Sol_12905B24Q0010_Amd_0003.pdf
PDF 93 KB Posted
- Solicitation number
- 12905B24Q0010
About this file
This document outlines a federal contract opportunity for an upgrade gravel driveway and fire access road project. The project involves removing 10 inches of material and replacing it with 10 inches of aggregate base at a site in Davis, California owned by the US Department of Agriculture Agricultural Research Service Pacific West Area. A site visit is scheduled for December 19, 2023, with questions due by December 21. Quotes for the project are due by January 4, 2024 and shall be submitted to lam.pham@usda.gov. Performance and payment bonds may be required for quotes over $35,000 and $150,000, respectively. The project does not require a BMP, traffic control plan, or involve known hazardous material handling. Final grades should match existing site grades.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12905B24Q0010 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12905B
ALBANY CA 94710
800 BUCHANAN STREET
USDA ARS PWA AAO ACQ/PER PROP
12/07/20230003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/07/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Q: Utility Locating: We understand that every contractor must possess their own USA ticket for utility locating. However, could you kindly clarify the extent of its coverage and whether it encompasses the entire scope of work? If not, would it be necessary to engage a private locator, and if so, who assumes responsibility for this?
A: Existing utilities are shown on the plans, but locations are approximate. Contractors should use due diligence when working around existing utilities to ensure they¿re not damaged.
Q: Depth of Utilities: Could you provide information on the approximate depth of utilities?
This detail will greatly aid us in formulating an effective plan of action.
A: Depth of utilities is unknown ¿ Contractors should use due diligence when working around
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
LAM V. PHAM
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B24Q0010/0003 existing utilities to ensure they¿re not damaged.
Q: Trucking Logistics: We are also interested in understanding the availability of trucking space on the property. Is there a designated route for trucks to circulate or turn around? This information is crucial for strategic planning.
A: Existing driveway area is available for minor material handling but there is not enough area for large stockpiles. All waste material should be removed as excavated.
Q: Does a Geotech report exist for this site?
A: Please see the attached Raney Report
Q: Can you confirm there will be no hazmat handling included in this contract?
A: There is no known contamination at this site, therefore, the material removed should be considered to be excess soil. Disposal method is not specified but must follow any local, state, and federal laws.
Q: An existing rainwater leader¿s depth may impact excavation activities (shallow depth).
Please provide direction.
A: There is an existing approximately 6" metal pipe "rainwater leader" or culvert that was observed during the site walk. It crosses the existing site entrance in front of the existing gate. This pipe should be removed and reinstalled within the new aggregate base at the same grade as the existing pipe.
Q: Please confirm if a BMP Plan is required for the contract scope.
A: No BMP is required for this contract.
Q: The site visit noted a Traffic Control Plan is not required. Please confirm.
A: Confirmed - there is no traffic control plan or traffic control required for this project.
Q: Please confirm if the contract¿s objective is to meet existing grade and slope is not to be modified.
A: Correct. This project involves removal of 10" of material and replacement with 10" of aggregate base (specified in documents). The final grades should match existing grades.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12905B24Q0010/0003
Q: Please confirm there are no UC Davis requirements (i.e. work hours, sweeping requirements, etc.) that impacts this contract¿s scope.
A: There are no UC Davis requirements for work hours, sweeping, etc. Work hours are addressed in the RFQ.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .