Attachment 9 Project 1 Plans_For_Reference.pdf
PDF 1 MB Posted
- Attached to
- Electrical Upgrades: PROJECT II – Internal Building Transformers and Disconnects (Kimberly, ID)
- Solicitation number
- 12905B25R0001
About this file
This is a set of construction drawings and plans detailing an electrical upgrade project at the USDA Agricultural Research Service facility in Kimberly, Idaho. The drawings outline Project I, which involves the replacement of an outdoor electrical panel and building feeders at the Northwest Irrigation & Soils Research Laboratory.
The plans include a site plan, electrical single-line diagrams, cable schedules, and concrete pad design details for a new 800A NEMA 3R rated outdoor pad-mounted switchboard (480/277V, 4W, 3P, 50 KAIC). Key components include installation of new concrete pads, outdoor switchboard, branch feeder cables to individual buildings, and surface-mounted wire troughs between the transformer and new panel. The drawings specify a detailed 13-step construction sequence involving coordination with utility companies for power shutdown, cable replacement, and building-by-building feeder upgrades. The design includes provisions for connecting to an existing 300KVA transformer and maintaining service to multiple facility buildings including the Main Building, Head House, Vehicle Storage, and Irrigation Lab.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REAL PROPERTY
USDA
SAFETY & HEALTH
AREA ENGINEER
DRAWN BY
CHECKED BY
DESIGNER
PROJECT MANAGER
EPM
PROJECT NO.
DATE
REV. DATE BY
SHEET
DESCRIPTION
Service Research Agricultural
USDA AGRICULTURAL RESEARCH
SERVICE
ELECTRICAL UPGRADE
3793 E 3600 N, KIMBERLY, ID
83341, USA
USDA AGRICULTURAL RESEARCH SERVICE
PROJECT I: REPLACEMENT OF OUTDOOR PANEL AND BUILDING FEEDERS
U S D A
OF
SEAL
312023-11-20
1555-00
D.YASSINE
J.GLEUSNER
S.RASTKAR
B.SANTANA
E-000
SR2023-11-20 100% FOR CONSTRUCTION-REV.3C
PROJECT COVER PAGE
B 2023-11-17 SR 100% FOR CONSTRUCTION-REV.2
A 2023-10-31 SR 100% FOR CONSTRUCTION-REV.1
DRAWING LIST
E-000 PROJECT COVER PAGE
E-001 ELECTRICAL SINGLE LINE DIAGRAMS AND SITE PLAN
E-002 CABLE SCHEDULE AND PAD DETAIL
S-001 ELECTRICAL CONCRETE PAD DESIGN
PROJECT I: REPLACEMENT OF OUTDOOR PANEL AND BUILDING FEEDERS
N 3800 E
N
E
ID-50
W . F
LS
A
VE
E
85.7710"MAIN BUILDING (B1)
HEAD HOUSE (B2)
IRRIGATION LAB (B3)VEHICLE STORAGE (B4)
SHOP REPAIR AND SERVICES (B5)
STORAGE BARN (B6)
USDA-ARS NORTHWEST IRRIGATION & SOILS RESEARCH LAB
3793 EAST 3600 NORTH KIMBERLY, ID 83341-5076
20 Nov, 2023
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
SHOP REPAIR AND SERVICES (B5) VEHICLE STORAGE (B4) IRRIGATION LAB (B3)
