The file's text, extracted by GovTribe without its formatting.
Region 3 Southwestern Region Hazard Tree Removal and Pruning IDIQ Contract
Schedule of Items: November 1, 2024 – October 31, 2025
| Item No. |
| Description |
| Method of Measure |
| Apache-Sitgreaves |
| Carson |
| Cibola |
| Coconino |
| Coronado |
| Gila |
| Kaibab |
| Lincoln |
| Prescott |
| Santa Fe |
| Tonto |
| B.1.1 |
| Fell, delimb, and buck hazard trees >18 inches DBH |
| Tree |
| B.1.2 |
| Fell, delimb, and buck hazard trees 9-17.9 inches DBH |
| Tree |
| B.1.3 |
| Fell, delimb, and buck hazard trees < 9 inches DBH |
| Tree |
| B.1.4 |
| Haul all tree boles and slash to designated disposal area < 5 miles from origin. |
| Tree |
| B.1.5 |
| Haul all tree boles and slash to designated disposal area 5 - 10 miles from origin. |
| Tree |
| B.1.6 |
| Haul all tree boles and slash to designated disposal area 10.1 - 20 miles from origin. |
| Tree |
| B.1.7 |
| On-site chipping by contractor of tree boles and slash generated by tree removal. |
| Tree |
| B.1.8 |
| Hand or machine piling of tree boles and slash |
| Tree |
| B.1.9 |
| Stacking of tree boles and removal of slash from recreation site |
| Tree |
| B.1.10 |
| Pruning of hazardous branches >50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
| B.1.11 |
| Pruning of hazardous branches < 50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
Schedule of Items: November 1, 2025 – October 31, 2026
| Item No. |
| Description |
| Method of Measure |
| Apache-Sitgreaves |
| Carson |
| Cibola |
| Coconino |
| Coronado |
| Gila |
| Kaibab |
| Lincoln |
| Prescott |
| Santa Fe |
| Tonto |
| B.1.1 |
| Fell, delimb, and buck hazard trees >18 inches DBH |
| Tree |
| B.1.2 |
| Fell, delimb, and buck hazard trees 9-17.9 inches DBH |
| Tree |
| B.1.3 |
| Fell, delimb, and buck hazard trees < 9 inches DBH |
| Tree |
| B.1.4 |
| Haul all tree boles and slash to designated disposal area < 5 miles from origin. |
| Tree |
| B.1.5 |
| Haul all tree boles and slash to designated disposal area 5 - 10 miles from origin. |
| Tree |
| B.1.6 |
| Haul all tree boles and slash to designated disposal area 10.1 - 20 miles from origin. |
| Tree |
| B.1.7 |
| On-site chipping by contractor of tree boles and slash generated by tree removal. |
| Tree |
| B.1.8 |
| Hand or machine piling of tree boles and slash |
| Tree |
| B.1.9 |
| Stacking of tree boles and removal of slash from recreation site |
| Tree |
| B.1.10 |
| Pruning of hazardous branches >50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
| B.1.11 |
| Pruning of hazardous branches < 50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
Schedule of Items: November 1, 2026 – October 31, 2027
| Item No. |
| Description |
| Method of Measure |
| Apache-Sitgreaves |
| Carson |
| Cibola |
| Coconino |
| Coronado |
| Gila |
| Kaibab |
| Lincoln |
| Prescott |
| Santa Fe |
| Tonto |
| B.1.1 |
| Fell, delimb, and buck hazard trees >18 inches DBH |
| Tree |
| B.1.2 |
| Fell, delimb, and buck hazard trees 9-17.9 inches DBH |
| Tree |
| B.1.3 |
| Fell, delimb, and buck hazard trees < 9 inches DBH |
| Tree |
| B.1.4 |
| Haul all tree boles and slash to designated disposal area < 5 miles from origin. |
| Tree |
| B.1.5 |
| Haul all tree boles and slash to designated disposal area 5 - 10 miles from origin. |
| Tree |
| B.1.6 |
| Haul all tree boles and slash to designated disposal area 10.1 - 20 miles from origin. |
| Tree |
| B.1.7 |
| On-site chipping by contractor of tree boles and slash generated by tree removal. |
| Tree |
| B.1.8 |
| Hand or machine piling of tree boles and slash |
| Tree |
| B.1.9 |
