SOW/Specification for the Demolition of existing structures
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
STATEMENT OF WORK/SPECIFICATION
BUILDING DEMOLITION, DISPOSAL AND SITE RESTORATION
USDA NRCS
BIG FLATS PLANT MATERIAL CENTER
3266 State Route 352
Corning, NY 14830
I. PROJECT
The Big Flats Plant Materials Center (BFPMC) is demolishing the existing office building in preparation for replacement with a modular structure. This Statement of Work will encompass the property and site pre-cleaning activities, removal of Site safety hazards and solid and hazardous waste, building and site demolition, and site restoration activities.
The site will generate various waste types that are required to be segregated, managed, and disposed of in accordance with applicable regulations. All wastes shall be properly manifested, transported, and disposed of at an approved offsite facility, pursuant to all applicable federal, state and local regulations.
A. The Site: The BFPMC office is approximately 1800 sqft building that is 46’ X 20’ (main office) with a 20’ X 32’ addition (conference room) and 13’ X 24’ green house. There is a basement under the main office and a standard crawl space under the conference room.
The green house is on a slab style foundation. The main office is approximately 65 years old.
B. Site Restoration: The demolition site will be temporarily seeded and mulched. No fill beyond what is required to stabilize the site is expected under this statement of work.
C. Regulatory Status: It is NRCS BFPMC understanding that the site does not have any open soil or ground water contamination issues with NYSDEC.
D. Identified Responsible Personnel:
• Owner/Client: Shawnna Clark, BFPMC Manager
• NRCS Contracting Officer (CO), Lauri Eipp
• NRCS Contracting Officer Representative (COR), Ron Young
• Contractor/Demolition Contractor shall mean the firm responsible for the performance of the work.
E. Contractor’s Scope of Work: In general, the contractor SOW consists of pre-cleaning activities, removal of site safety-hazards, demolition of existing office building, solid and hazardous waste and site restoration. The base bid SOW for demolition activities consists of removing all sections of the office building, conference room addition and green house including slabs, foundations, footings, sidewalks and deck, backfilling and restoring the site in preparation for installation of a modular office building.
The office building and the waste therein have been characterized to identify contaminated materials, asbestos, lead, etc. The results are summarized Section II Hazardous Materials of this SOW. The contractor will be responsible for the segregation, stockpiling, management, and disposal of all waste types in accordance with this SOW. All regulated waste shall be properly manifested, transported, and disposed of at an approved offsite facility, pursuant to all applicable federal, state, and local regulations.
All material, labor, supervision, tools and equipment will be furnished by the contractor.
Contractor shall have a Project Manager available, on-site, to the COR during normal work hours Monday through Friday 8:00am to 4:30pm, excluding federal holidays. The Project Manager shall be the central point of contact with NRCS for performance of all work under this contract. Project Manager shall be responsible for overall management and coordination of matters pertaining to this contract.
F. Site Security:
1) The contractor shall be responsible to maintain site security. A temporary construction gate and fencing shall be installed to maintain site security and restrict access to the site.
2) Security of the Contractor’s work areas, office, equipment, materials, and supplies will be the responsibility of the Contractor. The federal government is not liable for damages or losses of equipment due to theft or vandalism.
3) Work area to be defined by the Contractor, shall be restricted only to authorized, trained, and protected personnel. These may include Contractor’s employees, Owner, COR, State and Local inspectors, and any other designated individuals.
4) Entry into the work area by unauthorized individuals shall be reported immediately to the Owner and COR by the contractor.
G. Protection of Persons & Property:
1) The contractor shall ensure the free and safe passage of BFPMC personnel and visitors around the work areas by the use of fences and barricades. All operations shall be conducted to prevent damage to adjacent buildings, facilities, structures, and utilities and injury to persons.
2) Existing facilities will remain open during the demolition and restoration period. All access roadways must remain open to traffic unless otherwise permitted by the Owner.
3) All work that may produce fire hazards, create nuisances or health and safety hazards from noise, vibration, or air emissions shall not be performed unless preventative control measures are implemented.
4) The site is located adjacent BFPMC facilities. Protection of these facilities from construction related nuisances (i.e. noise, traffic, dust, pollution, etc.) shall be a priority of the contractor.
5) Protective procedures shall not begin until review by the Owner and COR is complete. Such a review shall in no way relieve the Contractor from their responsibility to execute the work in a safe manner and in accordance with all applicable federal, state and local regulations and requirements.
6) All work shall be completed as neatly as possible, drop clothes will be used to cover exterior landscape when necessary and all debris will be picked up and removed from the site.
7) All application, material handling and associated equipment shall conform to and be operated in conformance with OSHA 52.236 and alterations to include NRCS Supplement to OSHA parts 1910 & 1926.
8) All existing trees and hedge rows shall be maintained and protected at all times during the performance of this SOW unless otherwise noted in the demolition drawings.
H. Protection of Utilities: The contractor will identify and mark all utilities in the field prior to any work on Site. In addition, utilities will be protected for safe use during demolition.
