J.1 Statement of Work Pope County Tree Removal 12FPC124Q0009.pdf
PDF 12 MB Posted
- Attached to
- Pope County WRP Easements Tree Removal Federal contract opportunity
- Solicitation number
- 12FPC124Q0009
About this file
This statement of work is for tree removal services on ten Wetland Reserve Program easement parcels totaling 949.6 acres in Pope County, Minnesota. The United States Department of Agriculture Natural Resources Conservation Service Minnesota State Office requires a contractor to remove brush and trees from the ten individual parcels, which range in size from 30 to 250 acres. The total brush management quantity is 949.6 acres, though not all acres contain brush. The contract period is unspecified.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 12FPC124Q0009 Additional Questions and Answers 12 MAR 24.pdf | ||
| S01 12FPC124Q0009 Questions and Answers 6 MAR 24.pdf | ||
| S01 12FPC124Q0009 Request for Quote (RFQ).pdf | ||
| S01 Attachment Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Early Successional Habitat Management –
Tree & Brush Control & Removal Pope County, Minnesota
WRP Easements
Project Summary
NRCS holds conserva�on easements on private land- those easements are enrolled in the Wetlands Reserve Program (WRP). These grassland easements have been previously restored to na�ve prairie vegeta�on; both grasses and broad-leaved plants are present on the easements. Scatered woody vegeta�on has sprouted on these easements and NRCS would like that scatered woody vegeta�on killed, cut and shredded with a follow up spot foliar herbicide applica�on to catch resprou�ng trees.
Exis�ng density of trees varies across the various proper�es, but is generally considered light density.
MN WRP and Brush Management Project Suppor�ng Documenta�on:
• Total Brush Management Quan�ty is 949.6 acres, covering 10 individual parcels. Not all acres have brush on them.
• Length of contract is 2 years ending December 31st, 2025
• COR, Jon Frie, Easement Biologist
Atachments
1. Site Maps with landowner contact informa�on, easement loca�on, easement number, access loca�on and project area loca�on and acres.
2. 314 – Brush Management - Implementa�on Requirements
3. 314 – Brush Management Prac�ce Standard
Government Furnished Informa�on
- GIS shapefile of each easement boundary
Technical Direc�on
Technical direc�on for projects will be provided by an NRCS representa�ve. The contractor and NRCS representa�ve will meet prior to the work being ini�ated and develop a strategy to address all the parcels iden�fied in the project area within the �me frame of the contract.
The objec�ve of tree & brush control & removal is to kill and cut invasive and undesirable woody vegeta�on from the defined areas within the easement. Species to be cut & controlled primarily include:
Cotonwood, Boxelder, Green Ash, Russian Olive, Buckthorn & Red Cedar. Other tree species may be present and may be removed at the discre�on of NRCS. However, target species do not generally include willows and Redosier Dogwood unless specifically noted.
Tree & brush control & removal is to be completed within the following parameters:
1) Kill standing trees by using a combina�on of one of the following methods:
a) Basal treat standing trees.
Apply a properly labeled herbicide (Triclopyr or equivalent) with an oil carrier and dye at a sufficient rate and across a large enough footprint of bark to kill the standing tree. Herbicide applica�on will follow manufacturer's recommenda�ons.
b) Foliar spray standing trees.
Apply a properly labeled herbicide (Triclopyr or equivalent) at a sufficient rate and across a large enough footprint of foliage to kill the standing tree. Herbicide applica�on will follow manufacturer's recommenda�ons.
c) Stump treat cut trees.
Apply a properly labeled herbicide (Triclopyr or equivalent) with a dye at a sufficient rate and across a large enough footprint of stump to kill the freshly cut stump. Herbicide applica�on will follow manufacturer's recommenda�ons.
2) Standing dead trees will be ground up with a forestry mower/mulcher. Stumps will be taken to ground level with as minimal ground disturbance as feasible.
a) Resul�ng stumpage/chips will be reduced to fragment sizes 6" or less and spread to a depth of 6" or less
b) The contractor is responsible for re-seeding any surface vegeta�on destroyed during the brush control process
3) A spot foliar treatment to kill resprouts and missed trees will be completed the following growing season. A properly labeled herbicide (Triclopyr or equivalent) will be applied at a sufficient rate and at the proper �ming to kill target species. Herbicide applica�on will follow manufacturer's recommenda�ons. Spot treatment, as referred to in this contract, means spraying individual plants with a wand type sprayer.
