CONSTRUCTION STAGING
AREA, CONTACT OWNER FOR
APPROXIMATE LOCATION
ASSISTANT STATION DIRECTOR OF OPERATIONS DATE
SHEET OF
United States Department of Agriculture Forest Service
TRAVEL DIRECTIONS:
STATION ENGINEER DATE
PROGRAM MANAGER DATE
APPROVED:
RECOMMENDED BY:
PROJECT LOCATION
PROJECT SITE
5/
/2
4:
:1
P
M
ISSUE DATE:
A&E PROJECT NUMBER:
5/23/19
FIRE LAB
AIR QUALITY &
ELECTRONIC LAB
5775 US HIGHWAY 10W
MISSOULA, MT 58908
18075.00
PROJECT SITE: MISSOULA, MT
FROM THE CITY OF MISSOULA, TRAVEL NORTHWEST ON I-90 TOWARD FRENCHTOWN. TAKE EXIT 99 FROM I-90 W TO AIRWAY BLVD. TURN RIGHT ONTO W BROADWAY ST / US HIGHWAY 10W FOR APPROX 1.0 MILE. TURN LEFT TOWARD
THE SMOKEJUMPER VISITOR CENTER AND THE DESTINATION (FIRE LAB) IS ON YOUR LEFT.
OWNER
ARCHITECT
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
CHRIS MARTISON, PRINCIPAL-IN-CHARGE
SCOTT MOSES, PROJECT ARCHITECT
LUCAS YATCH, DESIGNER
A&E
222 NORTH HIGGINS
MISSOULA, MONTANA 59802
406.721.5643
US FOREST SERVICE
ROCKY MOUNTAIN RESEARCH STATION
5775 US HIGHWAY 10W
MISSOULA, MONTANA 59808
ERIC J. WEBBER, PE, LEED AP BD+C
MORRISON-MAIERLE, INC. 3011
1055 MOUNT AVE
MISSOULA, MONTANA 59801
406.542.4834
ARIAN C. BLOOMFIELD, PE, LEED AP BD+C, GGP
MORRISON-MAIERLE, INC.
1055 MOUNT AVE
MISSOULA, MONTANA 59801
406.542.4819
AB ANCHOR BOLT
ABV ABOVE
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT(URAL)
AWN AWNING
B/ BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM OR BENCHMARK
BRG BEARING
BTWN BETWEEN
BUR BUILT-UP ROOF
CAB CABINET
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
CONST CONSTRUCTION
CG CORNER GUARD
CPT CARPET
CSMT CASEMENT
CT CERAMIC TILE
D DEEP
DF DRINKING FOUNTAIN
DH DOUBLE HUNG
DIM(S) DIMENSIONS
DISP DISPENSER
DN DOWN
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DWG DRAWING
E EAST
EA EACH
EC EXISTING COLUMN
EJ EXPANSION JOINT
ELEC ELECTRICAL
EL ELEVATION
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
FACP FIRE ALARM CONTROL PANEL
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
F.F. FINISH FLOOR
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FND FOUNDATION
FP FIRE PROTECTION
FR FRAME
FRMG FRAMING
FT FEET/FOOT OR FIRE TREATED
FTG FOOTING
FTNG FOOTING
FRP FIBERGLASS REINFORCED
PANEL
FRT FIRE RETARDANT TREATED
GA GAUGE
GALV GALVANIZED
GB GYPSUM BOARD
GC GENERAL CONTRACTOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
GYP GYPSUM
HC HANDICAP
HDR HEADER
HDW HARDWARE
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR
CONDITIONING
HT HEIGHT
HTD HEATED
HVAC HEATING/VENTILATION & AIR
CONDITIONING
ID INSIDE DIAMETER
INFO INFORMATION
ISO ISOCYANURATE
INSUL INSULATE / INSULATED / INSULATION
INT INTERIOR
INV INVERT
JT JOINT
J-BOX JUNCTION BOX
KIT KITCHEN
L LONG / LENGTH
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LT LIGHT
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MECH MECHANIC(AL)
MEZZ MEZZANINE
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER OR OVERFLOW
DRAIN
OPNG OPENING
OPP OPPOSITE
OSB ORIENTED STRAND BOARD
OVHD OVERHEAD
PL PLATE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
POLY POLYESTER OR POLYOLEFIN
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED OR POINT
PVMT PAVEMENT
QT QUARRY TILE
QTR QUARTER
QTY QUANTITY
R RADIUS
RA RETURN AIR
RB RUBBER BASE
RD ROOF DRAIN
RECY RECYCLE(D)
REF REFERENCE
REFRIG REFRIGERATOR OR
REFRIGERATION
REINF REINFORCE
REQD REQUIRED
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SCHED SCHEDULED
SECT SECTION
SF SQUARE FEET
SFRM SPRAY APPLIED FIRE RESISTIVE
MATERIAL
SGL SINGLE
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SPECS SPECIFICATIONS
SOD SLAB ON DECK
SOG SLAB ON GRADE
SOH SAME OPPOSITE HAND
SS STAINLESS STEEL
ST STONE TILE
STD STANDARD
STND STANDARD
STL STEEL
STRUCT STRUCTURAL
TEMP TEMPERED
THK THICK
THRESH THRESHOLD
T.O. TOP OF
TOBM TOP OF BEAM
T.O.BM. TOP OF BEAM
T.O.P. TOP OF PLATE
T.O.S. TOP OF STEEL
T/ TOP OF
T&G TONGUE AND GROOVE
TEL TELEPHONE
THK THICK
TRANS TRANSOM
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNO UNLESS NOTED OTHERWISE
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
VWC VINYL WALL COVERING
W WIDE OR WEST
W/ WITH
WC WATER CLOSET
WD WOOD
WDW WINDOW
WG WALL GUARD
WH WATER HEATER
W/IN WITHIN
W/O WITHOUT
WP WATERPROOF
WR WATER RESISTANT
WT WEIGHT
WWF WELDED WIRE FABRIC
# NUMBER OR POUND
@ AT
WINDOW TAGROOM TAG
DOOR TAG KEYNOTE TAG
ASSEMBLY TAG
MATERIAL TAG
REVISION TAGREVISION CLOUD R
REF
ELE
V
G6S
M
K
W
CEILING TAG VIEW REFERENCEREF. #/A#.#
BUILDING
SECTION
WALL
SECTION
ELEVATION
GRID LINE
DETAIL
CALL OUT
INTERIOR
ELEVATION
EXTERIOR
ELEVATION
DETAIL
SECTION
#1
#2
#3
#4
A1.#15
POSITION OF VIEW ON
SHEET
SHEET OF ORIGIN
TYPICAL SHEET VIEW NUMBERING LAYOUTS
DETAIL NAME
1 1/2" = 1'-0"
VIEW
SCALE
VIEW NAME
ARCH D (24"x36")
A6.#
A3.#
A3.#
A3.#
A4.#
A3.#
ROOM NAME
101.1
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:1
P
M
G0.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
GENERAL
INFORMATION
18075.00
SM
LY
SM/LY
SHEET INDEXARCHITECTURAL ABBREVIATIONS
PROJECT TEAM
EXPLANATION OF SYMBOLS
ARCHITECTURAL
ELECTRICAL
MECHANICAL
PLUMBING
SHEET NO. SHEET NAME
G0.0 COVER SHEET
G0.1 GENERAL INFORMATION
D2.1 OVERALL DEMOLITION PLANS
D3.1 DEMOLITION ENLARGED PLAN AREA B