Utilities will be disconnected, cut, capped and closed as appropriate during the course of the demolition. Specific requirements for utilities are outlined below within Part VI.B of this
SOW.
I. Project Sequencing and Scheduling: This project will be conducted in stages as defined below. The stages will be coordinated with the Owner and COR and may overlap or be conducted concurrently, based on approval from the Owner and COR. The actual means and methods are the responsibility of the Contractor; the following stages are only recommendations. Additional details are provided in Section VI Building and Site Demolition.
Stage 1: Pre-demolition and mobilization – prepare and gain Owner and COR approval on all required plans, certifications, documents, and permits. Hold initial tailgate safety meetings. Establish temporary utilities and facilities at the site. Install site safety and environmental measures. Identify construction laydown, equipment and waste storage areas. Perform utility mark-outs.
Stage 2: Perform pre-demolition clean-up of hazardous and non-hazardous waste and materials from the Site and from within the building.
Stage 3: Remove all solid waste, garbage, furniture, equipment, etc. from the Site and from within the building.
Stage 4: Demolition of building as identified.
Stage 5: Site restoration and stabilization.
Stage 6: Site clean-up and demobilization.
Stage 7: Project close-out and documentation
J. Reference Guidelines, Standards and Regulations: All work performed shall be done in strict compliance with the project drawings and this SOW as well as all applicable federal, state, and local statutes, regulations, standards, and codes.
1) The most current edition of any relevant statute, regulation, standard, or code shall be in effect.
2) Copies of all standards, regulations, codes, and other applicable documents, including this SOW and those listed in this section, shall be available at the Site.
3) Relevant regulations promulgated by the entities listed below form a part of this SOW to the extent referenced. The publications are referred to within the text by the basic designation only.
(i) Occupational Safety and Health Administration (OSHA)
(ii) US Environmental Protection Agency (EPA)
(iii) Federal and State of New York Departments of Transportation (DOT)
(iv) New York State Department of Environmental Conservation (NYSDEC)
4) The work procedures have been developed to incorporate the substantive and applicable requirements of the governing codes and standards. This SOW provides general definition and guidelines to be followed by the Contractor; they do not represent the entire compendium of potential requirements. Contractor shall follow all required codes, standards, and regulations if applicable to this SOW.
II. Hazardous Materials
A. The joint compound associated with drywall throughout the building has been determined to contain 1.56% chrysotile asbestos. The asbestos containing material (ACM) must be removed by a licensed asbestos abatement Contractor according to the Federal and State guidelines before any demolition work disturbs the ACM. The contractor is responsible for including the cost of this abatement in their price proposal for this work.
B. The tan floor tile and associated mastic in the men’s restroom has been determined that the floor tile contains 4.3% chrysotile asbestos and the associated mastic contains 2.2% chrysotile asbestos. This asbestos containing material (ACM) must be removed by a licensed asbestos abatement contractor according to the Federal and State guidelines before any demolition work disturbs the ACM. The Contractor is responsible for including the cost of this abatement in their price proposal for this work.
C. The roofing materials have not been tested for asbestos containing materials (ACM), but they may contain suspect ACM. The asphalt shingles, tar paper, and roofing tar must be tested for ACM prior to removal. The Contractor is responsible for including the cost of this testing by a licensed asbestos contractor in their price proposal for this work. If the roofing tests positive for ACM, a modification of the awarded contract will be processed to reflect the additional cost incurred due to the presence of ACM’s.
D. Lead-any proposed lead abatement shall comply with the following:
1) Contractor shall have a competent person who is trained in the recognition and control of lead hazards in accordance with current federal, state, and local regulations.
The competent person does not have to be a Certified Industrial Hygienist(CIH).
2) Use procedures and equipment required to limit occupational and environmental exposure to lead when LBP is removed in accordance with 29 CFR 1926.62.
3) Disposal of removed paint chips and associated waste in compliance with USEPA, state and local requirements. Disposal shall be conducted in accordance with all federal and state regulations.
III. Scope of Work
A. Demolition Permit Requirements: Prior to the start of work, the Contractor shall make sure that they meet all the Demolition Permit Requirements as per the Town of Big Flats. Due to this being a federal facility, actual Town of Big Flats permit is not required to perform the work.
B. Pre-Demolition and Mobilization: Prior to the start of work, the Contractor shall prepare and obtain the Owner’s and COR’s acceptance on all required project plans, certifications, documents, and permits. All work plans (HASP, Waste Management Plan, etc.) shall be prepared in accordance with all applicable federal, state, and local regulations and submitted for Owner and COR review and acceptance.
The contractor shall maintain copies of all requested documents, specified in this contract, onsite and organized for inspection by the Owner and COR at all times.
All permits shall be prepared in accordance with all applicable federal, state, and local regulations and submitted for review and acceptance by the Owner and COR.
Prior to initiating any demolition, Contractor shall coordinate with Owner and COR the capping of all utilities in accordance with contract drawings and demolition requirements set forth by the Town of Big Flats. Contractor shall initiate utility mark-outs through the New York “One Call system”.