- Vegeta�on regrowth control shall be considered successfully completed when the regrowth is successfully killed.
4) Prior no�ce for individual landowners is required prior to commencing work and is the contractor's responsibility.
TASKS
Task 1: Prepara�on for Tree & Brush Removal, Stump Treatment and/or Re-growth Control
- Contractor will complete a schedule for the work to be completed and iden�fy which methods will be used to kill and remove woody species. That schedule and plan will be reviewed with NRCS prior to work being ini�ated.
- Work will follow NRCS standards and specifica�ons under Prac�ce Standard 314 - Brush Management (atached).
- A preliminary schedule will be submited to NRCS within 60 days of acceptance of the contract.
Task 2: Applica�on of Tree & Brush Removal
- Tree & brush removal will follow the plan and schedule that was developed in Task 1.
- Contractor will no�fy NRCS at least 2 weeks prior to beginning work.
- Contractor will work to minimize disturbance to non-work areas. Work areas will be iden�fied on the map of the parcel.
- Task 2 will be ini�ated within 10 months of acceptance of contract and is to begin in 2024.
Work will be completed prior to spring 2025.
- Upon comple�on of the ini�al treatment, the effec�veness of the treatment will be assessed and reported to NRCS. Notification is due within 45 days after the work has been completed.
Task 3: Applica�on of Follow-up Foliar Spray
- Follow up foliar spray will follow the plan and schedule that was developed in Task 1 and will occur during the 2025 growing season (May-September).
- Contractor will no�fy NRCS at least 2 weeks prior to beginning work.
- Contractor will work to minimize disturbance to non-work areas. Care will be taken to minimize overspray that would kill non-target species.
- Upon comple�on of the ini�al treatment, the effec�veness of the treatment will be assessed and reported to NRCS. Notification is due within 45 days after the work has been completed.
Contractor’s Responsibility
a. Safety. The contractor shall be cognizant of and comply with all applicable local, State & Federal laws and regula�ons.
b. Liability. The contractor shall assume all liability for any damages resul�ng directly or indirectly from work performed in this contract.
c. Comple�on of a comple�on report for each easement. The Implementa�on Requirements for each easement will be reviewed by NRCS staff to ensure compliance with contract requirements prior to the commencement of work.
d. Obtaining all required permits and authoriza�ons.
e. All landowners will be contacted 2 weeks prior to equipment being moved to the site and work being performed on the easement.
The Contractor shall be responsible for the safety, professional quality and technical accuracy of all work performed and documenta�on submited. The Contractor shall, without addi�onal compensa�on, correct or revise any errors or deficiencies in submitals including drawings, maps, etc.
Deliverables
The Contractor will no�fy NRCS upon commencement and comple�on of work. Contractor will submit a comple�on report that includes (but not limited to): dates of work, equipment used, areas where work was completed, applica�on method, product and rate applied.
Inspec�on and Acceptance of Deliverables
The designated NRCS representa�ve will accept or reject the deliverables in wri�ng. If deliverables are rejected, specific reason(s) for rejec�on will be provided by the designated NRCS representa�ve. The Contactor shall have seven working days to correct and resubmit all rejected deliverables.