STORAGE BARN (B6)
MAIN BUILDING (B1)
NEW GREENHOUSE
HEADHOUSE (B2)
OLD GREENHOUSE ANNEX
E E
E E
E E
E
NEW PAD LOCATION
FEEDER 7
(x2) 3'' CONDUIT
FEEDER 1
(x3) 3.5'' CONDUIT
FEEDER 6 + FEEDER 7
(x4) 3.5'' CONDUIT
FEEDER 10
(x1) 2'' CONDUIT
(x1) 1.5'' CONDUIT
FEEDER 6
(x2) 3.5'' CONDUIT
FEEDER 3
(x2) 3'' CONDUIT(x1) 2'' CONDUIT
FUTURE EXPANSION
(x2) 3.5'' CONDUIT
(x2) 3.5'' CONDUIT
EXISTING
300KVA TRANSFORMER
EXISTING ALUMINUM CABLE
3#2 AWG +#6GD-4C
BURIED CONDUIT
UTILITY POLE
800A
NEW NEMA 3R RATED OUTDOOR PAD
MOUNTED SWITCHBOARD
800A, 480/277V, 4W, 3P, 50 KAIC
2[4x500MCM]
COPPER CABLE RUN THROUGH SURFACE
MOUNTED WIREWAY
200A
SPARE
200A
SPARE
600A
MAIN
BUILDING
200A
HEADHOUSE AND
NEW GREENHOUSE
100A
SPARE
200A
MAIN
BUILDING
HVAC
200A 200A
IRRIGATION
LAB
100A
OLD GREENHOUSE
AND ANNEX
3 10765
12470/7200V
480/277V
LSI LSI LSI LSI LSI LSI LSILSI
M
LSI
NEW POWER METER
NEW SINGLE LINE DIAGRAM
EXISTING
300KVA TRANSFORMER
EXISTING ALUMINUM CABLE
3#2 AWG +#6GD-4C
BURIED CONDUIT
UTILITY POLE
800A
NEW NEMA 3R RATED OUTDOOR PAD
MOUNTED SWITCHBOARD
800A, 480/277V, 4W, 3P, 50 KAIC
2(4x500MCM)
200A
SPARE
200A
SPARE
600A
MAIN
BUILDING
200A
HEADHOUSE AND
NEW GREENHOUSE
100A
SPARE
200A
MAIN
BUILDING
HVAC
200A
VEHICLE
STORAGE
200A
IRRIGATION
LAB
100A
OLD GREENHOUSE
AND ANNEX
3 10765
12470/7200V
480/277V
LSI LSI LSI LSI LSI LSI LSILSI LSI
DEMOLITION SINGLE LINE DIAGRAM
M ENERGY METER
M EXISTING REVENUE METER TO
REMAIN
M EXISTING REVENUE METER TO
REMAIN
GROUND BAR
SHOP REPAIR
AND SERVICESSTORAGE
BARN
VEHICLE
STORAGE
SHOP REPAIR
AND SERVICES
STORAGE
BARN
HEADHOUSE
GROUND BAR
500MCM
3/0 AWG
SINGLE LINE - GENERAL NOTES
1.
A.
B.
C.
D.
CONTRACTOR TO PROVIDE THE FOLLOWING
SECONDARY CABLE.
PAD FOR OUTDOOR SWITCHBOARD.
OUTDOOR SWITCHBOARD.
BRANCH FEEDER CABLES TO INDIVIDUAL BUILDING.
# FEEDER TAG # - PLEASE REFER TO USDA KIMBERLY
BREAKER LIST ON SHEET E2
M EXISTING REVENUE METERING
EXISTING CT ASSOCIATED WITH REVENUE METERING
EXISTING UTILITY PAD MOUNTED TRANSFORMER
EXISTING UTILITY POLE
100A 3P
NEW LSI PANEL BREAKERS
ELECTRICAL SYMBOLS LEGEND
CONTRACTOR SCOPE, NEW EQUIPMENT, CABLE, BURIED
CONDUIT, OUTDOOR PAD. OWNERSHIP IS BY THE CLIENT
EXISTING BUILDING FEEDER CABLES OR CONDUIT TO
REMAIN
IDAHO POWER CABLE - EXISTING TO REMAIN
SURFACE MOUNT NEMA 4X WIRE TROUGH.
BONDING CABLE RUNNING BETWEEN THE OUTDOOR
PANEL AND THE TRANSFORMER.
E.
CONTRACTOR SCOPE, EQUIPMENT TO BE REMOVED OR
DEMOLISHED
KEYNOTES
1. NEW 2'' UNDERGROUND PVC CONDUIT SHALL BE INSTALLED.
CONDUIT SHALL STUB UP THROUGH THE SLAB OF BOTH
BUILDINGS AND SEALED AFTER CABLES ARE PULLED. REFER
TO INTERIOR DRAWING SET FOR FURTHER INFORMATION.
