12837120Q0068 4.30.2020 final.pdf
PDF 2 MB Posted
- Attached to
- Brown Canyon Ranch Host Site Federal contract opportunity
- Solicitation number
- 12837120Q0068
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12837120Q0068 Brown Canyon Ranch Host Site Responses to Questions.pdf | ||
| 12837120Q0068 amd 0001.pdf | ||
| Attachment 4 Wage Determination az23.pdf | ||
| Attachment 3 SitePlan.pdf | ||
| Attachment 2 ScheduleOfItems.pdf | ||
| Attachment 4 Wage Determination az7.pdf | ||
| Attachment 1 Specifications.pdf | ||
| Attachment 5 LocationMap.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
994189
SOUTHWESTERN REGION
333 BROADWAY SE
ALBUQUERQUE NM 87102
DAVID WATSON 602-225-5350
104/30/2020
12837120Q0068
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Attachment 1 SOW/Specifications
Attachment 2 Schedule of Items
Attachment 3 Site Plan
Attachment 4 Wage Determination
Attachment 5 Location Map
Scope of work includes:
1. Construction of a 20' x 40' reinforced concrete slab (additive bid item)
2. Installation of aggregate road surfacing
3. Installation of a wastewater tank, sewer line, and an RV sewer connection
4. Installation of a solar power system, underground electric, and an electric pedestal
5. Installation of a host site sign.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 120 calendar days and complete it within ________________ ________________ calendar days after receiving
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
NAICS: 237110 SIZE STANDARD: $39.5M TOTAL SMALL BUSINESS SET ASIDE
Site Visit Date: Tuesday May 12th Time: 1130 Location: Brown Canyon Ranch
Sierra Vista, AZ 85650
In accordance with FAR 36.204(f), the construction magnitude of this project is estimated between $25,000 and $100,000.Payment bond is required.
05/22/2020
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
SOUTHWESTERN REGION
333 BROADWAY SE
ALBUQUERQUE NM 87102
DAVID L. WATSON
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 20
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
12837120Q0068
Brown Canyon Ranch Host Site
Furnish all material, equipment, transportation, labor and supervision necessary to construct a host site per drawings and specifications.
Delivery: 120 Days After Notice to Proceed
Delivery Location Code: 8197
CORONADO NATIONAL FOREST
300 WEST CONGRESS
TUCSON AZ 85701 US
0001 Brown Canyon Ranch Host Site
0002 Concrete Slab 20' x 40' x 6" thick reinforced w/12" deep
6" wide thickened edge, Davis color "Adobe"
Product/Service Code: Y1JZ
Product/Service Description: CONSTRUCTION OF
MISCELLANEOUS BUILDINGS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Base Bid Contract Items Pay Item Description
Method of Measurement
Est.
Quantity
Pay Unit
Unit Price Total
1 Mobilization LSQ 1 LS -$ -$
2 Fill, In Place, Compacted (20'x40' x average 1' deep) AQ 50 TON -$ -$
3 Aggregate Surfacing, In Place, Compacted AQ 85 TON -$ -$
06010-Septic Tank, Wastewater line, and RV Waste Connection LSQ 1 EA -$ -$
5 16010-Solar Power System LSQ 1 EA -$ -$
6 16000-Buried Electrical and RV Electrical Pedestal AQ 125 LF -$ -$
7 Host Site Sign AQ 1 EA -$ -$
Base Contract Total - Additive Bid Contract Items
Concrete Slab 20' x 40' x 6" thick reinforced w/12" deep 6" wide thickened edge, Davis color "Adobe" AQ 112 SY - -
Additive Contract Total -
Grand Total -
Brown Canyon Ranch Host Site
Designated Method of Measurement: AQ - actual quantities; LSQ - lump sum quantities
NOTE: Required work shown on the drawings and described in the specifications and not listed on this schedule of Items shall be considered incidental to other pay items.
SCHEDULE OF ITEMS
T:\Proj14\85001302\schedule of terms.xls
SPECIFICATIONS
FOR
BROWN CANYON RANCH
HOST SITE
April 6, 2020
SPECIFICATIONS LIST FOR
BROWN CANYON RANCH HOST SITE
DIVISION 1 – GENERAL REQUIREMENTS
01010 – Scope of Work 01020 – Measurement & Payment 01030 – Construction Staking 01040 – Submittals 01070 – Mobilization
DIVISION 2 – SITE WORK
02010 – Demolition and Clearing 02030 – Earthwork 02030 – Surfacing 02040 – Finish Grading 02232 – Aggregate Base 02100 – Portland Cement Concrete Paving
DIVISION 3 – CONCRETE
03010 – Concrete Formwork 03020 – Concrete Reinforcement 03030 – Cast-in-Place Concrete 03040 – Concrete Finishing
DIVISION 6 – WATER SERVICES AND SEWER SERVICES
06010 – Installation of Trenched Utilities and Sewer Vaults
DIVISION 16 – ELECTRICAL
16000 – Electrical Work 16020 – Solar System
DIVISION 1 – GENERAL REQUIREMENTS
SCOPE OF WORK – 01010
PART 1 – GENERAL
1.1 – Description
Furnish all material, equipment, transportation, labor and supervision necessary to construct a host site per drawings and specifications.