# Easement Landowner Phone Acres 1 6663220900W16 Dick Staples 78.7 2 6663220800N00 Danney Erickson 22.3 3 66632211015Z1 Neal Roth 98.4 4 6663221000Y0L Brian Meyer 75.5 5 6663220900W0X Gene Stark 88.1 6 66632211015YG Kevin Shaw 32.8 7 6663220800MSC Rick Paulsen 63 8 6663220400GFN Barry Meyer 128.2 9 6663220800N7V Roger Granberg 273 10 6663220700GPM Duane Taajes 89.6
Total Acres 949.6
Pope County Tree Removal List
Hoff
Nora Reno Leven
Walden Bangor
Langhei Gilchrist
Glenwood
Westport
Barsness
Ben Wade
New Prairie Grove Lake
Blue Mounds
Rolling Forks Lake Johanna
Chippewa Falls
White Bear Lake Minnewaska
Glenwood
Starbuck
Long Beach
Villard
Sedan
Lowry
Cyrus
Farwell
Westport
Brooten
Pope County Tree Removal Project
0 5 102.5 Miles
1 inch = 20,423 feet 1:245,071
2024 Tree Removal Townships Sections
1/9/2024
Assisted By: Jon FriePope County, MN
16663220900W16Nora
16 15
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2019
12/14/2023
Assisted By: Jon FrieN 1/2, SE 1/4 Nora 9, Pope County
120th Street
CountyRoad3
Dick Staples Tree Removal Acres: 78.7
26663220800N00
Langhei
Blue Mounds
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2019
12/14/2023
Assisted By: Jon FrieNW 1/4 Langhei 4, Pope County
280th Street
320thAve
Danney Erickson Tree Removal Acres: 22.3
66632211015Z1
66632211015Z1
6663221301DJ5
Langhei
Rolling Forks
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieS 1/2 Langhei 25, Pope County
330th Street
280thAve Neal Roth Tree Removal Acres: 98.4
46663221000Y0L Barsness
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieNE 1/4 Barsness 16, Pope County
County Road 16/240th Street
250thAve
Brian Meyer Tree Removal Acres: 75.5
6663220900W0X
Barsness
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000
Excluded Area 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieSW 1/4 Barsness 22, Pope County
No Tree Removal
255th Street
250thAve
Gene Stark Tree Removal Acres: 88.1
6663220800MSC
Rolling Forks
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieW 1/2, NW 1/4 Rolling Forks 24, Pope County
310th Street
Rick Paulsen Tree Removal Acres: 63
County Road 19
66632211015YG
66632211015YGBarsness
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieSE 1/4, SE 1/4 Barsness 27, Pope County
270th Street
245thAve
Kevin Shaw
Tree Removal Acres: 32.8
6663220400GFN
Westport
16 15
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 500 feet 1:6,000
Excluded Area 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieNE 1/4 Westport 8, Pope County
No Tree Removal
State Highway 28
Barry Meyer Tree Removal Acres: 128.2
No Tree Removal
6663220800N7V
6663220800N82
6663220800N7Q
6663220800MZX
6663220800MZX6663220800MZX
Chippewa Falls
Bangor
Pope County WRP Tree Removal Project
L 0 500 1,000250 Feet
1 inch = 660 feet 1:7,920
Excluded Area 2024 Tree Removal NRCS_Easements_a_mn Townships Sections
NAIP 2021
12/14/2023
Assisted By: Jon FrieChippewa Falls 13, Pope County
No Tree Removal
250th Street
CountyRoad29
Roger Granberg Tree Removal Acres: 273
Gilchrist 32
6663220700GPM
Pope County WRP Tree Removal Project
0 660 1,320330 Feet
1 inch = 473 feet 1:5,677 2024 Tree Removal Townships Sections NRCS_Easements_a_mn
12/21/2023
Assisted By: Jon Frie Gilchrist 32, Pope County
DuaneTaatjes Tree Removal Acres: 89.6
C o un ty Ro ad
Pope/Swift County Line
MN NRCS WRP VERSION
May 2019
USDA is an equal opportunity provider, employer, and lender.
Producer:
Project or Contract:
Location: County:
Farm Name: Tract Number:
This practice applies to all lands except active cropland where removal, reduction, or manipulation of woody (non-herbaceous or succulent) plants is desired.
Gopher State One Call Utility Services 651-454-0002 or 800-252-1166
Practice Purpose (check all that apply)
Create the desired plant community consistent with the ecological site or a desired state within the . site description.
Restore or release desired vegetative cover to protect soils, control erosion, reduce sediment, improve water quality or enhance hydrology.
Maintain, modify, or enhance fish and wildlife habitat.
Improve forage accessibility, quality, and quantity for livestock and wildlife.
Manage fuel loads to achieve desired results.
Control pervasive plant species to a desired level of treatment that will ultimately contribute to creation
. or maintenance of an ecological site description “steady state,” addressing the need for forage, wildlife habitat and water quality.