2. HV UNDERGROUND CONDUIT OWNED BY IDAHO POWER AND
NOT BEING AFFECTED BY THE PROJECT SCOPE.
LSI PANEL BREAKERS TO BE REMOVED
100A
3P
EXISTING BUILDING FEEDER CABLES TO BE
SPLICED AND TEMPORARILY TERMINATED TO
THE NEW BREAKER PANEL.
2.
E 4'X4'X6' (WXLXD) ELECTRICAL MANHOLE
Scale: 3/16'':1'
ELECTRICAL SITE PLAN1
F.
FUTURE EXPANSION SCOPE
REAL PROPERTY
USDA
SAFETY & HEALTH
AREA ENGINEER
DRAWN BY
CHECKED BY
DESIGNER
PROJECT MANAGER
EPM
PROJECT NO.
DATE
REV. DATE BY
SHEET
DESCRIPTION
Service Research Agricultural
USDA AGRICULTURAL RESEARCH
SERVICE
ELECTRICAL UPGRADE
3793 E 3600 N, KIMBERLY, ID
83341, USA
USDA AGRICULTURAL RESEARCH SERVICE
PROJECT I: REPLACEMENT OF OUTDOOR PANEL AND BUILDING FEEDERS
U S D A
OF
SEAL
322023-11-20
1555-00
D.YASSINE
J.GLEUSNER
S.RASTKAR
B.SANTANA
E-001
SR2023-11-20 100% FOR CONSTRUCTION-REV.3C
ELECTRICAL SINGLE LINE
DIAGRAMS AND SITE PLAN
B 2023-11-17 SR 100% FOR CONSTRUCTION-REV.2
A 2023-10-31 SR 100% FOR CONSTRUCTION-REV.1
NEW CONCRETE PAD
(REFER TO CONCRETE PAD DETAIL ON SHEET S1)
STAINLESS STEEL
NEMA 3R WIRE TROUGH
OUTDOOR RATED SWITCH BOARD
FRONT FACE OF THE SWITCHBOARD
4'-5'' 3'
1'-1''
0'-6''
0'-5''
6'
1'-6''4'-6''
3'
EX. TRANSFORMER EX. METERING CABINET EX. SWITCHBOARD
CONCRETE PAD CABLE ENTRY
SEQUENCE OF CONSTRUCTION
1. INSTALL NEW CONCRETE PAD AS SHOWN. REFER TO STRUCTURE
DRAWING FOR FURTHER DETAILS.
2. CONNECT TWO CABLE TROUGH COMPONENTS BETWEEN THE
TRANSFORMER/BREAKER CABINET AND THE NEW HOUSE KEEPING
PAD.
3. COORDINATE DURATION AND SCHEDULE 48 HOURS SHUT-DOWN
OVER THE WEEKEND AND COORDINATE WITH THE UTILITY
COMPANY TO CUT THE POWER TO THE SITE.
4. DECOMMISSION AND REMOVE ALL THE BREAKERS AND
ELECTRICAL COMPONENTS LOCATED IN THE BREAKER
COMPARTMENT OF THE TRANSFORMER/BREAKER CABINET.
(REVENUE METER MOUNTED ON THE EXTERIOR OF THE
COMPARTMENT SHALL REMAIN ACTIVE).
5. REMOVE AND DECOMMISSION THE ENERGY METER LOCATED ON
THE FRAME OF THE CABINET.
6. DISCONNECT THE MAIN FEEDER AND BRANCH FEEDERS AND
ROUTE ALL CABLES TOWARDS THE NEW HOUSE KEEPING PAD.
SPLICE AND EXTEND THE CABLES IF REQUIRED TO REACH THE
NEW BREAKER LOCATION AT THE BOTTOM ENTRY TO THE NEW
PANEL.
7. TRANSFORMER SECONDARY FEEDER AND ALL FEEDER CABLES
SHALL BE ROUTED THROUGH BOTH WIREWAYS.
8. INSTALL THE SWITCHBOARD.
9. TERMINATE THE CABLES TO THE NEW BREAKER PANEL AND
ADJUST THE TRIP SETTINGS AS IDENTIFIED IN THE DRAWING SET.