Scope of work includes:
1. Construction of a 20’ x 40’ reinforced concrete slab (additive bid item)
2. Installation of aggregate road surfacing
3. Installation of a wastewater tank, sewer line, and an RV sewer connection
4. Installation of a solar power system, underground electric, and an electric pedestal
5. Installation of a host site sign.
1.2 – Definitions
Contractor – the successful bidder who is awarded the contract.
Government – the Contracting Officer (CO) or designated Contracting Officer’s Representative (COR) of the Coronado National Forest.
1.3 – Location and Conditions
The proposed project is located at Brown Canyon Ranch, Sierra Vista Ranger District, Coronado National Forest.
It will be the Contractor’s responsibility to familiarize themselves with the existing conditions and notify the Government of any discrepancies shown in these documents.
1.4 – Schedule
A pre-work meeting will be at the site for clarification of the project.
A schedule for all work must be submitted to and approved by the Government.
The Contractor shall notify the Forest Service three (3) days in advance of any survey work and seven (7) days in advance of any construction work.
Construction work shall be completed within 120 days.
1.5 – Contract Administration
The Contractor shall be fully responsible for seeing that construction activities conform to the approved final drawings and specifications, and according to provisions of this contract. The Government will provide timely reviews as requested by the Contractor and may periodically review work at any time.
Construction quality control shall include supplying all the personnel, equipment, tests and reports necessary to ensure that construction is completed in compliance with the drawings, specifications and provisions of the contract.
The Contractor shall not disturb plants or soil except within the areas necessary to complete the work. The Contractor shall clearly stake limits of construction and maintain marks throughout construction. The Government will review all staking. Plants damaged or destroyed unnecessarily shall be replaced at Contractor’s expense with identical species and size of plants.
1.6 – Quality of Work
The products listed in the specifications are preferred products chosen for building compatibility and quality. When name-brand equipment is specified the contractor shall provide the same or equally performing equipment, as judged by the Contracting Officer. However, equal or better alternatives submitted by the Contractor will be considered and are encouraged.
Use recovered materials, recyclable materials, and environmentally preferable products and services where possible as per Executive Order 12873.
1.7 – Codes and Standards
Codes and standards of the following associations and listed publications will become part of this contract:
1. Uniform Building Code (UBC)
2. American Concrete Institute (ACI) - Manual 318
3. Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG), available on the internet at www.fs.fed.us/recreation/programs/accessibility.
4. American Society for Testing and Materials (ASTM)
5. American National Standards Institute (ANSI)
6. Occupational Health and Safety Administration (OSHA) standards
7. Arizona Department of Transportation Structures Section Standard Drawings (ADOT B-
Standards)
8. National Electrical Code (NEC) most current edition.
All materials, workmanship, and designs shall meet specified requirements of the standards referenced in this section and other local or state codes, related to this type of work, whichever is more stringent. If a particular item is not covered by a standard, it shall be proven by certified test by a reputable laboratory to be capable of performing satisfactorily.
1.8 – Special Construction Requirements http://www.fs.fed.us/recreation/programs/accessibility
A. Host site sign shall be routed HDPE in Forest Service brown and yellow-cream, approx.
12”x24”, available from Wood Product Signs www.woodproductsigns.com. Install on 2”x2” self-weathering post in concrete footing 12” wide x 18” deep. Words to be provided by Gov’t.
B. Upon completion of the project, all excess soil, demolished structures and other construction materials shall be removed from Government Land and disposed of in accordance with State and County standards.
C. Construction Access and Protection: The Contractor shall be responsible for securing the project area from the public. This includes providing the necessary security for protection of the Contractor's materials, equipment, tools and work until final acceptance by the Government.
The Contractor shall also provide sufficient signs, barriers, barricades, markers, etc. to warn the public of hazardous conditions and to protect the public from injury.
D. Equipment and material storage: The Contractor shall obtain permission from the Contracting Officer for equipment and material storage, and for other areas needed for construction.
E. All site features to remain including but not limited to the roadway, buildings, and vegetation shall be protected from damage during the project.
F. No live trees are to be cut unless designated on the drawings. Dead trees and stumps may be removed. Tree limbs may be trimmed as necessary.
G. Sanitation/Garbage: The Contractor may use vault restroom at the site. No garbage service is available for Contractor use. The Contractor shall keep the construction site free of loose garbage at all times.
H. The Contractor may locate field office’s and personnel use trailers on site during the construction period.
I. All ground disturbing activities will be monitored by a Coronado National Forest cultural resource professional. Contractor shall coordinate schedule with the Coronado National Forest to schedule such monitoring.
1.5 – Utility Services
There is no electric service or water available at the site.
1.6 – Contract Closeout
Remove temporary facilities and provide final cleaning and touch-up. Restore portions of buildings, site improvements, landscaping, and other items damaged by construction operations to the satisfaction of the Government at no additional expense to the Government.