D3.2 DEMOLITION ENLARGED PLAN / SECTION AREA C
D7.1 DEMOLITION RCP
A2.1 OVERALL CONSTRUCTION FLOOR PLANS
A3.1 ENLARGED PLANS AREA B
A3.1F FLOOR FINISH PLANS AREA B
A3.2 ENLARGED PLANS AREA C
A3.2F FLOOR FINISH PLANS AREA C
A4.1 EXTERIOR ELEVATIONS / AREA C ROOF PLAN
A5.1 SECTIONS AREA C
A6.1 INTERIOR ELEVATIONS
A6.2 INTERIOR ELEVATIONS
A6.3 INTERIOR ELEVATIONS
A7.1 REFLECTED CEILING PLANS
A9.1 SCHEDULES
SHEET NO. SHEET NAME
DE2.1 LEVEL 1 ELECTRICAL DEMOLITION PLAN
E0.1 SYMBOLS AND ABBREVIATIONS
E2.1 ELECTRICAL WORK KEY PLANS
E2.2 LEVEL 1 ENLARGED POWER PLAN
E2.3 LEVEL 1 ENLARGED POWER PLAN
E2.4 LEVEL 2 & BASEMENT POWER PLANS
E2.5 LEVEL 1 SIGNAL PLAN
E2.6 AREA C SIGNAL PLAN
E7.1 LEVEL 1 LIGHTING PLAN
E9.0 ONE-LINE DIAGRAM
E9.1 ONE-LINE DIAGRAM
E9.2 DETAILS
E9.3 PANEL SCHEDULES
E9.4 PANEL SCHEDULES
E9.5 PANEL SCHEDULES
E9.6 PANEL SCHEDULES
E9.7 PANEL SCHEDULES
E9.8 PANEL SCHEDULES
E9.9 PANEL SCHEDULES
E9.10 PANEL SCHEDULES
E9.11 PANEL SCHEDULES
E9.12 PANEL SCHEDULES
E9.13 PANEL SCHEDULES
E9.14 PANEL SCHEDULE/DETAILS
SHEET NO. SHEET NAME
DM2.0 OVERALL HVAC DEMOLITION PLAN - BASEMENT
DM2.1 OVERALL HVAC DEMOLITION PLAN - LEVELS 1 AND 2
DM3.1 ENLARGED HVAC DEMOLITION PLANS - AREA B
DM3.2 ENLARGED HVAC DEMOLITION PLANS - AREA B
DM3.3 ENLARGED HVAC DEMOLITION PLANS - AREA C
M0.1 MECHANICAL COVER SHEET
M2.0 OVERALL HVAC PLAN - BASEMENT
M2.1 OVERALL HVAC PLAN - LEVELS 1 AND 2
M3.1 ENLARGED HVAC PLANS - AREA B
M3.2 ENLARGED HVAC PLANS - AREA B
M3.3 ENLARGED HVAC PLANS - AREA C
M3.4 ENLARGED HVAC PLANS - LEVEL 2
M9.1 MECHANICAL SCHEDULES
M9.2 MEP COORDINATION
M9.3 MECHANICAL DETAILS
M9.4 MECHANICAL CONTROL DETAILS
M9.5 MECHANICAL CONTROL DETAILS
M9.6 MECHANICAL CONTROL DETAILS
SHEET NO. SHEET NAME
DP2.1 OVERALL PLUMBING DEMOLITION PLAN - LEVEL 1
DP3.1 ENLARGED PLUMBING DEMOLITION PLANS - AREAS B AND C
P2.0 OVERALL PLUMBING PLAN - BASEMENT
P2.1 OVERALL PLUMBING PLAN - LEVEL 1
P3.1 ENLARGED PLUMBING PLANS - AREA B
P3.2 ENLARGED PLUMBING PLANS - AREA C
P9.1 PLUMBING SCHEDULES AND DETAILS
ALTERNATES
1. B-WING & C-WING CARPET FLOORING REPLACEMENT
2. 1ST FLOOR B-WING WINDOW REPLACEMENT / NEW ROLLER WINDOW SHADES
3. 2ND FLOOR B-WING WINDOW REPLACEMENT / NEW ROLLER WINDOW SHADES
4. HANDRAIL UPGRADE FOR STAIRWELLS IN B-WING TO MEET ADA/ABA
5. FIBER OPTIC CABLE CONNECTIVITY REPLACEMENT
6. LABORATORY EQUIPMENT - TANK RACKS
1. ASBESTOS ABATEMENT WILL BE REQUIRED BY THE GENERAL CONTRACTOR, REFER TO
REPORTS IN THE PROJECT MANUAL FOR ADDITIONAL INFO.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE
OF WORK.
3. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND
LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY
SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE
CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE.
5. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL
EXPENSE TO OWNER
6. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING
OR ON THE SITE.
7. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS
ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF
WORKERS AND PUBLIC.
8. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
9. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
10. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS. INCLUDING FS CIO.
11. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND
SHORING.
12. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT
OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR
PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
13. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS
REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT
MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
14. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO
NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
15. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
16. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL
ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED
ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND
PROVIDE ANY SHORING, BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH
STRUCTURAL ENGINEER AS REQUIRED.
17. IT IS THE OWNER'S INTENT TO OPERATE ON SITE THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE WITH OWNER ON PHASING, AND SCHEDULING OF WORK AS NOT TO CONFLICT
WITH THE AIRPORT OPERATIONS.
18. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS.
19. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION
AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
20. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE
STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES.
CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT.
IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED
SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE
DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY
NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
21. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS
MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE.
22. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO
DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES,
SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO
PREVENT NEW CONSTRUCTION DELAYS.
23. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL
RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
24. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM
CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE
CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH,
OR AS NOTED HEREIN.
26. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
27. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM
OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO
DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO
CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL
INFORMATION.
28. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
29. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES,
TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE.
PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
INDICATES BUILT ITEM TO BE REMOVED
DEMO (E) FLOOR FINISH
DEMO (E) CARPET ALT-1
A
C
E
F
123456
G
H
J
78910111220
(E) LOBBY &
DISPLAY
101 B
(E) OFFICE
118 B
(E) OFFICE
119 B
(E) OFFICE
120 B
(E) OFFICE
121 B
(E) OFFICE
122 B
(E) OFFICE
123 B
(E) OFFICE
124 B
(E) OFFICE
125 B
(E) MEN'S RR
126 B
(E) WOMENS
RR
127 B
(E) OFFICE
129 B
(E) OFFICE
104 B
(E) RECIVING
& SHIPPING
106 B
(E) JAN
107 B
D3.1
D3.1
D3.2
(E) OFFICE
128 B
(E) OFFICE
105 B
01-02
01-04
01-04
(E) OFFICE
108B
(E) DARK
ROOM
109B
(E) OFFICE
110B
(E) OFFICE
111B (E)
INSTRUMENT
CALIBRATION
113 B
(E) OFFICE
113-1 B
(E)
INSTRUMENT
DEV. LAB
115 B
(E) TOILET
102 B
(E) STORAGE
101 C
(E) HALL
104 C
(E) OFFICE
108 C
(E) OFFICE
106 C
(E) OFFICE
106 C
UP
UP
A
C
E
F
123456789101112
DN
D N
(E) OFFICE
212 B
(E) OFFICE
213 B
(E) OFFICE
211 B
(E) OFFICE
215 B
(E) OFFICE
216 B
(E) OFFICE
217 B
(E) OFFICE
218 B
(E) OFFICE
219 B
(E) OFFICE
220 B
(E) MENS
221 B
(E) WOMEN
222 B
(E) OFFICE
223 B
(E) OFFICE
224 B
(E) OFFICE
201 B
(E) OFFFICE
203 B
(E) STOCK
ROOM
204 B
(E) OFFICE
206-2 B
(E) OFFICE
206-3 B
(E) OFFICE
207 B
(E) CONF. RM.
208 B
(E) CONF. RM.
209.1 B
(E)
CONFERENCE
ROOM
209-2 B
(E) MAIL RM
210 B
(E) PASSAGE
211 B
(E) CORRIDOR
200 B
01-03
01-04
01-04
A
B
C
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:1
P
M
D2.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
OVERALL
DEMOLITION PLANS
18075.00
SM
LY
SM/LY
GENERAL NOTES
KEYNOTES
LEGEND
01-02 ALT-2. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 1ST FLOOR
01-03 ALT-3. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 2ND FLOOR
01-04 ALT-4. HANDRAIL UPGRADE FOR STAIRWELLS IN B-WING TO MEET ADA/ABA, SEE
DETAIL (1/A2.1), (5/A2.1)
1/16" = 1'-0"6 OVERALL DEMOLITION FIRST FLOOR PLAN NORTH
0'16' 8' 16' 32'
NORTH
0'16' 8' 16' 32'1/16" = 1'-0"14 OVERALL DEMOLITION SECOND FLOOR PLANKEYPLAN AREA B AND C
C
E
F
91011
MOVE (E) FUME HOOD,
SEE ENLARGED PLANS.
01-03
02-02
02-02
02-02
02-02
02-02
02-02
02-02
(E)
INSTRUMENT
VAULT
114 B
02-26
02-26
02-07
02-14
(E) AEROSOLS
LAB
113 B
(E) OFFICE
113-1 B
(E)
INSTRUMENT
DEV. LAB
115 B
C
E
F
02-02
02-02
02-28
02-02
02-02
02-02
02-03 02-03
02-02
02-02
01-02
(E) RECIVING
& SHIPPING
106 B
02-26
02-07
02-08
ALIGN WITH LEFT WALL
02-13
02-12
02-14
(E) OFFICE
108B
(E) DARK
ROOM
108B
(E) OFFICE
110B
(E) OFFICE
111B
(E)110B.1
02-27
02-28
02-28
02-28
1. ASBESTOS ABATEMENT WILL BE REQUIRED BY THE GENERAL CONTRACTOR, REFER TO
REPORTS IN THE PROJECT MANUAL FOR ADDITIONAL INFO.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE
OF WORK.
3. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND
LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY
SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE
CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE.
5. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL
EXPENSE TO OWNER
6. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING
OR ON THE SITE.
7. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS
ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF
WORKERS AND PUBLIC.
8. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
9. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
10. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS. INCLUDING FS CIO.
11. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND
SHORING.
12. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT
OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR
PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
13. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS
REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT
MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
14. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO
NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
15. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
16. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL
ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED
ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND
PROVIDE ANY SHORING, BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH
STRUCTURAL ENGINEER AS REQUIRED.
17. IT IS THE OWNER'S INTENT TO OPERATE ON SITE THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE WITH OWNER ON PHASING, AND SCHEDULING OF WORK AS NOT TO CONFLICT
WITH THE AIRPORT OPERATIONS.
18. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS.
19. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION
AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
20. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE
STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES.
CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT.
IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED
SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE
DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY
NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
21. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS
MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE.
22. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO
DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES,
SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO
PREVENT NEW CONSTRUCTION DELAYS.
23. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL
RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
24. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM
CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE
CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH,
OR AS NOTED HEREIN.
26. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
27. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM
OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO
DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO
CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL
INFORMATION.
28. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
29. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES,
TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE.
PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
INDICATES BUILT ITEM TO BE REMOVED
DEMO (E) FLOOR FINISH
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:1
P
M
D3.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
DEMOLITION
ENLARGED PLAN
AREA B
18075.00
SM
LY
SM/LY
1/4" = 1'-0"14 LEVEL 1 DEMO - ENLARGED WEST
1/4" = 1'-0"5 LEVEL 1 DEMO - ENLARGED EAST
GENERAL NOTES
KEYNOTES
LEGEND
01-02 ALT-2. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 1ST FLOOR
01-03 ALT-3. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 2ND FLOOR
02-02 DEMO (E) CASEWORK
02-03 DEMO (E) SHELVING
02-07 DEMO (E) WALL PARTITION
02-08 REMOVE (E) DOOR / DOOR FRAME & SALVAGE FOR REUSE
02-12 (E) FUME HOOD TO REMAIN
02-13 DEMO (E) WALL FOR DOOR
02-14 DEMO (E) PLUMBING FIXTURE
02-26 REMOVE (E) DOOR / DOOR FRAME
02-27 DEMO (E) DI WATER UNIT AND RETURN TO GOVERNMENT
02-28 OWNER TO REMOVE SHELVING
NORTH
0'4' 2' 4' 8'
NORTH
0'4' 2' 4' 8'
D2.1
F
G
HH
JJ
(E) MAIL
ROOM
109 C
02-26
02-07
02-26
02-14
02-15
02-14
02-14
02-15
02-15
(E) MECH/ STOR
103 C
(E) OFFICE
107 C
(E) OFFICE
105 C
02-17
02-26
D3.2
D3.2
02-22
02-26
02-2602-26
02-26 02-08
02-0702-09
02-09
02-07
(E) SERVER
ROOM
106 C
(E) OFFICE
108 C
104 C
(E) CORRIDOR
(E) JANITOR
CLOSET
102A C
RESTROOM /
SHWR
102 C
(E) CORRIDOR
101 C
02-23
02-25
02-04
(E )1
C
.1
01-06 01-0601-06
01-06
01-06
01-06
01-06 01-06 01-06
01-06
1. ASBESTOS ABATEMENT WILL BE REQUIRED BY THE GENERAL CONTRACTOR, REFER TO
REPORTS IN THE PROJECT MANUAL FOR ADDITIONAL INFO.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE
OF WORK.
3. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND
LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY
SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE
CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE.
5. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL
EXPENSE TO OWNER
6. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING
OR ON THE SITE.
7. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS
ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF
WORKERS AND PUBLIC.
8. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
9. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
10. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS. INCLUDING FS CIO.
11. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND
SHORING.
12. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT
OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR
PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
13. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS
REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT
MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
14. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO
NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
15. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
16. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL
ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED
ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND
PROVIDE ANY SHORING, BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH
STRUCTURAL ENGINEER AS REQUIRED.
17. IT IS THE OWNER'S INTENT TO OPERATE ON SITE THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE WITH OWNER ON PHASING, AND SCHEDULING OF WORK AS NOT TO CONFLICT
WITH THE AIRPORT OPERATIONS.
18. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS.
19. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION
AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
20. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE
STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES.
CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT.
IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED
SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE
DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY
NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
21. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS
MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE.
22. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO
DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES,
SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO
PREVENT NEW CONSTRUCTION DELAYS.
23. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL
RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
24. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM
CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE
CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH,
OR AS NOTED HEREIN.
26. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
27. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM
OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO
DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO
CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL
INFORMATION.
28. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
29. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES,
TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE.
PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
INDICATES BUILT ITEM TO BE REMOVED
DEMO (E) FLOOR FINISH
LEVEL 1
100' - 0"
LEVEL 2
111' - 8"
02-07 02-1902-0602-21 02-0402-07
01-06 01-06
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:1
P
M
D3.2
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
DEMOLITION
ENLARGED PLAN /
SECTION AREA C
18075.00
SM
LY
SM/LY
NORTH
0'4' 2' 4' 8'
GENERAL NOTES
KEYNOTES
LEGEND
01-06
02-04
02-06
02-07
02-08
02-09
02-14
02-15
02-17
02-19
02-21
02-22
02-23
02-25
02-26
NOT USED
DEMO (E) STOREFRONT WINDOW
DEMO (E) SUSPENDED CEILING
DEMO (E) WALL PARTITION
REMOVE (E) DOOR / DOOR FRAME & SALVAGE FOR REUSE
DEMO (E) BORROWED LITE & GLAZING
DEMO (E) PLUMBING FIXTURE
DEMO (E) SHOWER AND ENCLOSURE
DEMO (E) COMPRESSOR AND STEEL ENCLOSURE, REF MECH.
DEMO (E) LIGHTWELL
DEMO (E) SKYLIGHT
DEMO (E) RAISED FLOOR
SAWCUT (E) CONCRETE FLOOR FOR NEW PLUMBING FIXTURES. SEE
PLUMBING DEMO (E) FURRING WALL OVER STOREFRONT WINDOW
REMOVE (E) DOOR / DOOR FRAME
1/4" = 1'-0"10 LEVEL 1 DEMO - ENLARGED AREA C
1/4" = 1'-0"14 AREA C DEMO SECTION
1. ASBESTOS ABATEMENT WILL BE REQUIRED BY THE GENERAL CONTRACTOR, REFER TO
REPORTS IN THE PROJECT MANUAL FOR ADDITIONAL INFO.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FAMILIARIZE HIMSELF/ HERSELF WITH THE SCOPE
OF WORK.
3. THE DEMOLITION NOTES PROVIDE A GENERAL DESCRIPTION OF THE ITEMS AND AREAS
REQUIRING REMOVAL. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL QUANTITIES AND
LOCATIONS OF ALL INDICATED ITEMS AS NECESSARY TO COMPLETE THE SCOPE OF WORK IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS.
4. COORDINATE WITH OWNER FOR ANY EQUIPMENT TO BE SALVAGED. UNLESS SPECIFICALLY
SCHEDULED FOR REUSE, DEMOLISHED MATERIALS SHALL BECOME THE POSSESSION OF THE
CONTRACTOR AND SHALL BE IMMEDIATELY REMOVED FROM THE SITE.
5. REMOVE MATERIALS FROM SITE AND DISPOSE OF IN A LEGAL MANNER AT NO ADDITIONAL
EXPENSE TO OWNER
6. DEBRIS FROM THE DEMOLITION SHALL NOT BE ALLOWED TO ACCUMULATE WITHIN THE BUILDING
OR ON THE SITE.
7. REMOVE FROM SITE ANY CONTAMINATED, VERMIN INFESTED, OR DANGEROUS MATERIALS
ENCOUNTERED AND DISPOSE OF BY SAFE MEANS SO AS NOT TO ENDANGER HEALTH OF
WORKERS AND PUBLIC.
8. BURNING OF MATERIALS ON SITE IS NOT PERMITTED.
9. CLEAN-UP: MUST MEET GOVERNING DUST CONTROL CODES.
10. NOTIFY AFFECTED UTILITY COMPANIES BEFORE STARTING WORK AND COMPLY WITH THEIR
REQUIREMENTS. INCLUDING FS CIO.
11. PREVENT MOVEMENT OR SETTLEMENT OF ADJACENT STRUCTURES. PROVIDE BRACING AND
SHORING.
12. CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE INCONVENIENCE TO ANY ADJACENT
OCCUPIED BUILDING OR SITE AS POSSIBLE AND WITH MINIMUM INTERFERENCE TO PUBLIC OR
PRIVATE ACCESSES. MAINTAIN PROTECTED EGRESS AND ACCESS AT ALL TIMES.
13. CONTRACTOR SHALL PROVIDE TEMPORARY DUST AND CONSTRUCTION SEPARATION WALLS AS
REQUIRED TO SHIELD THE PUBLIC FROM NOISE, DUST, WEATHER, AND OTHER HAZARDS THAT
MAY BE EXPOSED AS A RESULT OF THE DEMOLITION WORK.
14. PERFORM CUTTING OF EXISTING CONCRETE AND MASONRY WITH SAWS AND CORE DRILLS. DO
NOT USE JACK-HAMMERS EXCEPT WHERE PERMITTED BY OWNER.
15. BREAK CONCRETE AND MASONRY INTO SECTIONS LESS THAN 3 FEET IN ANY DIMENSION.
16. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO INSURE EXISTING STRUCTURAL
ELEMENTS REMAIN UNDAMAGED THROUGHOUT CONSTRUCTION, UNLESS SPECIFICALLY NOTED
ON DEMOLITION PLAN. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO IDENTIFY AND
PROVIDE ANY SHORING, BRACING, OR TEMPORARY STRUCTURE, AND TO COORDINATE WITH
STRUCTURAL ENGINEER AS REQUIRED.
17. IT IS THE OWNER'S INTENT TO OPERATE ON SITE THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE WITH OWNER ON PHASING, AND SCHEDULING OF WORK AS NOT TO CONFLICT
WITH THE AIRPORT OPERATIONS.
18. ALL PUBLIC UTILITIES TO REMAIN IN OPERATION THROUGHOUT CONSTRUCTION. CONTRACTOR
TO COORDINATE ANY TEMPORARY SERVICES REQUIRED TO MAINTAIN BUSINESS OPERATIONS.
19. SEE ENGINEERING DRAWINGS FOR DUCTWORK, DIFFUSER, PLENUM BOX, ETC. DEMOLITION
AND/OR PROTECTION. COORDINATE WITH MECHANICAL ENGINEER.
20. FIRE SAFETY MUST BE MAINTAINED FOR ALL PERSONNEL WORKING ON THE FLOOR. ALL FIRE
STAIRS, ALARMS, SPEAKERS, ETC. MUST REMAIN ACCESSIBLE AND OPERABLE AT ALL TIMES.
CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT THIS EQUIPMENT.
IMMEDIATELY NOTIFY BUILDING SECURITY AND BUILDING MANAGER OF DAMAGED OR DISABLED
SYSTEMS AND REPAIR OR REPLACE DAMAGED SYSTEMS IMMEDIATELY. RELOCATION OF SMOKE
DETECTORS, PUBLIC ADDRESS SPEAKERS AND FIRE ALARM EQUIPMENT, NECESSITATED BY
NEW CONSTRUCTION, SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, AND PER THE PLANS.
21. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL, CLARIFY THE POINT IN
QUESTION WITH THE OWNER BEFORE PROCEEDING. IMMEDIATELY STOP WORK IF HAZARDOUS
MATERIALS ARE FOUND AND CONTACT THE OWNER'S REPRESENTATIVE.
22. REMOVAL OF ANY EQUIPMENT, CABLING SWITCHES, AND CONDUIT PERTAINING TO
DATA/COMMUNICATIONS AND TELEPHONE SHALL BE VERIFIED WITH TELEPHONE COMPANIES,
SERVICE OWNER OR TENANT DATA/COMMUNICATIONS REPRESENTATIVE AS REQUIRED TO
PREVENT NEW CONSTRUCTION DELAYS.
23. PROVIDE FOR FIRE PROOFING REPAIR AS REQUIRED AT STRUCTURAL STEEL, TO THE ORIGINAL
RATING WHERE CONSTRUCTION TRADES REMOVE EXISTING FIRE PROOFING. REPAIR ANY
DAMAGE OR PENETRATIONS IN RATED ASSEMBLIES TO CONFORM TO THEIR ORIGINAL LISTING
REQUIREMENTS AND TO MAINTAIN FIRE PROTECTION AND SEPARATION AS ORIGINALLY
DESIGNED.
24. AT COMPLETION OF DEMOLITION WORK, THE CONSTRUCTION AREA(S) SHALL BE LEFT IN "BROOM
CLEAN" CONDITION. ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE
CAUSED BY HIM OR HIS SUBCONTRACTORS. REFINISH TO MATCH EXISTING ADJACENT FINISH,
OR AS NOTED HEREIN.
26. FOR AREAS NOT IN DEMOLITION SCOPE OF WORK, PROTECT AS REQUIRED, ALL SURFACES, EQUIPMENT, FIXTURES AND HARDWARE DURING DEMOLITION AND/OR CONSTRUCTION.
27. PRIOR TO DEMOLITION, INVESTIGATE WALLS FOR CONCEALED PIPING AND INFORM
OWNER/ARCHITECT OF ANY CONDITION NOT DOCUMENTED IN CONTRACT DRAWINGS. DEMO
DESIGNATED WALL BASES, WALL FRAMING, BATT INSULATION AND GYPSUM BOARD. DEMO
CONDUITS AND RECEPTACLES, REFERENCE ELECTRICAL DEMO PLAN FOR ADDITIONAL
INFORMATION.
28. ALL EXISTING DIRECTIONAL SIGNAGE TO BE REMOVED UNLESS NOTED OTHERWISE.
29. WHERE NOTED, REMOVE FLOORING DOWN TO TOP OF CONC. SLAB, INCLUDING ADHESIVES,
TRANSITION STRIPS, AND OTHER ASSOCIATED ELEMENTS, TYP., UNLESS NOTED OTHERWISE.
PREPARE REMAINING SURFACES TO RECEIVE NEW FINISHES.
