This is a Questions and Answers document for Amendment 02 to federal contract 12FPC126Q0041, addressing excavation and clearing work for the Don Knoblett project.
The document clarifies four key requirements for contractors: (1) no payment or performance bond is required; (2) grubbed trees of all sizes must be placed at two locations specified on the project plans; (3) mulchers may be used for tree clearing, but roots must be grubbed to a minimum depth of 6 inches or until all roots larger than 1 inch are removed per specification, with mulched debris subsequently moved to the pool area along with other earthen grub material; and (4) contractors are responsible for monitoring site and river conditions to manage moisture control at earthfill placement locations within specification requirements, particularly at the lower-elevation ditch plug areas which are susceptible to river back-flooding and standing water accumulation during wet conditions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 02 – 12FPC126Q0041 – Don Knoblett (Excavation and Clearing)
1) Is there a requirement for payment or performance bond?
1a) No
2) Where do the larger trees that are part of the clearing need placed?
2a) Plans have 2 locations specified for placement of grubbed trees, this include large and small trees
3) Can a mulcher be used on area of trees?
3a) A mulcher can be used, but per specification the roots must be grubbed out to a min depth of 6" or till all roots larger than 1" are removed. Refer to the clearing and grubbing spec. Also the mulched debris will required to be moved to the pool area per plan as other earthen grub material.
4) There is water standing in area where ditch plug #1 has earthfill, what do we do if water is present
4a) it is expected for area to be drier prior to start, but contractors is responsible monitor site and river conditions to ensure earth placement location moisture control is within the specification of earthfill. Note the ditch plug area is lower elevation and can receive river back flooding before remainder of site becomes wet. With 1.5" rain 2 days ago the area of ditch plug 1 and 2 had 0- 6" of standing water as of site showing.