*** END OF SPECIFICATION 01010 ***
http://www.woodproductsigns.com/
MEASUREMENT & PAYMENT – 01020
1.1 – Measurement & Payment
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to the completion of the items shown and no separate payment will be made.
1.2 – Determination of Quantities
A. The following measurements and calculations are used to determine contract quantities.
1. The average end area method will be used to compute volumes of excavation or embankment. However, if in the judgment of the Government, the average end area method is impractical, measurement will be made by volume in hauling vehicles or by other three dimensional methods.
2. Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered in writing by the Government to fit field conditions.
3. For items that are measured by the linear foot, measurements will be made parallel to the base or foundation upon which the structures are placed. Pipe culverts shall be measured along center of invert and pipe arches shall be measured at spring line.
4. For vehicular shipments, net certified scale weights or weights based on certified volumes will be used as a basis of measurement. Measurements will be adjusted when material has been lost from the vehicle, has been wasted, or has otherwise not been incorporated into the work.
Determining true weights of hauling vehicles shall be made by weighing the empty vehicles at least once a day as directed by the Government. Each vehicle shall bear a plainly legible identification mark.
5. For aggregates weighed for payment, the tonnage will not be adjusted for moisture content unless otherwise provided.
6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) which are specified by gauge, weight, section measurements, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.
1.3 – Units of Measurement
A. Payment will be by units defined and determined according to U.S. Standard measure and by the following:
1. Cubic Yard: A measurement computed by one of the following methods:
(a) Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
(b) Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
(c) Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
2. Ton: Short ton consisting of 2,000 pounds.
*** END OF SPECIFICATION 01020 ***
CONSTRUCTION STAKING – 01030
1.1 – Scope
This section specifies construction staking required for all construction needs.
PART 2 – PRODUCTS
None.
PART 3 – EXECUTION
3.1 – General
The Contractor shall set all flagging, stakes, nails and string lines etc. necessary to construct a complete project as SHOWN ON THE DRAWINGS. The Contractor is responsible for verifying any existing control points shown on the plans. The Contractor shall be responsible for maintaining all staking and for replacing any stakes lost or destroyed during their use period. Construction work shall not begin on an item until the staking for that item has been approved by the Government. This approval will not relieve the Contractor of the responsibility and the associated costs for correcting any errors, whether the errors are discovered during the performance of the survey or during subsequent phases of the project.
*** END OF SPECIFICATION 01030 ***
SUBMITTALS – 01040
PART 1 – REQUIREMENTS
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item.
Contractor shall allow 5 days for processing of submittals by the Government. Submittals may also be referred to as shop drawings.
PART 2 – MANUFACTURER'S LITERATURE AND SHOP DRAWINGS
A. The Contractor shall submit three (3) copies of all submittals to the Government for approval on the items required herein. For each submittal, the Contractor must receive written approval from the Government to use the item before incorporating it into the project work. Literature must be marked or otherwise designated to show the exact model, size, etc. the Contractor proposes to use.
Information must be adequate to determine compliance with the specifications. Approvals must be received for products differing from those described in the Government-supplied specifications.
B. Submittals will be waived if the Contractor furnishes the exact item used for design when the manufacturer's model, size, etc. are shown in the contract.
C. Manufacturer's literature or certificates of compliance are required for the following items:
1. Solar kit
2. Concrete mix
3. Concrete reinforcement
4. Aggregate
5. Septic tank
6. Septic line
7. Septic RV connection
8. Solar components; Inverter/charger, Panels and their Mountings, Batteries, Array Combiner, DC-to-DC Converter, Wire and Cable, Enclosures.
9. Power Pedestal, breaker/receptacle panels, junction boxes
10. Host site sign
*** END OF SPECIFICATION 01040 ***
MOBILIZATION – 01070
1.1 – Description
This section specifies preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items at the project site.
1.2 – Basis of Payment
A. The Contractor can request payment for performance and payment bonds upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
B. Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. Under no circumstances will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
C. Progress payments will be made as follows:
1. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
2. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
3. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
4. The total of all payments shall not exceed the original contract amount for this item.
*** END OF SPECIFICATION 01070 ***
*** END DIVISION 1 ***
***DIVISION 2 – SITE WORK***
DEMOLITION AND CLEARING – 02010
1.1 – Section Includes
A. Removal of surface debris and clearing of vegetation.
1.2 – References
A. Coordinate clearing work with the Government.
B. Comply with site-specific landscape and hardscape demolition requirements found in other sections and drawings.
PART 2 – PRODUCTS
Not Used.
PART 3 – EXECUTION
3.1 – Preparation
Verify that existing plants designated to remain are identified and protected. Mark all trees to remain in a manner that indicates pre-demolition ground level and use marking system that does not damage trees to be so marked.
3.2 – Protection
A. Protect plants and features not required to be removed by construction activities.
B. Protect existing structures from damage or displacement. Also protect vegetation, soils, and boulders that are outside grading limits.
3.3 – Clearing
A. Do not remove any trees unless approved by the government.
B. If any archaeological artifacts or evidence is encountered, notify the Government and halt work in the area immediately.
3.4 – Removal
A. Remove and legally dispose all construction debris and extracted plant life from site.
B. The Contractor shall perform the work as shown on the drawings.
C. The Contractor shall be responsible for removal, equipment, containment, cleanup, and associated costs necessary for removing and salvaging items shown on the plans.
D. All facilities and materials scheduled for demolition must be completely removed and disposed of legally off Government lands by the Contractor.
D. Fill all holes and restore grades wherever facilities or extracted plant life are removed.
*** END OF SPECIFICATION 02010 ***
SITE WORK
EARTHWORK – 02030
1.1 – Work Included:
Supply and place material as required.
PART 2 – PRODUCTS
Fill Materials:
Satisfactory Soils: ASTM D 2487 soil classification groups GW, GP, GM,SW, SP, and SM or a combination of these group symbols; free of rock or gravel larger than 3 inches in any dimension, debris, waste frozen materials, vegetation, and other deleterious matter.
Other acceptable fill material: Crushed aggregate, conforming to the requirements of AASHTO M147, grade D
PART 3 – EXECUTION
1.1 – Preparation A. The Contractor shall familiarize himself with all site conditions prior to the start of work, and shall notify the Government of any discrepancies found between site conditions and the contract documents.
B. Scheduling:
1. Schedule all work in a careful manner with all necessary consideration for the public.
2. Avoid interference with the use of, and access to adjacent facilities.
1.2 – Excess Water Control:
A. Finish grading operations shall be performed during dry weather. Soil shall not be in a wet condition.
B. All standing water shall be promptly removed. Finish grading shall not resume until conditions and approved by the Government.
C. The Contractor shall be responsible for positive drainage of all areas of work.
1.3 – Compaction:
A) Compacted fill and backfill shall be placed with suitable equipment in horizontal layers not to exceed 9 inches in depth for rubber tired or vibratory rollers, 6 inches for tamping rollers and 4 inches when mechanical tampers are used.
B) Before placing fill material, surfaces to receive compacted fill shall be cleared of all existing obstructions and vegetation debris. All foundation surfaces to receive fill shall be smoothed, scarified and compacted to 95% of maximum density as determined in accordance with ASTM D 698 for a depth of at least 12 inches using approved compaction equipment.
C) Each layer of compacted fill shall be compacted to not less than 95 percent of maximum density when tested in accordance with ASTM D 698.
D) Aggregate shall be compacted a minimum of 95% of maximum density as determined by AASHTO T180-74 Method D.
1.4 – Finish Grading
A. Fine grade all areas, eliminating rough and low areas. Maintain levels, profiles and contours to subgrades. Maintain positive drainage away from the structure.
B. Remove all stones, roots, grass, weeds and other foreign material while finish grading. Remove and dispose legally of all debris.
*** END OF SPECIFICATION 02020 ***
DIVISION 2 – SITE WORK
SURFACING – 02030
1.1 – Description Of Work
Work as evident on drawings and specified herein or required to accomplish the removal, replacement and installation of miscellaneous surfacing materials as required to comply with the construction drawings.
1.2 – Related Specifications
A. Pima County/City of Tucson (PC/COT) Standard Specifications and Details for
Public Improvements (2003 Edition), hereafter referenced as PC/COT.
B. Pima County Wastewater Management Department, Manual of Engineering
Standards and Procedures.
C. Tucson Water's Standard Waterworks Specifications and Details.
1.3 – Quality Assurance
Codes, Standards: Standard Details and Materials Standards as referenced herein.
1.4 – Submittals
A. Mix Designs: The Contractor shall submit a mix design for the following materials to the Government for review and approval:
1. Portland Cement Concrete, one submittal for each class of concrete utilized.
2. Asphaltic Concrete, one submittal for each mix of asphaltic concrete utilized.
B. Aggregate Base Course: The Contractor shall submit a laboratory analysis of the aggregate base course material.
1.5 - Dust Control
A. The Contractor shall maintain adequate dust control at all times by sprinkling with water or other approved methods. Any and all claims for dust damage and nuisance to persons or property shall be borne solely by the Contractor.
2.1 – PORTLAND CEMENT CONCRETE (PCC)
The Portland Cement Concrete shall conform to PC/COT Standard Specification No. 1006 and the class specified.
2.2 – Aggregate Base Course
The aggregate base course shall conform to PC/COT Standard Specification No. 303.
2.3 – Joint Material
Joint material shall conform to PC/COT Standard Specification 1011.
2.4 – Hot Bituminous Mix shall conform to PC/COT Standard Spec 406 Residential #2.
3.1 – Cleanup
A. Clean all foreign material from finish surfaces.
B. Dispose of all debris, unsalvageable material and all other unsuitable material in accordance with all governing rules and regulations.
*** END OF SPECIFICATION 02030 ***
FINISH GRADING – 02040
1.2 – Work Included:
Backfill along concrete edges and ensure positive drainage away from facilities.
PART 2 – PRODUCTS
None.
