shall be in accordance with the manufacturer's or State and Local regulations and recommended methods.
Containers shall be empty before disposal.
v. Petroleum products such as fuels and lubricants will be stored in tightly sealed containers that are clearly labeled. The storage and dispensing of all petroleum products will be in accordance with part 1926.152 of the OSHA Construction
Industry Safety and Health Standards. All spills will be cleaned up on the same workday of the spill occurrence or whenever discovered.
vi. Soils contaminated with petroleum products will be removed from the site and disposed of in accordance with State and Local regulations.
vii. The Contractor shall have an oil boom on site at all times sufficient in size to http://www.deq.louisiana.gov/portal/Portals/0/permits/lpdes/pdf/FINAL%20LAR100000.pdf http://www.deq.louisiana.gov/portal/Portals/0/permits/lpdes/pdf/FINAL%20LAR100000.pdf
LA – Barataria Basin Landbridge Repair CU 2&7 5-5 encompass the largest piece of equipment used in construction of the project. The boom shall be sufficient to contain any leaks or spills that may occur from the equipment. If a spill from fuel, oil, or lubricant occurs that enters a waterway, the
Contractor shall notify USGS.
viii. The Contractor shall also have spill cleanup kits to minimize contamination. The
Contractor shall anchor all temporary materials used for pollution control in such a manner to prevent its being transported off the worksite by storm runoff water.
Damage caused by clogging of downstream bridges and/or culverts by such temporary materials being transported downstream by storm water shall be the responsibility of the Contractor.
ix. All onsite vehicles and equipment shall be monitored for leaks and receive regular preventive maintenance to reduce the chance for leakage. Leaks shall be repaired as soon as they are identified.
x. Sumps used to control chemical pollution shall be sealed with plastic sheets having a minimum thickness of 20 mils.
xi. No pumping of bilge into waters of the state will be allowed on the project site.
xii. All materials including temporary measures and construction debris shall be removed and disposed of prior to project completion.
xiii. Contractors and subContractors shall prepare for and take all necessary precautions to prevent discharges of oil and releases of waste and hazardous materials. If a release occurs, notification and response shall be in accordance with all applicable regulations including LAC 33:I.39, General Permit LAR
100000 and 40 CFR Part 300, which includes notification of LDEQ and the US
Coast Guard, in the event of an unauthorized discharged that cause an emergency condition, the Contractor shall immediately contact the DPS 24-hour Louisiana
Emergency Hazardous Materials Hotline at 225-925-6595. The Contractor shall immediately notify NRCS of any occurrences and remedial action and provide copies of reports of the incident and resultant actions to the NRCS within 24 hours.
xiv. The Contractor shall make maximum use of biobased products that are United
States Department of Agriculture (USDA)-designated items. Information about this requirement and these products is available at http://www.biopreferred.gov.
2) SWPPP Requirements
i. General SWPPP Requirements
a. The contents of the SWPPP shall address all of the applicable items identified in Part IV of Permit No. LAR100000.
b. Attached is a draft copy of an SWPPP the Contractor may use to develop http://www.biopreferred.gov/
LA – Barataria Basin Landbridge Repair CU 2&7 5-6 the site-specific SWPPP for implementation on this contract.
ii. Scope
a. The purpose of the SWPPP is to control soil erosion and the resulting sediment from leaving the project work area and prevent pollution of any water body caused by the runoff from the area of construction activities under this contract, under the terms of Permit No LAR100000
b. The Contractor shall develop a site specific SWPPP that corresponds with the proposed construction activities by type and time of occurrence and implement the SWPPP in a manner which will meet the requirements
Permit No. LAR 100000.
The Contractor shall also assure that all subContractors have reviewed the plan and that they comply with its provisions. All subContractors must sign the SWPPP.
iii. Definitions
a. Government – The Natural Resources Conservation Services.
b. Construction Owner – The construction owner is the party that has operational control over plans and specifications including the ability to make changes to those items. The Natural Resources Conservation
Service is the construction owner.
c. Construction Operator – The construction operator is the party having day-to-day operational control over those activities at a project site that are necessary to ensure compliance with the SWPPP or other permit conditions. The Contractor is the construction operator.
d. Notice of Intent (NOI) – A document that is completed and submitted to the Louisiana Department of Environmental Quality (LDEQ) as application for coverage to discharge under the Permit No. LAR100000.
e. Notice of Termination (NOT) – A document that is completed and submitted to the Louisiana Department of Environmental Quality
(LDEQ) to terminate permission to discharge under the Permit No.
LAR100000. The NOT should be filed when the permittee is no longer the Construction Operator of the contract, or when termination of storm water discharge has been accomplished.
iv. Notice of Intent (NOI)
a. The Government will submit an NOI to the LDEQ as application for the
Government’s coverage under the terms of the Permit No. LAR100000.