Contractor shall install site safety and environmental measures, such as soil erosion and sediment control measures (SESC).
Observe all restrictions imposed by the Town of Big Flats.
Contractor shall minimize dust generated with proactive control measures.
Prior to commencing any work at this site a project specific Health and Safety Plan (HASP) shall be provided to the Owner and COR for acceptance. The HASP describes the minimum safety, health, and emergency response requirements for construction activities at the site. The responsibility for development, implementation, and enforcement of the HASP lies with the Contractor and its health and safety personnel.
The Owner and COR shall be responsible for monitoring the activities of the Contractor. Contractor’s work shall be modified if the work produces perimeter and on-site dust and air emissions above regulatory limits and if, based on Owner and COR judgement, work causes a nuisance to the surrounding facilities. The Contractor will be responsible for implementing engineering controls to reduce the amount of dust within the site during active demolition and decontamination activities.
C. Solid Waste Removal: The Contractor shall segregate and remove all solid waste and construction debris (C&D) from the Site prior to the start of demolition. The Contractor shall be responsible for ensuring its workers are following the approved HASP and Waste Management Plan with regards to handling the waste materials.
D. Building and Site Demolition: The contractor shall perform the following tasks:
1) All work shall be conducted in conformance with all applicable federal, state, and local regulations.
2) The complete demolition of the building all foundations, slabs, underground utilities, sidewalks, deck, etc. shall be performed in accordance with this SOW and design drawings.
3) Remove full thickness of on-site concrete, foundation, walls, slabs and sub-base, down to soil.
4) Except for items or materials indicated to remain by the Owner and COR, demolished materials shall become the Contractor’s property and shall be removed from the Site and disposed of or recycled as indicated in the Contract Documents.
5) Do not allow demolished materials to accumulate on site.
E. Material Crushing and Recycling: No onsite crushing of any materials will be performed during demolition activities.
F. Site Restoration: Site Restoration activities will include backfilling to the extent necessary to stabilize the site. Temporary seeding and mulching will be included as part of the site restoration and stabilization.
G. Project Close out and Documentation:
1) The contractor shall provide all final project documentation including disposal manifests.
IV. Submittals
The Contractor is responsible for reading the contract documents in their entirety and submitting all requested submittals, as specified throughout these documents, to the Owner and COR for review and approval. The Contractor is responsible for including all minimum requirements of each submittal as specified in this contract.
Prior to beginning work at the Site, the Contractor shall prepare and submit the following required submittals to the Owner and COR for review and acceptance:
A. List of Contractor’s Submittals (Prior to Work)
1) Project Specific Health and Safety Plan (HASP)
2) Project Schedule
3) Utility mark-out (NY One Call)
4) Material Handling Plan
B. List of Contractor’s Submittals (During the Project Execution)
1) Accidents and Incidence Reports
2) Daily Logs
3) Project Close-Out Report
V. Site Control
A. Routine Requirements: The Contractor’s project manager shall meet with the Owner and/or COR at the completion of the day’s activities to discuss the work performed.
B. Control Work Zones
1) The contractor shall be responsible for conducting operations at the Site in such a controlled fashion as to reduce the exposure to project site hazards.
The Contractor shall delineate work zones (lead based/containing paint removal, building demolition, excavation, equipment storage and laydown, waste stockpiles, and parking, etc.) in which specific operations or tasks will occur and shall require specific PPE.
2) The Contractor shall provide the Owner and COR with a list of all Contractor and subcontracted personnel who are authorized to enter the site prior at the start of operations and will update the list as necessary. Any regulatory agency representatives shall have unlimited access to the site if the official business pertains to the demolition. The Contractor shall be responsible to restrict all unauthorized entrants from the site.
VI. Building and Site Demolition
A. Ownership:
1) Except for items or materials indicated to remain the BFPMC property, demolished materials shall become the Contractor’s property and shall be removed from the Site and disposed of or recycled as indicated in the Contract Documents.
2) Any discrepancies among this SOW and existing conditions shall be quickly referred to the Owner and COR for clarification via a Request for Information (RFI), before proceeding with the work. For this project, the most stringent requirements shall be followed, whenever the contract documents are in conflict, the following hierarchy shall be followed:
i. Specific Written Owner Instructions
ii. Contract and Commercial Terms
iii. Project Specifications
iv. Verbal Instructions
B. Utilities:
1) The utility locations identified on the project specifications are provided for general informational purposes only and are approximate in nature. All utilities, their sizes and locations must be field verified.
2) The Contractor is responsible for retaining “One-Call” to perform a mark-out of all utilities along the entire property boundary. No Subsurface work shall begin until the utility Mark-out has been performed.
3) The Federal Government assumes no responsibility for the methods, techniques, or procedures of the Contractor, for safety measures or precautions related to demolition activities or any failure to comply with applicable laws, regulations, ordinances, or codes.