PART 3 – EXECUTION
3.1 – Preparation
C. The Contractor shall familiarize himself with all site conditions prior to the start of work, and shall notify the Government of any discrepancies found between site conditions and the contract documents.
3.2 – Excess Water Control
A. Finish grading operations shall be performed during dry weather. Soil shall not be in a wet condition.
B. All standing water shall be promptly removed. Finish grading shall not resume until conditions and approved by the Government.
C. The Contractor shall be responsible for positive drainage of all areas of work.
3.3 – Finish Grading
C. Fine grade all areas, eliminating rough and low areas. Maintain levels, profiles and contours to subgrades.
D. Remove all stones, roots, grass, weeds and other foreign material while finish grading. Remove and dispose legally of all debris.
A. Backfill along all concrete edges so that none protrude over 1/2" above surrounding grade. Fill slopes shall be 4:1 or flatter (unless shown otherwise on drawings) with a 1’ flat compacted aggregate shoulder adjacent to the pavement unless shown otherwise on the plans.
B. Fill slopes shall be 3:1 or flatter.
*** END OF SPECIFICATION 02040 ***
AGGREGATE BASE - 02232
PART I-GENERAL
1.1 SUMMARY
The work of this section consists of furnishing and placing aggregate, and filler if required, on a prepared subgrade.
1.2 SUBMITTALS
A. Two copies of certified weight tickets for each load of aggregate delivered to project site.
B. If materials are obtained from a commercial source, submit certification from the supplier certifying that aggregate base course meets the requirements of this section.
C. Submit all Material and Compaction Test results directly to Contracting Officer (CO) from testing services, with copy to Contractor.
1.3 QUALITY ASSURANCE
A. Material Test and Compaction Test to be the responsibility of the Contractor.
B. PART 2 –PRODUCTS
2.1 AGGREGATE
A. Clean, hard, durable fragments or particles of crushed stone, crushed slag, or crushed or natural gravel. Materials that break up due to freeze-thaw or wet-dry cycling shall not be used.
B. Coarse Aggregate: AASHTO T96- 77, percentage of wear of not more than 50.
C. Fraction passing No. 40 sieve shall have a liquid limit not to exceed 25 and a plasticity index of not more than six, as determined by AASHTO T89-81 and 0-81, respectively.
D. Material, inclusive of filler, shall meet following screen analysis requirements by weight:
SIEVE DESIGNATION PERCENT PASSING
1-1/2 inch 100 1 inch 80 - 100 No.4 35 - 75 No. 40 10 - 30 No. 200 0 - 10
3.1 PLACING
If the required compacted depth of the aggregate base course exceeds six inches, place course in two or more layers of approximately equal thickness. The maximum compacted thickness of anyone layer will not exceed six inches.
3.2 MIXING
Mix the aggregate by anyone of the three following methods:
1. Stationary Plant Method: Mix aggregate base course and appropriate amount of water for compaction in an approved mixer. After mixing, transport aggregate to the job site while it contains the proper moisture content and place on the roadbed with an approved aggregate spreader. Before compaction, remove excess moisture.
2. Travel Plant Method: After the material for each layer has been placed through an aggregate spreader or windrow-sizing device, it shall be uniformly mixed by a traveling mixing plant.
3. Road Mix Method: After placing each layer, mix materials at optimum moisture content using motor graders or other approved equipment until the moisture is uniform throughout.
3.3 COMPACTION
Compact each layer to a density of not less than 95 percent of the maximum density, as determined by AASHTO T180- 74, Method D. Test density in-place, in accordance with AASHTO T191-61, T205-64, or other recognized method. Density tests to be performed in a minimum of 3 locations as directed by the engineer.
3.4 SURFACE FINISHING
A. Use a smooth steel wheel roller for the final rolling of top surface base course. Water surface and evenly spread loose stones before final rolling. Make minimum of two complete passes over area to embed stones. Correct soft spots developed during rolling.
B. Compacted base course surface shall be smooth and free from waves and other irregularities.
Unsatisfactory portions of base course shall be tom up, reworked, re-laid, and re-rolled, at no additional expense to Government.
3.5 MATERIAL ACCEPTANCE REQUIREMENTS
Acceptance will be based on periodic samples and tests taken following mixing and before laying.
3.6 TOLERANCES
Surface: Contractor will test finished surface of the base course with a 10-foot straightedge or other device. The variation between any two contacts with the surface.
3.7 MAINTENANCE
Maintain base course in a satisfactory condition until surfaced or until final acceptance.
***END OF SECTION 02232***
PORTLAND CEMENT CONCRETE PAVING – 02100
1.1 – Section Includes
Concrete slabs.
1.2 – References
A. ACI 304 – Recommended Practice for Measuring, Mixing, Transporting and Placing
Concrete.
B. ASTM C33 – Concrete Aggregates.
C. ASTM C94 – Ready Mix Concrete.
D. ASTM C150 – Portland Cement.
E. ASTM C260 – Air-Entraining Admixtures for Concrete.
F. ASTM C309 – Liquid Membrane-Forming Compounds for Curing Concrete.
G. ASTM C494 – Chemical Admixtures for Concrete.
H. ASTM D1751 – Preformed Expansion Joint Fillers for Concrete Paving and Structural
Construction.