Producer’s Goals and Objectives
314 Brush Management Implementation Requirements
Photo by Minnesota Department of Agriculture Glossy Buckthorn-Rhamnus frangula
Photo by USDA-NRCS Japanese Barberry - Berberis thunbergii DC.
Photo by USDA-NRCS (WSI) Gray Alder – Alnus incana (L.)
Moench
Photo by USDA-NRCS (WSI) Multiflora Rose – Rosa multiflora Thunb.
314 – Brush Management Implementation Requirements
MN NRCS Page 2 of 4 USDA is an equal opportunity provider, employer, and lender.
Mechanical Treatment Methods and Plans Not Applicable (Producer is responsible for making sure all equipment is clean and free of invasive seed sources before treatment begins)
Field(s): Acres:
Target species:
Pretreatment density of target plants:
Posttreatment density of target plants:
Types of equipment to be used (mowing, hand clearing, roller chopping, light disking, etc.):
Dates or plant growth stage for effective treatment:
Mechanical Treatment Methods and Plans (continues next page)
Chemical Treatment Methods and Plans Not Applicable
Field(s): Acres:
Target species:
Pretreatment density of target plants:
Posttreatment density of target plants:
Chemical treatment references:
Dates or plant growth stage for effective treatment:
Special mitigation, application techniques, timing consideration for safe and effective applications:
Follow all product label instructions:
WIN-PST or similar evaluation is attached and was discussed with landowner in formulating alternatives. Summarize herbicide risks below.
WRP VERSION
MN NRCS Page 3 of 4 USDA is an equal opportunity provider, employer, and lender.
Mechanical Treatment Methods and Plans (continued from previous page)
Operating instructions (if applicable):
Techniques and procedures to be followed:
Sensitive Features Plan Identify sensitive areas and measures needed to protect them (show locations on plan map):
Operations and Maintenance
Monitor growth of target species using monitoring report or equivalent.
If chemicals are used, the operator will develop a safety plan for individuals exposed to them. This plan includes the telephone numbers and addresses of emergency treatment centers and the phone number for the nearest poison control center.
Mixing and loading setbacks from wells, intermittent streams and rivers, natural or impound ponds and reservoirs follow label instructions.
Signage around treated fields and restricted entry intervals comply with label instructions, and/or Federal, State, Tribal, and local laws.
Disposing of chemicals and chemical containers is done in accordance with label instructions, and/or Federal, State, Tribal, and local laws.
Appropriate herbicide labels and Material Safety Data Sheets (MSDS) will be maintained. These can be accessed on the internet: http://www.greenbook.net.
Application equipment will be calibrated according to recommendations before each seasonal use and with each major chemical and site change.
Application equipment will be properly maintained, including replacing worn nozzle tips, cracked hoses, and faulty gauges.
Maintain plant management and herbicide application records for at least 2 years and in accordance with USDA Agricultural Marketing Service’s Pesticide Recordkeeping Program and State-specific requirements.
MN NRCS Page 4 of 4 USDA is an equal opportunity provider, employer, and lender.
Provided Practice Cost information
Site-specific cost estimate, or specifications for the producer to develop a cost estimate or obtain the bid themselves.
Design Installation and Layout Approval
Designed by:__________________________________ Date:____________________
Job Approval Authority:_______________________
Approved by:_________________________________ Date:____________________
Job Approval Authority:_______________________
Record of Completion and Check Out Certification
Management Unit Treated Acres Date Completed by Client Date Certified Approver’s Initials
Additional documentation to support practice certification is in the Case File.
Certification Statement I certify that implementation of this conservation practice is complete, meets criteria for the stated purpose(s), and meets the NRCS conservation practice standard and specifications.
Printed Name:________________________________ Date:____________________
Title:________________________________________ Job Approval Authority:________________________
Signature:____________________________________
Practice Specifications Approval and Completion Certification
United States Department of Agriculture -CPS-1314
NRCS, MN
April 2019
NRCS reviews and periodically updates conservation practice standards. To obtain the current version of this standard, contact your Natural Resources Conservation Service State office or visit the Field Office Technical Guide online by going to the NRCS website at https://www.nrcs.usda.gov/ and type FOTG in the search field.
USDA is an equal opportunity provider, employer, and lender.
