Questions and Answers.pdf
PDF 290 KB Posted
- Attached to
- Utility Site Preparation For Modular Unit Placement (Prosser, WA) Federal contract opportunity
- Solicitation number
- 12905B24Q0002
About this file
This document contains questions and answers regarding solicitation number 12905B24Q0002 for utility site preparation to support modular unit placement for the USDA Agricultural Research Service in Prosser, Washington. The project is a total small business set-aside requiring up to 100 linear feet of utility connection work, which will require cutting into existing asphalt. Contractors should estimate the utility connection length between 50 to 100 linear feet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit Sign-In Sheet.pdf | ||
| SF30_12905B24Q0002_0002.pdf | ||
| Attachment VIII - Utility Rough In.pdf | ||
| Attachment X - Utilities.jpg | JPG image | |
| Attachment XI - Water Line Sizes.jpg | JPG image | |
| SF30_12905B24Q0002_0001.pdf | ||
| Attachment VII - Sewer.jpeg | JPEG file | |
| Attachment VI - Modular Foundation.pdf | ||
| Attachment IX - Water.pdf | ||
| Attachment II Statement of Work.pdf | ||
| Attachment III DOL WA20230064_082523.pdf | ||
| Attachment V ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| RFQ_12905B24Q0002 Terms and Conditions.pdf | ||
| Attachment I SF-18.pdf | ||
| Attachment IV ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ # 12905B24Q0002 - Construc on U lity Site Prepara on
Loca on: USDA ARS 24106 N Bunn Road, Prosser, WA 99350
Amendment 2
Ques ons and Answers:
1. There were some ques ons that came up on the site walk as to whether or not we would have to cut back into the asphalt to e into the sewer line.
a. Answer: Yes, cu ng back into the asphalt will be required.
2. Is this a small business set-aside?
a. Answer: Yes, the project is a total small business set-aside.
3. Regarding the 50 LF specified in "A achment II," is this length sufficient to connect the u li es?
Have you verified this measurement in the field, or could you please indicate on a plan where this connec on will occur and confirm if these 50 LF are adequate?
a. Answer: Es mate up to 100 LF maximum (anywhere from 50 LF to 100 LF).