I. ASTM D1752 – Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction.
J. PC/COT 601-3.03 – Pima County/City of Tucson Standard Specifications for Public
Improvements - Placing Concrete.
1.3 – Submittals For Review
Product Data: Provide data on joint filler, admixtures and curing compounds.
1.4 – Quality Assurance
A. Perform work in accordance with ACI 301 and PC/COT Standard Specification 908.
B. Obtain cementitious materials from same source throughout.
1.5 – Environmental Requirements
Do not place concrete when base surface temperature is less than 40°F, or surface is wet or frozen.
2.1 – Form Materials
Wood or steel form material, profiled to suit conditions.
2.2 – Concrete Materials
As specified in Section 03030 Cast-in-Place Concrete.
Concrete mix shall have integral Davis color “Adobe”.
2.3 – Accessories
A. Curing Compound: AASHTO M148 (ASTM C309), Type 1, Class A.
B. Joint Fillers: 1/2-inch preformed strips conforming to the requirements of Pima
County/City of Tucson Standard Specification 1011.
2.4 – Concrete Mix
A. Mix concrete in accordance with ACI 304. Deliver concrete in accordance with
ASTM C94.
B. Select proportions for normal weight concrete.
C. Provide concrete to the following criteria:
1. Compressive Strength: 3,000 psi at 28 days.
2. Slump: 3 inches.
3. Air entrainment 3-5%.
D. Use accelerating admixtures in cold weather only when approved by the Government.
Use of admixtures will not relax cold weather placement requirements.
E. Use calcium chloride only when approved by the Government.
F. Use set retarding admixtures during hot weather only when approved by the Government.
3.1 – Examination
A. Verify base conditions under provisions of Section 02020.
B. Verify gradients and elevations of base are correct.
3.1 – Preparation
A. Moisten base to minimize absorption of water from fresh concrete.
B. Notify the Government minimum 24 hours prior to commencement of concreting operations.
3.3 – Forming
A. Place and secure forms to correct location, dimension, profile, and gradient.
B. Assemble formwork to permit easy stripping and dismantling without damaging concrete.
C. Place joint filler vertical in position, in straight lines. Secure to formwork during concrete placement.
3.4 – Placing Concrete
Place concrete in compliance with PC/COT Standard Specifications for Public Improvements Section 601-3.03.
3.5 – Joints
A. General: Construct expansion, weakened-plane (contraction) and construction joints true-to-line with face perpendicular to surface of concrete. Construct transverse joints at right angles to the center line, unless otherwise indicated. Locate joints as shown on the drawings or, if not shown, divide concrete slabs into maximum 12-foot sections in both directions not to exceed a ratio of 4:5, as approved by the Government.
When joining existing structures, place transverse joints to align with previously placed joints, unless otherwise indicated.
B. Weakened-Plane (Contraction) Joints: Provide weakened-plane (contraction) joints, sectioning concrete into areas as noted above or as shown on drawings. Construct weakened-plane joints for a depth equal to at least 1/4 concrete thickness as follows:
1. Saw-Cut Joints: Saw cuts should be made 12 to 24 hours after finishing. Cut to a depth of 2", clean groove of loose debris.
2. Construction Joints: Place concrete joints at the end of pours and at locations where placement operations are stopped for a period of more than 1/2 hour, except where such pours terminate at expansion joints.
3. Expansion Joints: Provide pre-molded joint filler for expansion joints, in sidewalks and abutting concrete curbs, catch basins, manholes, inlets, structures, walks and other fixed objects, unless otherwise indicated. Depress joint filler 1/2 inch below surface where joint sealer is required. Unless otherwise indicated, provide expansion joints at a maximum of 30 feet on center spacing to divide concrete into maximum 720 SF.
3.6 – Finishing
A. Exterior Slabs and Walks: Medium Broom Finish.
B. Place curing compound on exposed concrete surfaces immediately after finishing.
Apply in accordance with manufacturer's instructions.
3.7 – Tolerances
A. Maximum Variation of Surface Flatness: 1/4 inch in 10 feet.
B. Maximum Variation From True Position: 1/4 inch.
3.10 – Field Quality Control
Testing firm will take cylinders and perform slump tests in accordance with ACI 301.
3.11 – Protection
A. Immediately after placement, protect concrete from premature drying, excessive hot or cold temperatures, and mechanical injury.