Natural Resources Conservation Service
CONSERVATION PRACTICE STANDARD
BRUSH MANAGEMENT
CODE 314
(ac)
DEFINITION
The management or removal of woody (nonherbaceous or succulent) plants including those that are invasive and noxious.
PURPOSE
This practice is used to accomplish one or more of the following purposes:
Create the desired plant community consistent with the ecological site or a desired state within the • site description
Restore or release desired vegetative cover to protect soils, control erosion, reduce sediment, • improve water quality, or enhance hydrology
Maintain, modify, or enhance fish and wildlife habitat •
Improve forage accessibility, quality, and quantity for livestock and wildlife •
Manage fuel loads to achieve desired conditions •
Pervasive plant species are controlled to a desired level of treatment that will ultimately contribute • to creation or maintenance of an ecological site description “steady state” addressing the need for forage, wildlife habitat, and/or water quality
CONDITIONS WHERE PRACTICE APPLIES
On all lands except active cropland where the removal, reduction, or manipulation of woody
(nonherbaceous or succulent) plants is desired.
This practice does not apply to removal of woody vegetation by prescribed fire (use Conservation Practice
Standard (CPS) Prescribed Burning (Code 338)) or removal of woody vegetation to facilitate a land-use change (use CPS Land Clearing (Code 460)).
CRITERIA
General Criteria Applicable to All Purposes
Brush management will be designed to achieve the desired plant community based on species composition, structure, density, and canopy (or foliar) cover or height.
Brush management will be applied in a manner to achieve the desired control of the target woody species and protection of desired species. This will be accomplished by mechanical, chemical, burning, or biological methods, either alone or in combination. When prescribed burning is used as a method, CPS
Prescribed Burning (Code 338) will also be applied.
When the intent is to manage trees for silvicultural purposes, use CPS Forest Stand Improvement (Code
666).
NRCS will not develop biological or chemical treatment recommendations except for biological control utilizing grazing animals. In such cases, CPS Prescribed Grazing (Code 528) is used to ensure desired results are achieved and maintained. NRCS may provide clients with acceptable biological and/or chemical control references.
In cases where there is insufficient understory vegetation to provide a seed source to result in the desired plant community, use CPS Range Planting (Code 550) or CPS Forage and Biomass Planting (Code 512) to ensure the desired results are achieved and maintained.
Follow-up treatments may be necessary to achieve objectives.
Additional Criteria for Creating the Desired Plant Community Consistent with the Ecological Site
Use applicable ecological site description (ESD) state and transition models to develop specifications that are ecologically sound and defensible. Treatments must be congruent with dynamics of the ecological site(s) and keyed to state and plant community phases that have the potential and capability to support the desired plant community. If an ESD is not available, base specifications on the best approximation of the desired plant community composition, structure, and function to support resilience.
Additional treatments are planned and will be applied to achieve effective control of pervasive plant species through reapplication.
Additional Criteria for Restoring or Releasing Desired Vegetative Cover to Protect Soils, Control
Erosion, Reduce Sediment, Improve Water Quality or Enhance Hydrology
Choose a method of control that results in the least amount of soil disturbance if soil erosion potential is high and revegetation is slow or uncertain leaving the site vulnerable to long-term exposure to soil loss.
In conjunction with other conservation practices, the number, sequence, and timing of soil-disturbing operations must be managed to maintain soil loss within acceptable levels using the most current approved erosion prediction technology.
When a chosen alternative has significant potential to negatively impact important water resources (for example WIN-PST “Extra High,” “High” or “Intermediate” soil / pesticide human risk ratings). See
Considerations below: CPS 595 Integrated Pest Management.
Clients shall be encouraged to pay special attention to pesticide label instructions for limiting pesticide residues in soil that may negatively impact non-target plants, animals and humans.
Additional Criteria to Maintain, Modify or Enhance Fish and Wildlife Habitat
Brush management will be planned and applied in a manner to meet the habitat requirements for wildlife species of concern as determined by an approved habitat evaluation procedure.
Conduct treatments during periods of the year that accommodate reproduction and other life-cycle requirements of target wildlife and pollinator species, and in accordance with specifications developed for
CPS Wetland Wildlife Habitat Management (Code 644) and CPS Upland Wildlife Habitat Management
(Code 645).