4) Contractor shall verify the location of existing utilities in the field prior to demolition. This shall include excavating test pits if necessary.
5) Contractor shall coordinate all utility work with the Owner and COR prior to initiating any work on Site. All applicable utility companies shall be contacted to define specific requirements and locations of utility capping.
6) Contractor shall make arrangements to provide all utilities needed to execute the work independently from the Site.
7) Prior to removal, all utilities shall be properly purged and evacuated of all residual gasses, oils, water, etc., or de-energized in the case of electricity, telephone, or other communication services. All purging and testing shall be conducted by the utility company and governing authorities having jurisdiction.
8) Written confirmation from the utility company that service has been terminated shall be submitted to the Owner and COR by the contractor prior to the beginning of any abandonment or removal of utilities or prior to the commencement of demolition.
9) The Survey of existing utilities entering the Site and distributed throughout the Site are provided as general representative information to the Contractor.
The survey does not represent all potential subsurface or aboveground conditions that may be encountered on the Site during Contractor activities.
10) The municipalities and companies concerned shall be notified (in writing) when disconnections, terminations, or reconnections are required, and the work shall be performed in accordance with their standard practices and requirements and under their supervision, or arrangements shall be made for the work to be performed with their forces.
11) The Contractor shall perform demolition operations and removal of debris to ensure minimum interference with roads, streets and normal BFPMC operations. Activities that require closure or obstruction to ongoing BFPMC activities shall not be done without permission of the Owner and COR. If applicable, repair damages caused to facilities outside the work zone as a result of the demolition operations.
12) Should uncharted, or incorrectly chartered piping or other utilities be encountered during removals, contact the Owner and COR immediately for directions.
13) Typical subsurface conditions are represented by the Survey provided;
however they do not represent all possible conditions.
C. Specific Utility Requirements:
1) Copies of all documentation related to utility work shall be provided to the Owner and COR.
2) Power - Power to the Site shall be cut-off and render the entire site intrinsically safe.
i. The contractor is responsible for providing temporary power to the Site to execute this contract.
ii. All temporary power sources shall be managed to prevent spills and environmental contamination.
3) Water Supply – The supply line shall be capped at a location which provides sufficient protection to the service during the demolition process.
i. Service will be maintained at other BFPMC facilities during this time.
ii. Any water supply interruptions to BFPMC shall be approved by the
Owner and COR prior to commencement of the interruption.
4) Natural Gas –
i. Existing natural gas heating system and generator will be removed during preliminary demolition preparations by appropriate manufacture vendor.
ii. Contractor will be responsible for coordinating the removal and capping of the natural gas meter and supply line with the appropriate utility supplier.
5) Telephone and Other Communications Systems – Shall be terminated at a location which provides sufficient protection to the service during the demolition process. Service will be maintained at other BFPMC facilities during this time.
D. Scope of Demolition Work:
Contractor is responsible for means and methods for safe and economical demolition tasks. Contractor shall prepare a Demolition Plan that details the means and methods. This contract for building and site demolition includes the following components:
1) Removal of surface debris – The Contractor is responsible for segregating, stockpiling, and disposing all surface debris that exists at the Site. This may include, but is not limited to glass, metal, concrete, wood, furniture and equipment, vegetation, solid and hazardous waste and gravel.
2) Demolition and removal of concrete/masonry surfaces – The Contractor shall break up and remove existing concrete/masonry walkways, stairs, pads, drainage structures, foundation, footings, etc. All concrete and subbase material shall be removed from these areas so that the underlying soil is exposed. Non-sampled concrete shall be segregated and stockpiled separately for sampling if being recycled (onsite or offsite) or offsite disposal as household waste. No concrete shall be recycled (onsite or offsite) without proof of analytical sampling and Owner and COR consent.
3) Utilities – All existing utilities shall be identified, cut and capped. All utilities shall be capped a minimum distance to ensure protection during the demolition process and allow efficient reconnection during modular office installation. Trenching performed for the removal and capping of existing utilities shall be performed in accordance with OSHA CFR 1910 and 1926, along with all federal, state, and local regulations. Soils excavated from utility trenching shall be stockpiled a minimum of 2-feet from the edge of the trench and shall be re-deposited in the trench upon removal of the utilities.
4) Removal of hazardous materials – Prior to the demolition all hazardous materials shall be removed from the buildings and stockpiled separately for offsite disposal. A list of potential hazardous materials identified or likely to be present within the former structure include, but is not limited to: fire and smoke detectors, gauges, thermostats, switches, and rodents.
5) Demolition of above grade building material – The Contractor shall be responsible for demolishing the former office building in accordance with this contract.
6) Excavations of building foundations and basement – The Contractor shall excavate and remove all building foundations down to soil and/or rock. This includes all concrete, sub-base materials, retaining structures, tie-ins, utility runs, foundation drains, footings, etc. The Contractor is not authorized to use explosives.
7) This contract is for the complete demolition of the onsite BFPMC office building, including all foundations, footings, underground utilities, obstructions, etc. This process supports the installation of a modular office structure on this Site.