B. Do not permit traffic over concrete until 75 percent design strength of concrete has been achieved.
*** END OF SPECIFICATION 02100 ***
DIVISION 3 – CONCRETE
CONCRETE FORMWORK – 03010
PART 1 – GENERAL
1.1 – Section Includes
A. Formwork for cast-in place concrete, with shoring, bracing, and anchorage.
B. Openings for other work.
C. Form accessories.
D. Form stripping.
1.2 – Products Installed But Not Furnished Under This Section
A. Section 03030 – Cast-In-Place Concrete: Supply of concrete accessories for placement by this section.
1.3 – Related Sections
A. Section 03020 – Concrete Reinforcement.
B. Section 03030 – Cast-in-Place Concrete.
1.4 – References
A. ACI 301 – Structural Concrete for Buildings.
B. ACI 318 – Building Code Requirements for Reinforced Concrete.
C. ACI 347 – Recommended Practice for Concrete Formwork.
D. PS 1 – Construction and Industrial Plywood.
1.5 – Design Requirements
A. Design, engineer and construct formwork, shoring, and bracing to conform to design and code requirements; resultant concrete to conform to required shape, line, and dimension.
1.6 – Quality Assurance
Perform Work in accordance with ACI 347.
1.7 – Qualifications
Design of formwork is the responsibility of the Contractor.
1.8 – Regulatory Requirements
Conform to applicable code for design, fabrication, erection, and removal of formwork.
1.9 – Delivery, Storage, And Handling
A. Deliver, store, protect, and handle products to site under provisions of General Conditions.
B. Deliver void forms and installation instructions in manufacturer's packaging.
C. Store off ground in ventilated and protected manner to prevent deterioration from moisture.
1.10 – Coordination
A. Coordinate work under provisions of General Conditions.
B. Coordinate this Section with other Sections of work which require attachment of components to formwork.
C. If formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement before proceeding, request instructions from Government.
PART 2 – PRODUCTS
2.1 – Wood Form Materials
A. Softwood Plywood: PS 1, C Plugged Grade, Group 2.
B. Lumber: Pine species; construction grade or better; with grade stamp clearly visible.
2.2 – Prefabricated Forms
A. Preformed Steel Forms: Minimum 16 gage matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to tolerances and appearance of finished surfaces.
2.3 – Formwork Accessories
A. Form Ties: Snap-off type, galvanized metal, adjustable length, cone type, with waterproofing washer, free of defects that could leave holes larger than 1 inch in concrete surface.
B. Form Release Agent: Colorless mineral oil which will not stain concrete, or absorb moisture, or impair natural bonding or color characteristics of coating intended for use on concrete.
C. Dovetail Anchor Slot: Galvanized steel, 22 gage thick, foam filled, release tape sealed slots, anchors for securing to concrete formwork.
D. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Sized as required, of sufficient strength and character to maintain formwork in place while placing concrete.
E. Waterstops: Rubber, minimum 1,750 psi tensile strength, minimum 50°F to plus 175°F working temperature range, maximum possible lengths, ribbed profile, preformed corner sections, heat welded jointing.
PART 3 – EXECUTION
3.1 – Examination
A. Government to approve all forms at least 4 hours prior to placing concrete. Notify Government 24 hours in advance of pouring concrete.
B. Verify lines, levels, and centers before proceeding with formwork. Ensure that dimensions agree with drawings.
3.2 – Earth Forms
A. Hand trim sides and bottom of earth forms. Remove loose soil prior to placing concrete.
3.3 – Erection Formwork
A. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with requirements of ACI 301.
B. Provide bracing to ensure stability of formwork. Shore or strengthen formwork subject to over stressing by construction loads.
C. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores.
D. Align joints and make watertight. Keep form joints to a minimum.
E. Obtain approval before framing openings in structural members which are not indicated on Drawings.
F. Install void forms in accordance with manufacturer's recommendations. Protect forms from moisture or crushing.
3.4 – Application - Form Release Agent
A. Apply form release agent on formwork in accordance with manufacturer's recommendations.
B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items.
C. Do not apply form release agent where concrete surfaces will receive special finishes or applied coverings which are affected by agent. Soak inside surfaces of untreated forms with clean water. Keep surfaces coated prior to placement of concrete.
3.5 – Inserts, Embedded Parts, And Openings
A. Provide formed openings where required for items to be embedded in passing through concrete work.
B. Locate and set in place items which will be cast directly into concrete.
C. Coordinate with work of other sections in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work.
D. Install accessories in accordance with manufacturer's instructions, straight, level, and plumb. Ensure items are not disturbed during concrete placement.
E. Install water stops continuous without displacing reinforcement. Heat seal joints watertight.
F. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain.
G. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly fitted so joints will not be apparent in exposed concrete surfaces.
3.6 – Form Cleaning
A. Clean forms as erection proceeds, to remove foreign matter within forms.
B. Clean formed cavities of debris prior to placing concrete.
C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out-ports.
D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure. Use compressed air or other means to remove foreign matter.
3.7 – Formwork Tolerances
Construct formwork to maintain tolerances required by ACI 301.
3.8 – Field Quality Control
A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and that supports, fastenings, wedges, ties, and items are secure.
B. Do not reuse wood formwork more than 3 times for concrete surfaces to be exposed to view.
C. Do not patch formwork.
3.9 – Form Removal
A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads.
B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view.
C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms.
*** END OF SPECIFICATION 03010 ***
CONCRETE REINFORCEMENT – 03020
PART 1 – GENERAL
1.1 – Section Includes
Reinforcing steel bars, wire fabric, and accessories for cast-in-place concrete.