LA – Barataria Basin Landbridge Repair CU 2&7 5-7
b. If a specific LPDES permit applicable to this construction has been received from the LDEQ in response to the NOI, a copy of the permit, as well as a copy of the Government’s NOI will be provided to the
Contractor at the Pre-Construction Conference.
c. The Contractor shall develop a site specific SWPPP, attach the
Construction Owner/Operator certification statement provided, and certify by signing the statement as the Construction Operator.
d. The Contractor shall submit a NOI to the LDEQ as application for his/her coverage under the terms of Permit No. LAR100000 prior to the initiation of any construction activities.
e. Certified mail is recommended for the Contractor’s proof of submittal.
f. A copy of the Contractor’s NOI submittal shall be provided to the
Contracting Officer at the time of submittal. LDEQ will provide a
LPDES permit to the Contractor in response to the NOI submitted. Then
NOI’s of the Contractor and the Government, as well as the specific permits in response to the NOI, shall be posted at the job site by the
Contractor.
v. Record Retention Requirements
a. Records of the NOT as well as any data used to complete it, the SWPPP, and any reports required by Permit No. LAR100000 shall be retained by the permittee for at least three years from the date that the site is finally stabilized.
b. Certification of the SWPPP by the Contractor or any sub-Contractor is required in accordance with Permit No. LAR10000.
vi. Plan Accessibility
a. The Contractor shall post a notice near the main entrance of the construction site with the following information:
1. The LDPES permit number (LAR100000) and effective date of this permit
2. The name and telephone number of a local contact person
3. A brief description of the project
4. The location of the SWPPP
LA – Barataria Basin Landbridge Repair CU 2&7 5-8
b. A copy of the SWPPP required by the permit, including a copy of the permit language shall be retained at the construction site from the date of construction initiation to the date of stabilization.
c. The permittee with day-to-day operational control over the SWPPP implementation shall have a copy of the plan available at a central location onsite for the use of operators and those identified as having responsibilities under the plan.
vii. LDEQ Correspondence
a. Any written correspondence concerning the NOI, NOT, SWPPP, or discharges covered under Permit No. LAR100000, shall be identified by permit number, if one has been assigned, and a copy provided to the
Contracting Officer. LDEQ mailing address is as follows:
Louisiana Department of Environmental Quality
Office of Environmental Services
P.O. Box 4313
Baton Rouge, LA 70821-4313
Attn: Permits Division
viii. Maintenance and Surveillance Fees
a. The Contractor, without additional expense to the Government, shall be responsible for paying any state required annual maintenance and surveillance fee for work associated with coverage under Permit No.
LAR100000.
ix. Control Measures
a. Control measures that will be implemented shall be in compliance with
Permit No. LAR100000 and identified in the SWPPP.
b. The control measures shall include erosion control measures for both short- and long-term erosion control measures (BMP’s) both vegetative and structural.
x. Maintenance and Inspection
a. The Contractor shall maintain the temporary and permanent vegetation, erosion and sediment control measures, and other protective measures in good and effective operating condition.
LA – Barataria Basin Landbridge Repair CU 2&7 5-9
b. The Contractor shall inspect disturbed areas of the construction site, areas used for storage of materials, stabilization practices, structural practices, and other controls at least once every fourteen (14) calendar days, before anticipated storm events expected to cause a significant amount of runoff, and within 24 hours of the end of any storm that produces 0.5 inches or more of precipitation.
c. A report of each inspection shall be made and included with the daily
QC report. Any items identified in the inspection requiring repairs or restoration shall be immediately corrected and actions taken reported in the daily QC report.
xi. Notice of Termination (NOT)
a. Upon stabilization and elimination of all storm water discharges authorized by Permit No. LAR100000, a Notice of Termination (NOT) shall be certified and submitted by the Contractor to the Permits
Division of LDEQ.
b. Certified mail is recommended as proof of the NOT submittal.
c. A copy of the Contractor’s NOT submittal shall be provided to the
Contracting Officer at the time of submittal, prior to final acceptance of the work.
3) Measurement and Payment
i. In Section 7, Measurement and Payment, no separate payment will be made for this item.
ii. Payment for this item will be included in Bid Item 6, Articulating Concrete Block
Mat.
LA – Barataria Basin Landbridge Repair CU 2&7 7-1
Construction Specification 7—Construction Surveys
1. Scope
The work consists of performing all surveys, measurements, and computations required by this specification.