E. Sequence of Demolition Work:
1) No Site work shall begin until the following are completed:
i. All requested Plans have been submitted, reviewed, and accepted by the Owner and COR.
ii. “One-Call” mark-outs performed and submitted to Owner and COR.
iii. All federal, state, and local permits/authorizations have been received and submitted to Owner and COR.
iv. All Soil Erosion and Sediment Control (SESC) measures installed in accordance with Standards for SESC in New York.
v. HVAC System has been completely removed from the office structure by other vendor. This does not include internal ducting throughout the structure.
vi. The backup generator system has been removed by other vendors.
vii. Asbestos testing of roofing materials completed and results submitted to the Owner and COR.
2) The general sequence of demolition work is anticipated to be the following:
i. Remove Site Safety hazards to the maximum extent possible.
ii. Remove hazardous, non-hazardous and solid waste materials.
iii. Identify, cut and cap subsurface utilities
iv. Remove wall caulking, expansion joint material, floor tiles, roofing material (if tested positive for asbestos) prior to demolition. Segregate this waste material for further characterization prior to disposal.
v. Remove materials with lead based/containing paint previously identified and in accordance with the Asbestos and Lead Report.
vi. Demolish surface concrete (i.e. walkways, curbs, stairs, pads, etc.) as identified. This also includes demolition of the outside deck entrance to the office and the outside concrete entrance to the basement.
vii. Demolish above grade buildings, segregating concrete and brick.
viii. Excavate and remove building foundations and footings.
ix. Restore site in accordance with Section X of this SOW.
x. Clean site and demobilize all equipment and remaining debris/waste.
F. Demolition Methodologies:
1) The Contractor, based on representative experience, is in a best position to select appropriate means and methods for demolition methodologies. This SOW provides general guidelines for executing the work. Demolition and abatement means and methods are the requirements of the Contractor.
2) Contractor is cautioned to select methodologies that will prevent demolition debris, including dust, from escaping the Site. Spill containment and spill control measures shall be in place at all times.
3) Mitigation measures such as constant fire control, foam and covering of debris piles shall be employed at all times. Owner and COR will stop work if Contractor has not been diligent in conducting demolition activities to avoid impacts to surrounding facilities and personnel.
4) Contractors shall evaluate the best means for moving material to off-site disposal facilities.
5) Contractor shall provide truck traffic plans and routes to the Owner and COR for acceptance in the Demolition Plan and/or Waste Management Plan. The Contractor is expected to meet all traffic requirements including routes and times of operations imposed by local regulations.
G. Demolition Material Handling
1) All demolition material shall be characterized and segregated by type and handled using the methods appropriate to each specific type of waste, as identified in Section VIII of this SOW.
2) Real or potentially contaminated demolition material shall be stockpiled and protected in a manner that prevents the spread of contaminants to the environment and people.
3) All waste materials generated from this Site that are not hazardous shall be managed as solid waste in accordance with NYSDEC and federal regulations.
H. Scrap Metal Recycling:
1) Contractor shall segregate metal material from demolition debris for maximum scrap metal potential.
2) Scrap metal shall be segregated and stockpiled based on metal type.
3) The Contractor shall be responsible for recycling all scrap metal. The
Contractor is responsible for all transportation and disposal cost and may retain benefits from recycling the metal materials.
4) Contractor is responsible for tracking the volume of scrap metal, the amount of disposed of as waste and the amount recycled. This information shall be recorded in the Waste Material Management Plan, documented by manifests, and supplied to the Owner and COR.
I. Demolition Submittals and Notices:
1) Contractor shall develop, implement, maintain, and supervise as part of the work, a comprehensive Demolition Plan for all necessary work and related operations under this contract. The Demolition Plan shall be based on work experience and on the guidance provided in this SOW, and industry standards and regulations. No work shall be performed, with exception of Site inspections and mobilization, until the Demolition Plan is reviewed and accepted by the Owner and COR.
2) Health and Safety Requirements – the Contractor shall conduct all activities in accordance with the HASP requirements outlined in this contract.
3) Materials Management – the Contractor shall conduct all activities in accordance with this contract and the accepted Waste Management Plan.
4) Shipping Manifest – All materials and waste generated from the Site shall be manifested in accordance with 40 CFR Part 262, 40 CFR 761 and applicable State of New York regulations.
5) Contractor is responsible for tracking the volume of all demolition debris, the amount disposed of as waste and the amount recycled. This information shall be recorded and documented by manifests, and supplied to the Owner and
COR.
VII. Environmental Controls
A. General: The Contractor shall plan for and provide comprehensive environmental protection measures for the duration of the project. These measures will be designed and installed to prevent pollution of all media and correct conditions that develop during normal execution of this contract. The Contractor shall confine activities to within the limits of the work areas indicated or specified. The Contractor shall take all measures necessary to ensure removed hazardous materials do not migrate of site.
Environmental protection includes the protection of the Site and surrounding areas.
