This document provides specifications for rough utility site preparation for the placement of a modular unit. It outlines requirements for roof penetrations to accommodate pipes of various diameters, as well as locations for safety equipment like showers and floor drains. Electrical specifications include dedicated circuits for lighting, equipment power, and duplex receptacles placed every four feet on alternating circuits. The related federal contract opportunity is from the Department of Agriculture's Agricultural Research Service and is for utility site preparation services at their facility in Prosser, Washington. The solicitation number is 12905B24Q0002. Interested parties should review the full solicitation for additional requirement details and response instructions.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roof penetration for 12” nominal pipe size

Roof penetration 20.5 OD x 20.5 OD for 22” curb

Hot, cold, DI (pure water)

Safety shower, floor drain within two feet

Stub cold water supply and DI water line

Ceiling height 120V/15 Amp

120V/20 Amp dedicated

120V/20 Amp (2 each)

1 ea 240V/30A single phase (w/i 14 feet) 1 ea 240V/20A single phase (w/i 5 feet) 2 ea 120V/20A duplex receptacle Rough in 4 ea 120V/20A circuits to ceiling location within a foot of utility chase

Electrical panels

120V/20A duplex outlets every 4’ on three alternating circuits 240V/20A dedicated