Additional Criteria to Improve Forage Accessibility, Quality and Quantity ro Livestock and Wildlife
Timing and sequence of brush management must be planned in coordination with specifications developed for CPS Prescribed Grazing (Code 528).
Additional Criteria for Control of Pervasive Plant Species to a Desired Level of Treatment That Will
Ultimately Contribute to Creation or Maintenance of an Ecological Site Description “Steady State”
Addressing the Need for Forage, Wildlife Habitat, and/or Water Quality
Additional treatments are planned and will be applied to achieve effective control of pervasive plant species through reapplication.
-CPS-2
NRCS, MN
April 2019
Additional Criteria to Manage Fuel Loads to Achieve Desired Conditions
Control undesirable woody plants in a manner that creates the desired plant community, including the desired fuel load, to reduce the risk of wildfire, and facilitate the future application of prescribed fire.
CONSIDERATIONS
Consider using CPS Integrated Pest Management (Code 595) in support of brush management.
Consider the appropriate time period for treatment. Some brush management activities can be effective when applied within a single year; others may require multiple years of treatment(s) to achieve desired objectives.
Consider impacts and consequences to obligate species (species dependent on the target woody species) when significant changes are planned to existing and adjacent plant communities.
Consider impacts to wildlife food supplies, space, nesting, and cover availability when planning the method and amount of brush management.
State-issued licenses may be required when using chemical pesticide treatments.
For air quality purposes, consider using chemical methods of brush management that minimize chemical drift and excessive chemical usage, and consider mechanical methods of brush management that minimize the entrainment of particulate matter.
PLANS AND SPECIFICATIONS
Plans and specifications for the treatment option(s) selected by the decisionmaker will be recorded for each field or management unit where brush management will be applied.
Prepare brush management plans and specifications that conform to all applicable Federal, State, and local laws. These documents will contain the following data as a minimum:
Goals and objectives clearly stated.1.
Pretreatment cover or density of the target plant(s) and the planned post-treatment cover or density2.
and desired efficacy.
Maps, drawings, and/or narratives detailing or identifying areas to be treated, pattern of treatment (if3.
applicable), and areas that will not be disturbed.
A monitoring plan that identifies what should be measured (including timing and frequency) and that4.
documents the changes in the plant community (compare with objectives) will be implemented.
Mechanical Treatment Methods
Plans and specifications will include items 1 through 4, above, plus—
Types of equipment and any modifications necessary to enable the equipment to adequately• complete the job.
Dates of treatment to best effect control.•
Operating instructions (if applicable).•
Techniques or procedures to be followed.•
Chemical Treatment Methods
Plans and specifications will include items 1 through 4, above, plus—
Acceptable chemical treatment references for containment and management or control of target• species.
-CPS-3
NRCS, MN
Evaluation and interpretation of herbicide risks associated with the selected treatment(s).•
Acceptable dates or plant growth stage at application to best effect control and reduce reinvasion.•
Any special mitigation, timing considerations or other factors (such as soil texture and organic• matter content) that must be considered to ensure the safest, most effective application of the herbicide.
Reference to product label instructions.•
Biological Treatment Methods
Plans and specifications will include items 1 through 4, above, plus—
Acceptable biological treatment references for containment and management or control of target• species.
Kind of grazing animal to be used, if applicable.•
Timing, frequency, duration, and intensity of grazing or browsing.•
Desired degree of grazing or browsing use for effective control of target species.•
Maximum allowable degree of use on desirable nontarget species.•
Special mitigation, precautions, or requirements associated with the selected treatment(s).•
OPERATION AND MAINTENANCE
Operation
Brush management practices must be applied using approved materials and procedures. Operations will comply with all local, State, and Federal laws and ordinances.
Success of the practice shall be determined by evaluating post-treatment regrowth of target species after sufficient time has passed to monitor the situation and gather reliable data. Length of evaluation periods will depend on the woody species being monitored, proximity of propagules (seeds, branches, and roots) to the site, transport mode of seeds (wind or animals), and methods and materials used.
The operator will develop a safety plan for individuals exposed to chemicals, including telephone numbers and addresses of emergency treatment centers and the telephone number for the nearest poison control center. The National Pesticide Information Center (NPIC) telephone number in Corvallis, Oregon, may also be given for nonemergency information: 1-800-858-7384, Monday to Friday, 6:30 a.m. to 4:30 p.m.