10. COORDINATE WITH THE UTILITY COMPANY TO ENERGIZE THE SITE.
11. COORDINATE WITH THE OWNER FOR INDIVIDUAL BUILDING SHUT
DOWN TO REPLACE DEDICATED BUILDING FEEDERS. OWNER SHALL
RELOCATE THE CRITICAL LOADS TO OTHER ENERGIZED BUILDINGS.
12. DISCONNECT INDIVIDUAL BUILDING BREAKERS, PULL THE CABLES
OUT AND REPLACE IT WITH THE NEW CABLES AS IDENTIFIED IN THE
SCHEDULE TABLE (MAIN SWITCHBOARD BREAKER SHALL BE
DE-ENERGIZE FOR A SHORT PERIOD OF TIME WHILE THE NEW
CABLES ARE PULLED THROUGH THE COMMON WIREWAYS AND
FRAMES).
13. REPEAT STEP 11 AND 12 FOR ALL BUILDING FEEDERS.
Scale: 3/8'':1'
TRANSFORMER/BREAKER CABINET AND NEW PANEL PAD LOCATION2
6'' 36''
KEYNOTES
1. THE LOCATION OF THE PAD MIGHT BE IN CONFLICT WITH THE
UTILITY COMPANY HV CABLE CONTRACTOR SHALL INVESTIGATE
THE EXACT LOCATION BEFORE DIGGING. IN THE EVENT OF
CONFLICT. THE LOCATION OF THE PAD SHALL BE SHIFTED TO BE
CLEARED FROM THE HV UNDERGROUND LINE.
REAL PROPERTY
USDA
SAFETY & HEALTH
AREA ENGINEER
DRAWN BY
CHECKED BY
DESIGNER
PROJECT MANAGER
EPM
PROJECT NO.
DATE
REV. DATE BY
SHEET
DESCRIPTION
Service Research Agricultural
USDA AGRICULTURAL RESEARCH
SERVICE
ELECTRICAL UPGRADE
3793 E 3600 N, KIMBERLY, ID
83341, USA
USDA AGRICULTURAL RESEARCH SERVICE
PROJECT I: REPLACEMENT OF OUTDOOR PANEL AND BUILDING FEEDERS
U S D A
OF
SEAL
332023-11-20
1555-00
D.YASSINE
J.GLEUSNER
S.RASTKAR
B.SANTANA
E-002
SR2023-11-20 100% FOR CONSTRUCTION-REV.3C
CABLE SCHEDULE AND PAD
DETAIL
B 2023-11-17 SR 100% FOR CONSTRUCTION-REV.2
A 2023-10-31 SR 100% FOR CONSTRUCTION-REV.1
7'-3"
3' -3
/2
1'
-4
/2
5' -1
0"
1' -2
10" 10"5'-7"
1/
2" 5"
OPEN
A
B
QED-2 SWITCHBOARD FOUNDATION PLAN
3/4"=1'-0" (1 REQ'D)
CONCRETE QUANTITY (CY)
FOUNDATION 1.97
REFER TO ELECTRICAL
DWGS FOR PAD LOCATION
1' -0
6"
1' -6
TOC EL
GRADE EL
#5 BARS @ 12" OC
TB, EW
SECTION
3/4"=1'-0"
A
3" C
LR
2"
C
LR
3" CLR
TYP3"
P
R O
J
TY
P
COMPACTED NON-FROST
SUSCEPTIBLE FILL
1' -6
" M
IN
(8) 5/8" DIA x 0'-8" LONG HILTI
HAS-V-36 HDG THREADED RODS.
5" EMBEDMENT. INSTALL PER
MANUFACTURER'S WRITTEN INSTRUCTIONS.
(2) #4 STIRRUPS
EACH FACE
#5 BARS @ 12" OC
TB, EW
SECTION
3/4"=1'-0"
B
SEE SECTION "A" FOR
ADD'L INFO
(2) OPENINGS
FINISH TOP SURFACE
TO BE LEVEL AND TRUE
CONCRETE GENERAL NOTES
I. GENERAL SITEWORK/CONSTRUCTION NOTES:
1. CONCRETE AND CONCRETE MATERIALS TO CONFORM TO THE REQUIREMENTS OF ACI
SPECIFICATIONS FOR STRUCTURAL CONCRETE INCLUDING ACI 318-18, 315 R-2018, 117-10 AND 301-16.