1.2 – Related Sections
A. Section 03010 – Concrete Formwork.
B. Section 03030 – Cast-in-Place Concrete.
1.3 – References
A. ACI 301 – Structural Concrete for Buildings.
B. ACI 318 – Building Code Requirements for Reinforced Concrete.
C. ACI SP-66 – American Concrete Institute – Detailing Manual.
D. ANSI/ASTM A82 – Cold Drawn Steel Wire for Concrete Reinforcement.
E. ANSI/ASTM A184 – Fabricated Deformed Steel Bar Mats for Concrete Reinforcement.
F. ANSI/ASTM A185 – Welded Steel Wire Fabric for Concrete Reinforcement.
G. ANSI/AWS D1.4 – Structural Welding Code for Reinforcing Steel.
H. ASTM A615 – Deformed and Plain Billet Steel Bars for Concrete Reinforcement.
I. AWS D12.1 – Welding Reinforcement Steel, Metal Inserts, and Connections in Reinforced Concrete Construction.
1.4 – Submittals
Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
1.5 – Quality Assurance
Perform Work in accordance with ACI 301, ACI SP-66 and ACI 318.
1.6 – Coordination
A. Coordinate work under provisions of General Conditions.
B. Coordinate with placement of formwork, formed openings, and other Work.
C. Masonry Joint Reinforcement: ASTM A82, unfinished.
2.1 – Reinforcement
A. Reinforcing Steel: ASTM A615, 60 ksi yield grade, as noted on drawings; deformed billet steel bars, unfinished.
B. Welded Steel Wire Fabric: ASTM A185 plain type; in flat sheets; unfinished.
2.2 – Accessory Materials
A. Tie Wire: Minimum 16 gauge annealed type.
B. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during concrete placement conditions including load bearing pad on bottom to prevent vapor barrier puncture.
C. Special Chairs, Bolsters, Bar Supports, Spacers Adjacent to Weather Exposed Concrete Surfaces: Plastic coated steel type; size and shape as required.
2.3 – Fabrication
A. Fabricate concrete reinforcing in accordance with ACI SP-66 and ACI 318.
B. Weld reinforcement in accordance with ANSI/AWS D1.4 and ANSI/AWS D12.1.
C. Locate reinforcing splices not indicated on drawings, at point of minimum stress.
PART 3 – EXECUTION
3.1 – Placement
A. Place, support, and secure reinforcement against displacement. Do not deviate from required position.
B. Do not displace or damage vapor barrier.
C. Accommodate placement of formed openings.
D. Conform to ACI 318 code for concrete cover over reinforcement.
E. Chairs to be used for all welded-wire mesh in concrete slabs.
*** END OF SPECIFICATION 03020 ***
CAST-IN-PLACE CONCRETE – 03030
PART 1 – GENERAL
1.1 – Quality Assurance
1. Standards: Concrete work shall conform to the latest edition of the following standards and to the Contract Drawings and Specifications.
2. Uniform Building Code, as adopted and modified by the local governing authority.
3. American Concrete Institute "Manual of Concrete Practice", and publication ACI 318 "Building Code Requirements for Reinforced Concrete."
4. American Society for Testing and Materials, Standards as referenced herein.
A. Allowable Tolerances: Flatwork true to plane with maximum deviation of 1/4" in 10 feet, measured in any direction.
1.2 – Submittals
Ready-mix delivery tickets shall be given to the Project Superintendent for examination by the Government in three copies. The tickets shall contain the following information.
1. Number of cubic yards in batch.
2. Quantity and description of admixtures used.
3. Maximum size of aggregate.
4. Design compressive strength.
5. Gallons of water added at the site.
PART 2 – PRODUCTS
2.1 – Materials
A. Cement: Portland Cement, Type II, ASTM C150. Concrete shall have integral Davis color “Adobe”.
B. Aggregate
1. Standard weight aggregates conforming to requirements of ASTM C33.
2. Uniformly graded, clean and durable material free of organic matter or other deleterious substances.
3. The maximum size used in a particular location shall be consistent with the form and dimensions of the section being placed and with the method of compaction.
The aggregate sizes shall be such as will produce dense, uniform concrete, free of rock pockets, honeycombs and other irregularities unacceptable to an Architectural finished surface.
C. Water: Potable, free of harmful acids, alkalis, oils and organic substances.
D. Admixtures: No admixtures shall be used unless specifically requested by the General Contractor and approved by the Government. When used, the Contractor shall provide evidence from an independent testing laboratory which assures that the admixture will have no deleterious effect upon reinforced concrete; and which indicates chemical compounds, effects upon strength, durability, and resistance to weathering and wear, and curing time.
E. Expansion Joint Filler
1. Non-extruding, preformed type; thickness as shown on drawings.
2. Fiber joint filler may be used only with a rubber asphalt sealer. Do not use fiber material with a chemically-cured sealant.
F. Control Joint: Propose layout for Government approval.
2.2 – Mixes
A. Ready Mix Concrete: Transit mixed…