Environmental protection requires consideration of air, water, soil, wetlands, fish, wildlife and flora and involves solid and hazardous waste management.
B. Scope of Environmental Protection Activities:
1) Furnish all labor, materials, and equipment and perform all work required for the protection of the environment during the execution of this contract. In order to prevent and provide for abatement and control of any environmental pollution arising from the demolition activities in this contract, the Contractor and their subcontractors shall comply with all applicable federal, state and local laws and regulations.
2) The Contractor shall, upon receipt of notice in writing of any non-compliance with this contract or federal, state or local regulations, take immediate corrective action. If the Contractor fails or refuses to comply promptly, the Owner and COR may issue a “Stop Work Order” on all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop work order shall be made part of the future damage claims by the Contractor unless it was later determined that the Contractor was in compliance.
C. Protection of Land Resources: Preserve the land resources within the project boundaries and outside the limits of permanent work performed under this contract in their present condition or restore to a condition, after completion of construction, that will appear to be natural and not detract from the appearance of the project.
Contractor shall confine construction activities to areas defined by this contract.
D. Soil Erosion and Sediment Control:
1) Prevent the erosion of exposed soils in active demolition and cleared areas by implementing the Soil Erosion and Sediment Control (SESC) measures in accordance with NYSDEC Standards for SESC in New York (latest version).
2) The Contractor shall, at a minimum, comply with the construction sequence and the SESC implementation schedule provided. No Site work will begin until the SESC measures specified for the demolition are installed in accordance with the Standards for SESC in New York (latest Version).
3) The Owner and COR shall inspect the SESC measures throughout the duration of the project for compliance with the said specifications. Should deficiencies be identified, the Owner and COR may request modification to the SESC measures at no additional charge to the Federal Government.
4) Excavation shall not be initiated at a given location until the method and sequencing of all operations are accepted by the Owner and COR. The Contractor shall schedule and conduct their operations to minimize erosion of soils and to minimize silting and muddying of catch basins adjacent to or affected by the work.
5) The Owner and COR has the authority to limit the surface area of erodible earth material exposed by clearing and grubbing, excavation of borrow and fill operations and to direct the Contractor to provide immediate erosion control measures to minimize damage to adjacent property and to minimize silting or muddying of adjacent streams or drainage ditches.
6) Any disturbed area that will be left exposed for more than thirty (30) days and not subject to construction traffic shall immediately receive temporary seeding, in accordance with the demolition drawings, the disturbed area will be mulched with straw or hay in accordance with the demolition drawings.
7) SESC Measure – At a minimum, the follow SESC measures have been identified and shall be implement for this project:
i. Stabilized Construction Access Pad
ii. Silt Fence Perimeter Controls
iii. Stockpile Controls
iv. Dust Controls
v. Tree Protection
vi. Temporary Stabilization Measures
E. Stormwater Management:
1) All stormwater shall be managed to minimize SESC transport offsite. The Contractor shall inspect the SESC measures regularly and make adjustments accordingly to ensure stormwater runoff is not ponding onsite or being discharged from the Site untreated.
2) Surface water shall be managed in order to minimize work delays, reduce the quantity of contaminated surface water, prevent construction vehicles and other equipment from slipping or becoming stuck in the work area, and protect completed or partially completed work.
3) The Contractor shall employ diversion berms, or equal, to divert stormwater from demolition activities and equipment, utility trenches, building foundations under demolition, or areas where it would be a nuisance as much as practical.
4) At all times during this contract, the Contractor shall provide, place, and maintain ample means and devices with which to promptly remove and dispose properly of all water entering excavation or water that may flow along or across the Site in order to keep said excavations dry until backfill has been completed. The Contractor shall provide all labor, materials, and equipment for water management during this contract as described herein.
5) Pumping equipment shall be portable in nature. The pumps shall be powered by gasoline, diesel fuel, diesel generators, or otherwise self-sufficient means.
6) The Contractor shall supply all necessary equipment and material such as fill, stone, portable pumps, generators, pipes, hoses, valves, fuel tanks, storage tanks, etc., for water collection and conveyance.
7) All water pumped from the work area shall be disposed of by Contractor in accordance with applicable regulations.
F. Spill Control and Reporting:
1) The Contractor shall maintain spill prevention equipment, implement spill prevention procedures, and clean up spills during the implementation of the work in accordance with:
i. National Oil and Hazardous Substance Pollution Contingency Plan 40 CFR 300Storage of
ii. Federal Clean Water Act 33 USC 1321 (h)(l)
iii. The Spill Prevention Control and Countermeasure 40 CFR Part 112
2) The Contractor shall provide contingency measures for protentional spills of construction-related materials such as, but not limited to, diesel fuel, hydraulic fluid, off-site discharges from dewatering activities and potentially contaminated liquid from decontamination activities.
3) The spill and discharge mitigation shall include the following:
i. Procedures for containing dry and liquid spills
ii. Availability of absorbent material on site
iii. Storage of spilled materials
iv. Decontamination procedures may be required after cleanup to eliminate traces of the substance spilled or reduce it to an acceptable level. Acceptable levels shall be determined by the Owner and COR.
