Attachment VIII - Utility Rough In.pdf

PDF 214 KB Posted

Attached to
Utility Site Preparation For Modular Unit Placement (Prosser, WA) Federal contract opportunity
Solicitation number
12905B24Q0002
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Pacific West Area

About this file

This document provides specifications for rough utility site preparation for the placement of a modular unit. It outlines requirements for roof penetrations to accommodate pipes of various diameters, as well as locations for safety equipment like showers and floor drains. Electrical specifications include dedicated circuits for lighting, equipment power, and duplex receptacles placed every four feet on alternating circuits. The related federal contract opportunity is from the Department of Agriculture's Agricultural Research Service and is for utility site preparation services at their facility in Prosser, Washington. The solicitation number is 12905B24Q0002. Interested parties should review the full solicitation for additional requirement details and response instructions.

View the file

Other files for this federal contract opportunity

Other files attached to Utility Site Preparation For Modular Unit Placement (Prosser, WA), newest first.
File Type Posted
Site Visit Sign-In Sheet.pdf PDF
Questions and Answers.pdf PDF
SF30_12905B24Q0002_0002.pdf PDF
Attachment X - Utilities.jpg JPG image
Attachment XI - Water Line Sizes.jpg JPG image
SF30_12905B24Q0002_0001.pdf PDF
Attachment VII - Sewer.jpeg JPEG file
Attachment IX - Water.pdf PDF
Attachment VI - Modular Foundation.pdf PDF
Attachment II Statement of Work.pdf PDF
RFQ_12905B24Q0002 Terms and Conditions.pdf PDF
Attachment I SF-18.pdf PDF
Attachment IV ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf PDF
Attachment III DOL WA20230064_082523.pdf PDF
Attachment V ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roof penetration for 12” nominal pipe size

Roof penetration 20.5 OD x 20.5 OD for 22” curb

Hot, cold, DI (pure water)

Safety shower, floor drain within two feet

Stub cold water supply and DI water line

Ceiling height 120V/15 Amp

120V/20 Amp dedicated

120V/20 Amp (2 each)

1 ea 240V/30A single phase (w/i 14 feet) 1 ea 240V/20A single phase (w/i 5 feet) 2 ea 120V/20A duplex receptacle Rough in 4 ea 120V/20A circuits to ceiling location within a foot of utility chase

Electrical panels

120V/20A duplex outlets every 4’ on three alternating circuits 240V/20A dedicated

File details come from the government source that posted it. Updated .