A
C
E
F
G
H
J
789101112
(E) WOMENS
RR
127 B
(E) MEN'S RR
126 B
(E) RECIVING
& SHIPPING
106 B
(E)
INSTRUMENT
VAULT
114 B
(E) LOBBY &
DISPLAY
101 B
(E) OFFICE
118 B
(E) OFFICE
119 B
(E) OFFICE
120 B
(E) OFFICE
121 B
(E) OFFICE
122 B
(E) OFFICE
123 B
(E) OFFICE
124 B
(E) OFFICE
125 B
02-21
02-19
(E) OFFICE
108B
(E) DARK
ROOM
108B
(E) OFFICE
110B
(E) OFFICE
111B
(E)
INSTRUMENT
CALIBRATION
113 B
(E) OFFICE
113-1 B
(E)
INSTRUMENT
DEV. LAB
115 B
D3.2
D3.2
(E) OFFICE (E) OFFICE
(E) SERVER
ROOM
(E) OFFICE
(E) CORRIDOR
(E) JANITOR
CLO(E) MAIL
ROOM
109 C 102A C
(E) MECH /
STOR
103C
RESTROOM /
SHWR
102 C
(E) CORRIDOR
101 C
104 C
105 C 107 C
108 C 106 C
DEMO (E) ACOUSTIC CEILING TILE & SUSPENSION SYSTEM
INDICATES BUILT ITEM TO BE REMOVED
A
B
C
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:1
P
M
D7.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
DEMOLITION RCP
18075.00
SM
LY
SM/LY
GENERAL NOTES
KEYNOTES
LEGEND
1/8" = 1'-0"9 DEMOLITION FIRST FLOOR REFLECTED CEILING PLAN NORTH
0'8' 4' 8' 16'
KEYPLAN AREA B AND C
02-19 DEMO (E) LIGHTWELL
02-21 DEMO (E) SKYLIGHT
P F
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO
FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL
COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL,
STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS.
4. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A
UNIFORM APPEARANCE AND SEAMLESS TRANSITION.
5. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
6. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
7. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE BUILDING
CONSTRUCTION.
8. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
9. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
10. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR
SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED SYSTEM(S) .
11. REFER TO DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
12. LOCATE THE HINGE SIDE JAMB OF DOORS 6" FROM ADJACENT PERPENDICULAR WALL,
UNLESS NOTED OTHERWISE.
13. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
A
C
E
F
123456
G
H
J
789101112
AEROSOLS
LAB
113 B
(E)
INSTRUMENT
VAULT
114 B
ELECTRONICS
LAB
115 B
GC LAB
112 B CONF RM./
LIBRARY
108 B
KITCHENETTE
109 B
A3.1
A3.1
A3.2
(E) OFFICE
129 B
(E) OFFICE
128 B
(E) OFFICE
104 B
(E) OFFICE
105 B
(E) RECIVING
& SHIPPING
106 B
OPEN OFFICE
108 C
(E) LOBBY &
DISPLAY
101 B
(E) OFFICE
118 B
(E) OFFICE
119 B
(E) OFFICE
120 B
(E) OFFICE
121 B
(E) OFFICE
122 B
(E) OFFICE
123 B
(E) OFFICE
124 B
(E) OFFICE
125 B
(E) MEN'S RR
126 B
(E) WOMENS
RR
127 B
A3.2F
A3.1F
A3.1F
(E) MAIL
ROOM
109 C
SERVER
ROOM
106 C
01-04
01-04
A
C
E
F
123456789101112
DN
D N
(E) OFFICE
212 B
(E) OFFICE
213 B
(E) OFFICE
211 B
(E) OFFICE
215 B
(E) OFFICE
216 B
(E) OFFICE
217 B
(E) OFFICE
218 B
(E) OFFICE
219 B
(E) OFFICE
220 B
(E) MENS
221 B
(E) WOMEN
222 B
(E) OFFICE
223 B
(E) OFFICE
224 B
(E) OFFICE
201 B
(E) OFFFICE
203 B
(E) STOCK
ROOM
204 B
(E) OFFICE
206-2 B
(E) OFFICE
206-1 B
(E) OFFICE
206-3 B
(E) OFFICE
207 B
(E) CONF. RM.
208 B
(E) CONF. RM.
209.1 B
(E)
CONFERENCE
ROOM
209-2 B
(E) MAIL RM
210 B
(E) PASSAGE
211 B
(E) CORRIDOR
200 B
01-04
01-04
ALT 1 - NEW TILE CARPETING, REF ROOM FINISH SCHED FOR ADD'L INFO.
REFERENCE ENLARGED FLOOR FINISH PLAN FOR BASE BID TILE CARPETING
A
B
C
1' - 0"1' - 0"
3'
WRAP HANDRAIL AROUND INSIDE
WALL AT STAIR RETURN MEZZANINE
1' - 0"
1' - 0"
WRAP HANDRAIL AROUND
INSIDE WALL AT STAIR
RETURN MEZZANINE
T Y
P
0'
/2
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A2.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
OVERALL
CONSTRUCTION
FLOOR PLANS
18075.00
SM
LY
SM/LY
GENERAL NOTES
KEYNOTES
LEGEND
01-04 ALT-4. HANDRAIL UPGRADE FOR STAIRWELLS IN B-WING TO MEET
ADA/ABA, SEE DETAIL (1/A2.1), (5/A2.1)
NORTH
0'16' 8' 16' 32'
1/16" = 1'-0"6 OVERALL CONSTRUCTION FIRST FLOOR PLAN NORTH
0'16' 8' 16' 32'
1/16" = 1'-0"14 OVERALL CONSTRUCTION SECOND FLOOR PLANKEYPLAN AREA B AND C
3/8" = 1'-0"1 STAIR HANDRAIL SECTION ALT-4
3/8" = 1'-0"5 STAIR HANDRAIL PLAN ALT-4
E
A6.1
A6.1
5 2
A6.1
CONF RM./
LIBRARY
108 B
GC LAB
112 B
KITCHENETTE
109 B
230 V230 V230 V230 V
(E) FUME HOOD12-06
12-07
12-08
02-05
11-01
11-02
230 V
9B
.1(FUTURE) FUME
HOOD
A6.1 9
A6.1 10
A6.1
A-3
22-03
02-20
11-05 11-05 11-05
11-02
10-20
11-07
11-02 11-02
12-07 12-07
CL CL CL
2' - 1" 8' - 2" 5' - 0" 2' - 10" 5' - 0" 2' - 10" 5' - 0" 2' - 10" 6' - 5" 2' - 1"
/4
2'
2'
9' - 0"
C
E
F
91011
A6.2
12 10
A6.2
8AEROSOLS
LAB
113 B
(E)
INSTRUMENT
VAULT
114 B
ELECTRONICS
LAB
115 B
12-04
230 V230 V
A6.2
A6.2
A6.2
A6.2
A6.2
A6.2
11-02
11-02
12-04
23-02
A-3
10-2010-20
02-12
11-05
6' - 2"
2'
0"
8'
2'
2' - 1" 13' - 10"20' - 2" 2' - 1"
14' - 2"
2'
0"
9' - 2"
2'
3'
2' - 1"
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO
FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL
COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL,
STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS.
4. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A
UNIFORM APPEARANCE AND SEAMLESS TRANSITION.
5. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
6. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
7. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE BUILDING
CONSTRUCTION.
8. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
9. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
10. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR
SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED SYSTEM(S) .
11. REFER TO DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
12. LOCATE THE HINGE SIDE JAMB OF DOORS 6" FROM ADJACENT PERPENDICULAR WALL,
UNLESS NOTED OTHERWISE.
13. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
ITEM ABOVE
EXISTING WALL
NEW WALL
SYMBOL:
3 1/2" (3)
IF INFILL MATCH (E) WALL THICKNESS
A-3
A SERIES PARTITION
A
FIN. FLOOR, TYP.
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
METAL STUD W/ 5/8"
IMPACT RESISTANT
GYP. BOARD EACH
SIDE
SLIP TRACK
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A3.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
ENLARGED PLANS
AREA B
18075.00
SM
LY
SM/LY
1/4" = 1'-0"5 ENLARGED PLAN EAST
1/4" = 1'-0"13 ENLARGED PLAN WEST
GENERAL NOTES
KEYNOTES
LEGEND
02-05 REUSE (E) REFRIGERATOR
02-12 (E) FUME HOOD TO REMAIN
02-20 INFILL (E) DOOR OPENING TO MATCH (E) WALL
10-20 2-A RATED FIRE EXTINGUISHER W/ CABINET
11-01 DI WATER SYSTEM, OWNER SUPPLIED
11-02 SNORKEL FUME HOOD
11-05 GAS CYLINDER RACK, (ALT-6)
11-07 UNDERCOUNTER LAB FRIDGE, OWNER SUPPLIED
12-04 ISLAND WOOD LAB CASEWORK
12-06 FULL HEIGHT CABINETS
12-07 34" WIDE WORK SURFACE, EPOXY RESIN
12-08 EPOXY RESIN COUNTERTOPS
22-03 EMERGENCY EYE WASH STATION / SHOWER
23-02 (E) FUME HOOD, NEW LOCATION
NORTH
0'4' 2' 4' 8'
NORTH
0'4' 2' 4' 8'
A2.1
C
E
CONF RM./
LIBRARY
108 B
GC LAB
112 B
KITCHENETTE
109 B
9B
.1
(E) RECIVING
& SHIPPING
106 B
09-03
C
E
F
91011
AEROSOLS
LAB
113 B
(E)
INSTRUMENT
VAULT
114 B
ELECTRONICS
LAB
115 B
09-03
09-03
CT-1, CERAMIC TILING
SCRF-1, STATIC-CONTROL RESILIENT FLOORING
TC-1, TILE CARPETING
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A3.1F
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
FLOOR FINISH
PLANS AREA B
18075.00
SM
LY
SM/LY
1/4" = 1'-0"5 ENLARGED EAST FINISH FLOOR PLAN
1/4" = 1'-0"13 ENLARGED WEST FINISH FLOOR PLAN
NORTH
0'4' 2' 4' 8'
NORTH
0'4' 2' 4' 8'
KEYNOTES
LEGEND
09-03 CONTINUE FLOORING UNDER SINK CASEWORK
GG
HH
JJ
A6.3
5(E) MAIL
ROOM
109 C
22-02
RESTROOM /
SHWR
102 C
10-02
10-01 10-11
02-20
(E) MECH /
STOR
103C
(E) CORRIDOR
101 C
24' - 3 1/2"
OPEN OFFICE
108 C
A5.1
A5.1
SERVER
ROOM
106 C
ALIGN (N) WALL W/
(E) DEMOLISHED
WALL
3'
M
IN
8' - 5" 3' - 6" 5' - 10"
A6.3
A6.3
A-3
A-3
6C
.1
2.
1C .1
102C.1
B-4
B-4 B-4
JANITOR
102.1 C
A3.2
A3.2
A3.2
10-21
10-20
3' - 2"
3'
/4
A5.1
1/
4"
ITEM ABOVE
EXISTING WALL
NEW WALL
1. REFER TO STRUCTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION. ALL INFORMATION REGARDING EXISTING CONDITIONS IS BASED UPON
OWNER-SUPPLIED DOCUMENTS AND MAY NOT PRECISELY REFLECT FIELD CONDITIONS.
2. THE CONTRACTOR SHALL NOT CONSIDER CONSTRUCTION NOTES TO BE ALL-INCLUSIVE.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT AND ASSESS EACH AREA AND TO
FULFILL THE INTENT OF THE CONTRACT DOCUMENTS. CONTRACTOR SHALL
COORDINATE ARCHITECTURAL CONSTRUCTION DRAWING AND NOTES WITH CIVIL,
STRUCTURAL AND MECHANICAL, ELECTRICAL & PLUMBING NOTES AND DRAWINGS.
3. FIELD VERIFY ALL DIMENSIONS. DO NOT SCALE DRAWINGS.
4. ALL FINISHES AND MATERIALS SHALL BE PROPERLY INTEGRATED TO ENSURE A
UNIFORM APPEARANCE AND SEAMLESS TRANSITION.
5. PROVIDE ALL BACKING FOR MILLWORK, GRAB BARS, AND ANY AND ALL WALL MOUNTED
EQUIPMENT OR ACCESSORIES; COORDINATE LOCATIONS.
6. ALL DIMENSIONS ARE FROM STRUCTURAL OR UNFINISHED FACE OF STUD, UNLESS
OTHERWISE NOTED.
7. GENERAL CONTRACTOR SHALL COORDINATE ALL ASPECTS OF THE BUILDING
CONSTRUCTION.
8. PROVIDE A SMOOTH AND LEVEL FINISH FLOOR, TYP. PATCH AND REPAIR ALL
INCONSISTENCIES IN FLOOR ELEVATIONS.
9. PATCH AND REPAIR ANY / ALL WALL SURFACES AS REQUIRED TO PROVIDE SUITABLE
SUBSTRATE FOR FINISHES.
10. U.L. ASSEMBLIES DESCRIBED ARE FOR REFERENCE ONLY. THE GENERAL CONTRACTOR
SHALL COORDINATE AND VERIFY THE INSTALLATION OF THE DESCRIBED SYSTEM(S) .
11. REFER TO DOOR SCHEDULE FOR ADDITIONAL INFORMATION.
12. LOCATE THE HINGE SIDE JAMB OF DOORS 6" FROM ADJACENT PERPENDICULAR WALL,
UNLESS NOTED OTHERWISE.