Complete cleanup may require removal of contaminated soils.
Personnel decontamination shall include showers and cleansing or disposing of PPE. All contaminated material such as soil and wood that cannot be decontaminated must be properly containerized, labeled, and properly disposed of as soon as possible. Any and all testing and disposal costs related to the cleanup of a spill caused by the Contractor’s activities shall be assumed by the Contractor.
v. The Contractor shall provide provide and maintain on-site methods, means, and facilities required to prevent contamination of soil, water, atmosphere, equipment, or materials from spills due to Contractor’s operations.
vi. The Contractor shall provide equipment and personnel to perform emergency measures required to contain any spillage and to remove spilled materials and soils or liquids that become contaminated due to spillage. Collected spill-contaminated material shall be properly disposed of at the Contractor’s expense.
vii. The Contractor shall provide equipment and personnel to perform decontamination measures that may be required to remove spillage from previously uncontaminated structures, equipment, or material.
Decontamination residues shall be properly disposed of at the Contractor’s expense.
viii. Spill incident Report. The Contractor shall provide a written report detailing the spill or discharge, which shall include (at a minimum) the cause and resolution of the incident, and date the incident occurred.
The report shall be submitted to the Owner and COR within 24 hours of the incident. The contractor shall document the location of all spills on the site drawings and submit the drawings to the Owner and COR.
ix. Spill Reporting. Contractor shall notify the Owner and COR of all on-site spills. The Contractor shall notify all applicable agencies. A written follow-up shall be submitted to the Owner and COR no later than 7 days after the initial report. The written report shall be in narrative form an at a minimum include the following:
a. Description of the material spilled (including identity, quantity, and manifest number)
b. Whether amount spilled is EPA/State reportable and when and to whom it was reported
c. Exact time and location of spill, including description of the area involved
d. Receiving streams or waters
e. Cause of incident and equipment and personnel involved
f. Injuries or property damage
g. Duration of Discharge
h. Containment procedures initiated
i. Summary of any communications Contractor has had with government agencies
j. Description of clean-up procedures employed or to be employed at the site, including disposal location of spill residue
G. Flushing of Utility lines and Vessels
1) The Contractor is responsible for flushing all utility lines, tanks, and vessels onsite within the SOW. Some lines/vessels may still contain liquid/sludge that the Contractor shall safely drain, containerize for temporary onsite storage, and dispose of in accordance with federal, state, and local requirements.
2) The Contractor is responsible for accidental spills during flushing of utilities and vessels. Reporting of any spill shall be described in the HASP and conducted in accordance with federal, state and local requirements.
H. Trash and Debris: The site is located adjacent to BFPMS facilities; therefore construction site cleanliness is of utmost importance for this project.
1) The Contractor shall control and dispose of trash and debris resulting from the work under this contract. The Contractor shall provide a trash receptacle(s) for workers and remove when it is full at no additional charge to the Federal Government. Trash receptacles shall be removed at the end of the work.
2) The Contractor is responsible for keeping the site clean of trash and debris.
No trash or debris is allowed to accumulate along the perimeter fencing or be allowed to escape the Site.
3) The Owner and COR will perform inspections of the Site throughout the duration of the project. Any trash and debris observed uncontrolled and not within a designated area will be discussed with the Contractor. Any corrective action should be taken immediately. The Owner and COR may issue a “Stop Work Order” until corrective action has been taken. If the Contractor fails or refuses to comply promptly, the Owner and COR may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made part of the future damage claims by the Contractor unless it was later determined that the Contractor was in compliance.
I. Noise and Dust Abatement: The Site is located adjacent to BFPMC facilities;
therefore, construction site noise and dust mitigation are of utmost importance for this project.
1) The Contractor shall provide continuous noise and dust control as required to prevent disturbance and nuisance to the workers, general public, and occupants of BFPMC and surrounding areas, in accordance with state and local requirements.
2) The Contractor shall provide control and mitigation techniques for dust emissions throughout the duration of the project.
3) During building pre-cleaning and demolition operations, the contractor shall continually use suitable methods to minimize the amount of dust rising and scattering in the air to the lowest practicable level possible. The Contractor shall dampen or treat areas affected by the operations to prevent the spread of dust with dust suppressants as necessary; however, the Contractor shall not use water if it results in hazardous or objectionable conditions such as (but not limited to) ice, flooding, or pollution. Water used in attenuating dust during building decontamination shall not be allowed to migrate off site.
4) The Contractor shall restrict building demolition activities on days when wind conditions significantly elevate uncontrollable levels of airborne dust from the site.
5) The Contractor will provide perimeter and onsite dust monitoring activities.
Should dust levels be detected above the acceptable levels, the Contractor will modify or stop operations generating dust. Mitigation measures shall be implemented to reduce the amount of dust generation at no additional expense to the Federal Government.