Pacific Time. The national Chemical Transportation Emergency Center (CHEMTRAC) telephone number is 1-800-424-9300.
Follow label requirements for mixing/loading setbacks from wells, intermittent streams and rivers,• natural or impounded ponds and lakes, and reservoirs.
Post signs, according to label directions and/or Federal, State, Tribal, and local laws, around fields• that have been treated. Follow restricted entry intervals.
Dispose of herbicides and herbicide containers in accordance with label directions and adhere to•
Federal, State, Tribal,and local regulations.
Read and follow label directions and maintain appropriate Material Safety Data Sheets (MSDS).•
MSDS and pesticide labels may be accessed on the Internet at: http://www.greenbook.net/.
Calibrate application equipment according to recommendations before each seasonal use and with• each major chemical and site change.
Replace worn nozzle tips, cracked hoses, and faulty gauges on spray equipment.•
Maintain records of brush/shrub control for at least 2 years. Herbicide application records shall be• in accordance with USDA Agricultural Marketing Service’s Pesticide Recordkeeping Program and
State-specific requirements.
-CPS-4
NRCS, MN
Maintenance
Following initial application, some regrowth, resprouting, or reoccurrence of brush may be expected. Spot treatment of individual plants or areas needing retreatment should be completed as needed while woody vegetation is small and most vulnerable to desired treatment procedures.
Review and update the plan periodically in order to—
Incorporate new integrated pest management technology. •
Respond to grazing management and complex plant population changes. •
Avoid the development of plant resistance to herbicide chemicals. •
REFERENCES
Branson, F.A., G.F. Gifford, K.G. Renard, R.F Hadley, and E.H. Reid, ed. 1981. Rangeland Hydrology, 2nd ed., Society for Range Management, Colorado.
Heady, H.F. and D. Child, 1994. Rangeland Ecology and Management, Westview Press, Colorado.
Holechek, J.L., R.D. Pieper and C.H. Herbel. 2000. Range management principles and practices, 5th edition. Prentice Hall, New Jersey.
Krausman, P.R., ed. 1996. Rangeland Wildlife. Society for Range Management, Colorado.
Monsen, S.B., R. Stevens, and N.L. Shaw, comps. 2004. Restoring Western Ranges and Wildlands, Volume 1. Gen. Tech. Rep. RMRS-GTR-136-1, USDA, Forest Service, Fort Collins, Colorado.
United States Department of Agriculture, Natural Resources Conservation Service. 2003. National Range and Pasture Handbook. Washington, DC.
United States Department of Agriculture, Natural Resources Conservation Service. 2008. General Manual:
Title 190 – Ecological Sciences: Part 404 – Pest Management. Washington, DC.
Valentine, J.R., 1989. Range Developments and Improvements, 3rd ed. Academic Press, Massachusetts.
Vavra, M., W.A. Laycock, R.D. Pieper, eds. 1994. Ecological Implications of Livestock Herbivory in the
West. Society for Range Management, Colorado.
Briske, D.D. [ed]. 2011. Conservation Benefits of Rangeland Practices: Assessment, Recommendations, and Knowledge Gaps. U.S. Department of Agriculture, Natural Resources Conservation Service. 429 pages.
-CPS-5
NRCS, MN
| Tree Removal Maps.pdf |
| Map 1 - Staples |
| Map 2 - Erickson |
| Map 3 - Roth |
| Map 4 - Brian Meyer |
| Map 5 - Stark |
| Map 6 - Paulsen |
| Map 7 - Shaw |
| Map 8 - Barry Meyer |
| Map 9 - Granberg |
| Producer: |
| Contract: |
| Location: |
| County: |
| Farm Name: |
| Tract Number: |
| Create the desired plant community consistent with the ecological site or a desired state within the: Off |
| Restore or release desired vegetative cover to protect soils control erosion reduce sediment improve: On |
| Maintain modify or enhance fish and wildlife habitat: Off |
| Improve forage accessibility quality and quantity for livestock and wildlife: On |
| Manage fuel loads to achieve desired results: Off |
| Control pervasive plant species to a desired level of treatment that will ultimately contribute to creation: On |
| Text1: Manage woody vegetation to control invasive species & for the benefit of wildlife habitat. |
| undefined_3: Off |
| Fields: |
| Acres: |
| Target species_2: Undesirable woody species such as Russian Olive, Buckthorn, Boxelder, Cottonwood, Siberian Elm, Eastern Red Cedar, etc. |
| Pretreatment density of target plants_2: Scattered across the easement. |
| Posttreatment density of target plants_2: Elimination of all trees larger than 1" DBH. |
| Chemical treatment references: All herbicides used should follow label recommendations. |
Chemical used should by Triclopyr or equivalent.