2. Equipment and material
Equipment for construction surveys shall be of a quality and condition to provide the required accuracy. The equipment shall be maintained in good working order and in proper adjustment at all times. Records of repairs, calibration tests, accuracy checks, and adjustments shall be maintained and be available for inspection by the engineer. Equipment shall be checked, tested, and adjusted as necessary in conformance with manufacturer's recommendations.
Material is field notebooks, stakes, templates, platforms, equipment, spikes, steel pins, tools, and all other items necessary to perform the work specified.
3. Quality of work
All work shall follow recognized professional practice and the standards of the industry unless otherwise specified in section 9 of this specification. The work shall be performed to the accuracy and detail appropriate for the type of job. Notes, sketches, and other data shall be complete, recorded neatly, legible, reproducible and organized to facilitate ease in review and allow reproduction of copies for job documentation. Survey equipment that requires little or no manual recording of field data shall have survey information documented as outlined in section 9 of this specification.
All computations shall be mathematically correct and shall include information to identify the bid item, date, and who performed, checked, and approved the computations. Computations shall be legible, complete, and clearly document the source of all information used including assumptions and measurements collected.
If a computer program is used to perform the computations, the contractor shall provide the engineer with the software identification, vendor's name, version number, and other pertinent data before beginning survey activities. Computer generated computations shall show all input data including values assigned and assumptions made.
The elevations of permanent and temporary bench marks shall be determined and recorded to the nearest 0.01 foot. Differential leveling and transit traverses shall be of such precision that the error of vertical closure in feet shall not exceed plus or minus 0.1 times the square root of the traverse distance in miles. Linear measurements shall be accurate to within 1 foot in 5,000 feet, unless otherwise specified in section 9 of this specification. The angular error of closure for transit traverses shall not exceed 1 minute times the square root of the number of angles turned.
The minimum requirements for placing slope stakes shall be at 100-foot stations for tangents, as little as 25 feet for sharp curves, breaks in the original ground surface and at any other intermediate stations necessary to ensure accurate location for construction layout and measurement. Slope stakes and cross sections shall be perpendicular to the centerline. Significant breaks in grade shall be determined for cross sections. Distances shall be measured horizontally and recorded to the nearest
0.1 foot. Side shots for interim construction stakes may be taken with a hand level.
LA – Barataria Basin Landbridge Repair CU 2&7 7-2
Unless otherwise specified in section 9 of this specification, measurements for stationing and establishing the location of structures shall be made to the nearest 0.1 foot.
Elevations for concrete work, pipes, and mechanical equipment shall be determined and recorded to the nearest 0.01 foot. Elevations for earth work shall be determined and recorded to the nearest 0.1 foot.
4. Primary control
The baselines and bench marks for primary control, necessary to establish lines and grades needed for construction, are shown on the drawings and have been located on the job site.
These baselines and bench marks shall be used as the origin of all surveys, layouts, and measurements to establish construction lines and grades. The contractor shall take all necessary precautions to prevent the loss or damage of primary control points. Any stakes or control points lost or damaged by construction activity will be reestablished by the contractor or at contractor expense.
5. Construction surveys
Before work starts that requires contractor performed surveys, the contractor shall submit in writing for the engineer's review: the name, qualifications, and experience of the individuals to be assigned to the survey tasks.
Method 1—Contractor performed surveys shall include:
• checking and any supplemental or interim staking
• performing quantity surveys, measurements, and computations for progress payment
• other surveys as described in section 9 of this specification
Method 2—Contractor performed surveys shall consist of all work necessary for:
• establishing line and grade for all work
• setting slope stakes for all work
• checking and any supplemental or interim staking
• establishing final grade stakes
• performing quantity surveys, measurements, and computations for progress payment
• other surveys as described in section 9 of this specification
Method 3—Contractor performed surveys shall consist of all work necessary for:
• establishing line and grade for all work
• setting slope stakes for all work
LA – Barataria Basin Landbridge Repair CU 2&7 7-3
• checking and any supplemental or interim staking
• establishing final grade stakes
• performing quantity surveys, measurements, and computations for progress payments
• performing original (initial) and final surveys for determinations of final quantities
• other surveys as described in section 9 of this specification.
6. Staking
The construction staking required for the item shall be completed before work on any item starts.
Construction staking shall be completed as follows or as otherwise specified in section 9 of this specification:
Clearing and grubbing—The boundary of the area(s) to be cleared and grubbed shall be staked or flagged at a maximum interval of 200 feet, closer if needed, to clearly mark the limits of work.
When contractor staking is the basis for determining the area for final payment, all boundary stakes will be reviewed by the engineer before start of this work item.
Excavation and fill—Slope stakes shall be placed at the intersection of the specified slopes and ground line. Slope stakes and the reference stakes for slopes shall be marked with the stationing, required cut or fill, slope ratio, and horizontal distance from the centerline or other control line.