| Stacking of tree boles and removal of slash from recreation site |
| Tree |
| B.1.10 |
| Pruning of hazardous branches >50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
| B.1.11 |
| Pruning of hazardous branches < 50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
Schedule of Items: November 1, 2027 – October 31, 2028
| Item No. |
| Description |
| Method of Measure |
| Apache-Sitgreaves |
| Carson |
| Cibola |
| Coconino |
| Coronado |
| Gila |
| Kaibab |
| Lincoln |
| Prescott |
| Santa Fe |
| Tonto |
| B.1.1 |
| Fell, delimb, and buck hazard trees >18 inches DBH |
| Tree |
| B.1.2 |
| Fell, delimb, and buck hazard trees 9-17.9 inches DBH |
| Tree |
| B.1.3 |
| Fell, delimb, and buck hazard trees < 9 inches DBH |
| Tree |
| B.1.4 |
| Haul all tree boles and slash to designated disposal area < 5 miles from origin. |
| Tree |
| B.1.5 |
| Haul all tree boles and slash to designated disposal area 5 - 10 miles from origin. |
| Tree |
| B.1.6 |
| Haul all tree boles and slash to designated disposal area 10.1 - 20 miles from origin. |
| Tree |
| B.1.7 |
| On-site chipping by contractor of tree boles and slash generated by tree removal. |
| Tree |
| B.1.8 |
| Hand or machine piling of tree boles and slash |
| Tree |
| B.1.9 |
| Stacking of tree boles and removal of slash from recreation site |
| Tree |
| B.1.10 |
| Pruning of hazardous branches >50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
| B.1.11 |
| Pruning of hazardous branches < 50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
Schedule of Items: November 1, 2028 – October 31, 2029
| Item No. |
| Description |
| Method of Measure |
| Apache-Sitgreaves |
| Carson |
| Cibola |
| Coconino |
| Coronado |
| Gila |
| Kaibab |
| Lincoln |
| Prescott |
| Santa Fe |
| Tonto |
| B.1.1 |
| Fell, delimb, and buck hazard trees >18 inches DBH |
| Tree |
| B.1.2 |
| Fell, delimb, and buck hazard trees 9-17.9 inches DBH |
| Tree |
| B.1.3 |
| Fell, delimb, and buck hazard trees < 9 inches DBH |
| Tree |
| B.1.4 |
| Haul all tree boles and slash to designated disposal area < 5 miles from origin. |
| Tree |
| B.1.5 |
| Haul all tree boles and slash to designated disposal area 5 - 10 miles from origin. |
| Tree |
| B.1.6 |
| Haul all tree boles and slash to designated disposal area 10.1 - 20 miles from origin. |
| Tree |
| B.1.7 |
| On-site chipping by contractor of tree boles and slash generated by tree removal. |
| Tree |
| B.1.8 |
| Hand or machine piling of tree boles and slash |
| Tree |
| B.1.9 |
| Stacking of tree boles and removal of slash from recreation site |
| Tree |
| B.1.10 |
| Pruning of hazardous branches >50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
| B.1.11 |
| Pruning of hazardous branches < 50 feet from the ground. Removal of branch material from recreation site. |
| Tree |
NOTES:
1. Directional falling will be required; this may require some rigging or other measures to ensure tree falls where needed.
2. Bucking lengths of the bole will be to contract specifications as described in individual task orders.
3. Designated disposal areas will be described in individual task orders.
4. Hazardous branches may include dead or dying branches or branches that are infected with dwarf mistletoe.
THE CONTRACT WILL CONTAIN TECHNICAL SPECIFICATIONS AND A PERIOD OF PERFORMANCE COMMENSURATE WITH WORKLOAD CONTAINED THEREIN.
SEE SECTION E FOR SUBMISSION REQUIREMENTS FOR EVALUATION PURPOSES.
CONTRACTOR WILL BE SUPPLIED MAPS OF PROJECT LOCATION. ALL DESIGNATED TREES FOR REMOVAL OR PRUNING ARE PAINTED OR FLAGGED.
Signature: ________________________________ Date: _____________