2. REINFORCING STEEL SHALL BE ASTM A615, GRADE 60 AND SHALL BE FREE FROM LOOSE FLAKY
RUST, MUD, OIL OR OTHER COATINGS THAT WILL DESTROY OR REDUCE THE BOND. ALL BARS
SHALL BE DEFORMED UNLESS NOTED.
4. CONCRETE SHALL BE MIXED AS FOLLOWS USING ASTM C150, TYPE II CEMENT, UNLESS
OTHERWISE NOTED.
CONCRETE SHALL HAVE A WORKABLE MIX WITH THE FOLLOWING MAXIMUM WATER CEMENT
(W/C) RATIOS:
W/C 0.45 NON AIR-ENTRAINED
0.40 AIR-ENTRAINED
THESE W/C RATIOS SHALL PRODUCE TWENTY-EIGHT (28) DAY COMPRESSIVE STRENGTHS IN
ACCORDANCE WITH ACI 211.1-91/2009, AND PER THE RELATIONSHIPS SHOWN IN TABLE 6.3.4(A).
5. COARSE AGGREGATE SHALL BE A MAXIMUM OF 3/4" IN SIZE.
6. AIR ENTRAINING ADMIXTURES WHICH CONFORM TO ASTM C260, SHALL BE USED IN ALL
CONCRETE UNLESS OTHERWISE NOTED. AIR CONTENT SHALL CONFORM TO ACI 318, TABLE
4.4.1. AIR ENTRAINMENT SHALL BE APPLIED TO CONCRETE EXPOSED TO CYCLES OF FREEZING
AND THAWING WITH MOISTURE, INCLUDING FOUNDATIONS, SLABS AND PAVEMENTS. (SEE
CONCRETE MIX REQUIREMENTS FOR W/C RATIO WITH AIR-ENTRAINMENT.)
7. FOR DESIGN CRITERIA, THE COMPRESSIVE STRENGTH OF CONCRETE SHALL BE TAKEN AS
F'C=4500 PSI.
8. TOP OF FOUNDATION SHALL HAVE A BROOM FINISH.
9. ALL EXPOSED EDGES SHALL HAVE A 3/4" CHAMFER, UNLESS NOTED OTHERWISE ON DESIGN
DRAWINGS OR SPECIFICATIONS ABOVE.
10. SHOULD EXISTING CONDITIONS OTHER THAN THOSE INDICATED ON THE DRAWINGS BE
ENCOUNTERED, THE MERRICK REPRESENTATIVE SHALL BE NOTIFIED IMMEDIATELY SO THAT
CORRECTIVE MEASURES MAY BE RECOMMENDED.
11. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL GOVERNING CODES AND
REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
12. SET FOUNDATIONS AT ELEVATIONS SHOWN AND ON FIRM MATERIAL OF DESIGN BEARING
CAPACITY. CONTRACTOR SHALL VERIFY.
13. COMPACTION:
BACKFILL AND SUBGRADES SHALL HAVE OPTIMUM MOISTURE CONTENT AND SHALL BE
COMPACTED TO NOT LESS THAN 95% ACCORDING TO THE MODIFIED PROCTOR OF
ASTM 1557.
II. SUBGRADE:
1. CONCRETE FOR FOUNDATIONS SHALL BE PLACED ON NON-FROST SUSCEPTIBLE FILL AS SHOWN IN THE DETAILS OF THIS DRAWING. NON-FROST SUSCEPTIBLE FILL SHALL BE GRANULAR WITH
NO MORE THAT 6% PASSING A NUMBER 200 SIEVE.
