About this file

This document contains questions and answers regarding solicitation number 12905B24Q0002 for utility site preparation to support modular unit placement for the USDA Agricultural Research Service in Prosser, Washington. The project is a total small business set-aside requiring up to 100 linear feet of utility connection work, which will require cutting into existing asphalt. Contractors should estimate the utility connection length between 50 to 100 linear feet.

View the file

Other files for this federal contract opportunity

Other files attached to Utility Site Preparation For Modular Unit Placement (Prosser, WA), newest first.
File Type Posted
Site Visit Sign-In Sheet.pdf PDF
SF30_12905B24Q0002_0002.pdf PDF
Attachment VIII - Utility Rough In.pdf PDF
Attachment X - Utilities.jpg JPG image
Attachment XI - Water Line Sizes.jpg JPG image
SF30_12905B24Q0002_0001.pdf PDF
Attachment VII - Sewer.jpeg JPEG file
Attachment VI - Modular Foundation.pdf PDF
Attachment IX - Water.pdf PDF
Attachment II Statement of Work.pdf PDF
Attachment III DOL WA20230064_082523.pdf PDF
Attachment V ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf PDF
RFQ_12905B24Q0002 Terms and Conditions.pdf PDF
Attachment I SF-18.pdf PDF
Attachment IV ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 12905B24Q0002 - Construc on U lity Site Prepara on

Loca on: USDA ARS 24106 N Bunn Road, Prosser, WA 99350

Amendment 2

Ques ons and Answers:

1. There were some ques ons that came up on the site walk as to whether or not we would have to cut back into the asphalt to e into the sewer line.

a. Answer: Yes, cu ng back into the asphalt will be required.

2. Is this a small business set-aside?

a. Answer: Yes, the project is a total small business set-aside.

3. Regarding the 50 LF specified in "A achment II," is this length sufficient to connect the u li es?

Have you verified this measurement in the field, or could you please indicate on a plan where this connec on will occur and confirm if these 50 LF are adequate?

a. Answer: Es mate up to 100 LF maximum (anywhere from 50 LF to 100 LF).