S01 Amendment 003 - Attachment 3 - Revised Bid Schedule.pdf

PDF 143 KB Posted

Attached to
BARATARIA BASIN LANDBRIDGE CONSTRUCTION PROJECT - BA-27 Repair - LAFOURCHE AND JEFFERSON PARISHES, LOUISIANA
Solicitation number
12FPC321B0006
Issued by

About this file

This document contains an invitation for bids for a federal construction project. The Barataria Basin Landbridge Construction Project - BA-27 Repair located in Lafourche and Jefferson Parishes, Louisiana requires mobilization, construction surveys, excavation, geotextiles, lightweight aggregate, articulating concrete blocks, and lighted buoys. Bids are due by April 30, 2021 at 12 pm Central time and will be opened via teleconference. A pre-bid site visit is scheduled for April 13, 2021 at 9:30 am Central time at the Clovelly Boat Launch in Cut Off, Louisiana. The magnitude of construction is between $1,000,000 and $5,000,000 and the performance period is 124 days after notice to proceed. Davis Bacon wage rates apply. This acquisition is set aside for small businesses.

View the file

Other files

File Type Posted
S01 Amendment 003 - Attachment 6a - BA-27 CU2 AS-BUILTS.pdf PDF
S01 Amendment 003 - Attachment 6b - BA-27 CU7 and 8 AS-BUILTS.pdf PDF
S01 Amendment 003 - Attachment 7 - Note to Contractors Regarding Geotechnical Reports.pdf PDF
S01 Amendment 003 - Attachment 8a - BA-27 Geotechnical Rpt 1.PDF PDF
S01 Amendment 003 - Attachment 9 - List of Points Staked for Site Showing.pdf PDF
S01 Amendment 003 - Attachment 10 - Consolidation Test Data.pdf PDF
S01 Amendment 003 - Attachment 2 - Questions and Responses.pdf PDF
S01 Amendment 003 - Attachment 5 - DRAWINGS (Complete Set) - REV May 2021.pdf PDF
S01 Amendment 003 - Attachment 8c - BA-27 Geotechnical Rpt 3.pdf PDF
S01 Amendment 003 - Attachment 4 - CONSTRUCTION SPECIFICATIONS - REV May 2021.pdf PDF
S01 Amendment 003 - Clarification Corrections Revised and additional documents.pdf PDF
S01 Amendment 003 - Attachment 8b - BA-27 Geotechnical Rpt 2.pdf PDF
S01 Amendment 003 - Attachment 1 - Site Showing-List of Participants.pdf PDF
S01 Amendment 003 - Attachment 8d - BA-27 Geotechnical Rpt 4.pdf PDF
S01 Amendment 003 - Attachment 11 - Test Data Summaries.pdf PDF
S01 Amendment 002 - Change in Site Visit Date.pdf PDF
S01 Amendment 001 12FPC321B0006 BA-27 Repair-Louisiana.pdf PDF
S01 Attachment 2 - BA-27 Repair Plan Set Feb 2021 Stamped.pdf PDF
S01 IFB 12FPC321B0006 BA-27 Repair-Louisiana-VER 03222021.pdf PDF
S01 Attachment 3 - Wage Determinations.pdf PDF
S01 Attachment 1 - BA-27 REPAIR SPECIFICATIONS - March 2020 Stamped.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 12FPC321B0006

Updated thru FAC 2021-03 dated Feb 16, 2021 Page 5 of 45

Amendment 003

PART I – THE SCHEDULE

Barataria Basin Landbridge Project - BA-27 Repair

LaFourche and Jefferson Parishes, LA

B - SUPPLIES OR SERVICES AND PRICES

This solicitation requires bidding on all line items, failure to do so will disqualify the bid.

Item No. Supplies/Services Spec.

No.

Quantity Unit Unit Price

Amount

Mobilization/Demobilization

LS

XXXXXX

Construction Surveys

Excavation, Flotation/Access

Geotextile

9,216 *

SY

Lightweight Aggregate

1710 *

CY

Articulating Concrete Blocks

768 *

LF

Lighted Buoys

9 *

EA

TOTAL BID: $____________________________

SUBMITTED BY:________________________________________ DUNS#____________________

52.211-18 Variation in Estimated Quantity. (Apr 1984) If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

(End of clause)

Quantities marked with an * above are estimated quantities and the clause FAR 52.211-18 Variation in Estimated Quantity, applies.

ONE AWARD FOR THE AGGREGATE OF ALL ITEMS WILL BE MADE AS A RESULT OF THIS SOLICITATION