III. CAST-IN-PLACE CONCRETE:
1. CONCRETE SHALL BE DISCHARGED AT THE PROJECT SITE WITHIN 1-1/2 HOURS AFTER THE
BATCH PLANT HAS ADDED WATER TO THE MIX OF CEMENT AND AGGREGATES. WATER SHALL
NOT BE ADDED AFTER THE INITIAL MIX FROM THE BATCH PLANT. HIGH-RANGE
WATER-REDUCING ADMIXTURE MAY BE ADDED AT THE PROJECT SITE TO INCREASE SLUMP, AS
APPROVED.
2. CONCRETE MIX DESIGN:
A.) WATER/CEMENT RATIO SHALL NOT EXCEED SPECIFIED AMOUNT. THE CONCRETE MIX SHALL
ONLY HAVE ENOUGH CEMENT TO DEVELOP THE REQUIRED STRENGTH. CEMENT SHALL NOT
BE ADDED TO THE MIX TO ACHIEVE THE WATER/CEMENT RATIO. THE WATER SHALL BE THE
VARIABLE, NOT THE CEMENT. WATER REDUCERS AND HIGH RANGE REDUCERS SHALL BE
ADDED TO OBTAIN THE DESIRED WORKABILITY.
B.) THE MAXIMUM SLUMP WITHOUT HIGH-RANGE WATER-REDUCING ADMIXTURE:
1) ALL CONCRETE = 4"
2) ALL NORMAL WEIGHT CONCRETE WITH HIGH-RANGE WATER-REDUCING ADMIXTURE = 9"
IV. CONCRETE AND REINFORCING STEEL:
1. BEFORE PLACING ANY CONCRETE, ALL DRAWINGS SHALL BE CHECKED TO DETERMINE THAT
ANCHOR RODS, EMBEDDED STEEL, GROUNDING CONNECTIONS, PIPING, CONDUIT, DRAINS,
BOXES, ETC. ARE PROPERLY INSTALLED AND SECURED.
2. SPLICES NOT DEFINED ON THE DRAWING SHALL BE LAPPED IN ACCORDANCE WITH ACI 318, CHAPTER 12 CLASS B, TOP BAR.
3. WELDING OR TACK-WELDING OF REINFORCING IS PROHIBITED UNLESS NOTED ON THE
DRAWINGS.
Sheet NumDrawing Name
ELECTRICAL CONCRETE PAD DESIGN S-001
0 10/20/23 SAH ISSUED FOR CONSTRUCTION
(4) #5 DIAG BARS,
1'-4" LG, EACH FACE
1"
CLR
1'-7 1/2"5"1'-2"5"
2'-6"6"2'-6"10 1/2" 10 1/2"
/2
1' -9
WIREWAY, SEE ELECTRICAL
DRAWINGS FOR DETAILS. SEE
WIREWAY FLANGE DIAGRAM
THIS DWG
WIREWAY FLANGE DIAGRAM
3"=1'-0" (2 REQ'D)
(8) HOLES, SEE MANUF. DWGS.
ATTACH TO CONCRETE WITH
3/16"x2 3/4" TAPCON CONCRETE
SCREWS, OR APPROVED EQUAL
WIREWAY FLANGE
SEE WIREWAY
FLANGE DIAGRAM
THIS DWG
(2) #DIAG BARS, 2'-0" LG (TYP)
CIVIL - ARCHITECTURAL - STRUCTURAL - FIRE PROTECTION
PLUMBING - MECHANICAL - ELECTRICAL - TELECOMMUNICATIONS
MERRICK & COMPANY
5970 GREENWOOD PLAZA BLVD.
GREENWOOD VILLAGE, CO 80111-4703
(303) 751-0741
3793 E 3600 N, Kimberly, ID 83341, USA
PROJECT I: REPLACEMENT OF THE OUTDOOR
PANEL AND BUILDING FEEDERS
1 11/17/23 AAT ISSUED FOR CONSTRUCTION
2 11/20/23 CSO ISSUED FOR CONSTRUCTION
| Sheets and Views |
| 2-1555-00-USDA ARS ELECTRICAL UPGRADE-ELECTRICAL-E0 |
| 2-1555-00-USDA ARS ELECTRICAL UPGRADE-ELECTRICAL-E1 |
| 2-1555-00-USDA ARS ELECTRICAL UPGRADE-ELECTRICAL-E2 |
File details come from the government source that posted it. Updated .