6) The Contractor shall make all attempts necessary to reduce noise generation from the site during operations. Strict adherence to local noise ordinances shall be implemented throughout the project. Noise levels shall be maintained at or below all applicable federal, state and local standards.
7) When the nature of work or equipment involved is such that a noise level is found to be objectionable by occupants of adjacent premises and/or BFPMC personnel, discussions shall be had with the Owner and COR to perform such work or operate such equipment at the most appropriate time of the day.
8) The Contractor shall provide control measures to the extent feasible and practical by making the maximum use of low-noise emission products (such as mufflers or noise reducing devices) as certified by the EPA.
VIII. Solid Waste Management
A. General: This section addresses the requirements for collecting, storing, transporting and disposing waste (solids and liquids) generated from activities at the Site. Some waste characterization (sampling and analytical) has been completed.
The Contractor will be responsible for any characterization that is not completed.
B. Definition of Waste Streams: The following waste definitions, terms, abbreviations and acronyms when used within this contract shall have the meanings outlined in this section, unless the context clearly indicates otherwise.
1) Demolition Spills: a generic term for all waste materials generated within the Site during the removal of all above and below ground structures, buildings, facilities, such as bricks, concrete, wood, metal, equipment, fixtures, mechanical equipment, piping, etc., that may be contaminated or non-contaminated as defined by applicable disposal regulations.
2) Solid Waste: a generic term for all non-liquid and non-regulated waste materials generated within the implementation of this contract, such as trash and furniture.
3) Liquid Waste: a generic for all liquid waste materials generated within the implementation of this contract, such as decontamination water, dielectric fluids, oils and groundwater.
4) Sediments: a generic term for materials generated from alluvial deposits from water bodies, and or fine grained particles that typically settle from turbid liquids
C. Waste Management Plan: The contractor is responsible for preparing and implementing a detailed Waste Management Plan that includes all potential wastes to be encountered at the site, their onsite handling (collection and storage), transport, and disposal.
1) The Contractor shall provide all equipment, material, and labor required to handle all solid and liquid waste in accordance with all federal, state, and local laws and regulations.
2) The Contractor shall distinguish solid waste and hazardous waste as defined in applicable regulations and laws referenced within this Section. Solid waste and hazardous waste shall be segregated in designated areas prior to off-site disposal.
3) All regulated waste shall be disposed offsite in accordance with all federal, state, and local laws and regulations.
4) If solid waste is temporarily stored in containers prior to off-site disposal, provisions shall be made to cover the container to prevent the generation of airborne dust and/or contaminated runoff.
5) The Contractor shall be responsible for demonstrating to the Owner and COR the disposal method, including the identification of the waste transporter and disposal facility.
6) The Contractor shall be responsible for waste classification sampling for offsite disposal.
7) The Contractor shall provide all equipment, material, and labor required to handle all aqueous waste in accordance with this contract and all applicable federal, state and local laws and regulations.
D. Building Pre-Cleaning: All tasks specified under this section shall be conducted with appropriate PPE, as dictated by the risk, unless otherwise stated in the HASP.
1) Prior to demolition activities, the interior of the buildings requires pre-cleaning to identify and remove hazardous materials and to mitigate worksite hazards and create a safer worksite.
2) Hazardous materials shall be identified, carefully removed, segregated and disposed of in accordance with federal, state and local regulations.
3) Chrysotile Asbestos and Lead Based/Containing Paint – The Contractor is made aware of the presence of chrysotile asbestos and lead based/containing paint. Contractor’s SSO shall evaluate the risk to the workers and to off-site receptors. Depending on the Contractor’s methods, such as a flame cutting, lead abatement measures will be required per OSHA and EPA regulations.
E. Specific Solid and Hazardous Waste: The Contractor shall remove, transport and dispose of all hazardous waste which shall include, but not be limited to, the following:
1) Smoke Detectors – The Contractor shall be responsible for the safe removal of all fire and smoke detectors, and properly recycle or dispose of in accordance with all federal, state and local regulations.
2) Sump Pumps – Prior to demolition, all liquid waste identified in the sump pump located in the basement will be sampled, removed and disposed at an appropriate facility. The Contractor will be responsible for sampling the contents of the sump.
3) Solid Waste and Trash – All on-site solid waste, such as trash, furniture, equipment, building construction materials, etc. shall be removed and disposed at an appropriate facility.
F. Rodents and Varmints: The contractor shall assume that the building will have rodents and varmints, therefore a proactive program of rodent and varmint control shall be performed before demolition.
1) Should evidence of Rodents/Varmints be observed at the Site, the Contractor shall eradicate the Rodents/Varmints either by hiring a contractor or with their own forces in accordance with the Pest Control Operator’s License requirements.
2) The Contractor shall conduct training for workers on various topics, including prevention, monitoring, record keeping, trapping, trap-count assessment, safety, risk evaluation of products, and pest biology and recognition.
3) Throughout the term of this contract, the Contractor’s personnel providing on site-pest management service must have proper certification and training as required by law.
4) The Contractor shall manage indoor and outdoor populations of all pests within ten (10)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.