| Dates or plant growth stage for effective treatment: Foliar application can be treated at anytime during the growing season, with best results in late summer. Basal treatment can occur year round. |
| Special mitigation application techniques timing consideration for safe and effective applications: Spot treatment only is to be used on WRP easements to protect other broadleaved plants on easement. Spot treatment refers to spraying individual plants with a wand type sprayer. |
| Follow all product label instructions: |
| Producer is responsible for making sure all equipment is clean and free of invasive seed sources before treatment begins: Off |
| Fields_2: |
| Acres_2: |
| Target species_3: Undesirable woody species such as Russian Olive, Buckthorn, Boxelder, Cottonwood, Siberian Elm, Eastern Red Cedar, etc. |
| Pretreatment density of target plants_3: Scattered across the easement. |
| Posttreatment density of target plants_3: Elimination of all trees larger than 1" DBH. |
| Types of equipment to be used mowing hand clearing roller chopping light disking etc: Woody vegetation will be cut /chipped using a forestry mower of equivalent that shreds the existing tree. |
| Dates or plant growth stage for effective treatment_2: Species can be cut at anytime. Chemical should be applied to freshly cut stump within 24 hours. |
| Check Box5: Off |
| Text6: |
| Operating instructions if applicable: |
| Techniques and procedures to be followed: |
| Monitor growth of target species using monitoring report or equivalent: On |
| If chemicals are used the operator will develop a safety plan for individuals exposed to them This plan: On |
| Mixing and loading setbacks from wells intermittent streams and rivers natural or impound ponds and: On |
| Signage around treated fields and restricted entry intervals comply with label instructions andor Federal: On |
| Disposing of chemicals and chemical containers is done in accordance with label instructions andor: On |
| Appropriate herbicide labels and Material Safety Data Sheets MSDS will be maintained These can: On |
| Application equipment will be calibrated according to recommendations before each seasonal use and: On |
| Application equipment will be properly maintained including replacing worn nozzle tips cracked hoses: On |
| Maintain plant management and herbicide application records for at least 2 years and in accordance with: On |
| Text7: Cut stumps as close to the ground surface as possible. Chips should be less than 6" on average following chipping operation, with the depth of chips not to exceed 6". |
Care should be taken to not destroy prairie vegetation or to rut up easement. Contractor is responsible to repair damage caused at it's own expense.
| Text8: |
| Text9: |
| Sitespecific cost estimate or specifications for the producer to develop a cost estimate or obtain the bid: Off |
| Designed by: J. Frie |
| Date: 12/31/23 |
| Job Approval Authority: |
| Approved by: |
| Date_2: |
| Job Approval Authority_2: |
| Management UnitRow1: |
| Treated AcresRow1: |
| Date Completed by ClientRow1: |
| Date CertifiedRow1: |
| Approvers InitialsRow1: |
| Management UnitRow2: |
| Treated AcresRow2: |
| Date Completed by ClientRow2: |
| Date CertifiedRow2: |
| Approvers InitialsRow2: |
| Management UnitRow3: |
| Treated AcresRow3: |
| Date Completed by ClientRow3: |
| Date CertifiedRow3: |
| Approvers InitialsRow3: |
| Management UnitRow4: |
| Treated AcresRow4: |
| Date Completed by ClientRow4: |
| Date CertifiedRow4: |
| Approvers InitialsRow4: |
| Additional documentation to support practice certification is in the Case File: Off |
| Printed Name: |
| Date_3: |
| Title: |
| Job Approval Authority_3: |
| Text12: |
File details come from the government source that posted it. Updated .