13. PROVIDE ACOUSTICAL SEALANT AROUND WALL EDGES, TOP AND BOTTOM, AND
PENETRATIONS, AND INSTALL PUTTY PADS AROUND ELECTRICAL BOXES WHERE
PARTITION CONTAINS ACOUSTICAL INSULATION.
SYMBOL:
3 1/2" (3)
IF INFILL MATCH (E) WALL THICKNESS
A-3
A SERIES PARTITIONA
FIN. FLOOR, TYP.
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
METAL STUD W/ 5/8"
IMPACT RESISTANT
GYP. BOARD EACH
SIDE
SLIP TRACK
SYMBOL: B-4
B SERIES PARTITIONB
FIN. FLOOR, TYP.
UNDERSIDE OF DECK
OR BEAM ABOVE, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
CONT. SEALANT
BOTH SIDES, TYP.
4" X 8" X 16" CMU
BLOCK, TOOL JOINT
ROOM SIDE ONLY
IF INFILL, MATCH (E) WALL THICKNESS
4" (4)
G
(E) METAL FRAME FURRING
WALL
GYP. WALL RETURN
CAULK
(E) CMU WALL
(E) CMU WALL
CMU INFILL MATCH (E) WALL
(E) FURRING WALL
NEW FURRING WALL
(E) FURRED OUT WALL
5/8" GYP RETURN
(E) STOREFRONT WINDOW
CAULK
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A3.2
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
ENLARGED PLANS
AREA C
18075.00
SM
LY
SM/LY
1/4" = 1'-0"9 ENLARGED AREA C PLAN NORTH
0'4' 2' 4' 8'
GENERAL NOTES
KEYNOTES
LEGEND
02-20 INFILL (E) DOOR OPENING TO MATCH (E) WALL
10-01 36" HORIZONTAL GRAB BAR
10-02 42" HORIZONTAL GRAB BAR
10-11 COMBINATION TRASH RECEPTACLE/PAPER
TOWEL DISPENSER
10-20 2-A RATED FIRE EXTINGUISHER W/ CABINET
10-21 4-A RATED FIRE EXTINGUISHER W/ CABINET
22-02 24" X 24" MOP SINK W/ STAINLESS STEEL
BACKSPLASH
A2.1
3" = 1'-0"13 FURRED WALL @ CMU
3" = 1'-0"14 INFILL DOOR @ CMU WALL
3" = 1'-0"15 STOREFRONT WINDOW JAM / SILL / HEAD
A3.2 A3.2 A3.2
G
H
J
RESTROOM /
SHWR
102 C
SERVER
ROOM
106 C
OPEN OFFICE
108 C
(E) MAIL
ROOM
109 C
(E) CORRIDOR
101 C
A5.1
A5.1
CT-1, CERAMIC TILING
SCRF-1, STATIC-CONTROL RESILIENT FLOORING
TC-1, TILE CARPETING
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A3.2F
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
FLOOR FINISH
PLANS AREA C
18075.00
SM
LY
SM/LY
1/4" = 1'-0"10 ENLARGED AREA C FINISH FLOOR PLAN NORTH
0'4' 2' 4' 8'
KEYNOTES
LEGEND
LEVEL 1
100' - 0"
LEVEL 2
111' - 8"
12345678910111220
01-03 01-03 01-03 01-03 01-03 01-03 01-03 01-03 01-03 01-03 01-03
01-02 01-02 01-02 01-02 01-02 01-02 01-02 01-02 01-02
LEVEL 1
100' - 0"
LEVEL 2
111' - 8"
12345678910111220
01-02 01-02 01-02 01-02 01-02 01-02 01-02 01-02 01-02
01-0301-0301-0301-0301-0301-0301-0301-0301-0301-0301-03
LEVEL 1
100' - 0"
LEVEL 2
111' - 8"
FGHJ
A5.1
A5.1
E
F
G
H
J
A4.1
A5.1
A5.1
23-03
23-03
08-02
INDICATES BUILT ITEM TO BE REMOVED
MP-1 INSULATED METAL WALL PANELS IN STOREFRONT @ B-WING
MP-2 INSULATED METAL WALL PANELS @ C-WING
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A4.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
EXTERIOR
ELEVATIONS / AREA
C ROOF PLAN
18075.00
SM
LY
SM/LY
1/8" = 1'-0"1 B-WING SOUTH ELEVATION
KEYNOTES
1/8" = 1'-0"5 B-WING SOUTH ELEVATION DEMO
01-02 ALT-2. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 1ST FLOOR
01-03 ALT-3. B-WING WINDOW REPLACEMENT ENTIRE SOUTH ELEVATION 2ND FLOOR
08-02 (E) SKYLIGHT
23-03 MECH. ROOFTOP UNIT, SEE M3.3 FOR OPENINGS IN (E) DECKING SEE DETAIL
12/A7.1 FOR 4X4 STIFFENER BEAM @ OPENINGS
DEMOLITION LEGEND
1/8" = 1'-0"11 C-WING EAST ELEVATION
1/8" = 1'-0"13 C-WING ROOF PLAN
A4.1 EXTERIOR MATERIAL LEGEND
LEVEL 1
100' - 0"
LEVEL 2
111' - 8"
A5.1
A5.1
07-01
10-21
5'
TAPERED RIGID INSULATION
3/4" PLYWOOD SHEATHING
2X6 WOOD FRAMING @16" O.C.
2X JOIST HANGER
(E) 2X SKYLIGHT RISER
5/8 GYP.
2X BLOCKING
2X WOOD TRIM
SEALANT
EPDM MEMBRANE AS FLASHING
FASTENER
(E) GRAVEL BALLAST
RPF STRIP
(E) ROOFING MEMBRANE
(E) RIGID INSULATION
(E) BRICK WALL
(E) METAL FURRING WALL
SEALANT
INSULATED METAL PANEL
BASE TRIM
METAL WALL INFILL FRAMING
5/8" GWB
(E) BRICK WALL
(E) METAL FURRING WALL
BATT INSULATION FILL CAVITY
(E) ALUMINUM FLASHING
DRIP FLASHING
PAN FLASHING
HEAD TRIM
SEALANT
EXISTING WALL
NEW WALL
INSULATED METAL PANEL
METAL WALL INFILL FRAMING
5/8" GWB
(E) CONCRETE COLUMN
(E) METAL FURRING WALL
BASE TRIM
FLASHING
SEALANT
SEALANT
1/4" / 1'
1/ 4"
1'
1/4" / 1'
1/ 4"
1'
PROJECT NO.
CHECKED
DRAWN
DESIGNER
DATE ARCHIVE NO.
DRAWING SHEET NO.
SHEET OF
REVISION
PROJECT NAME
DATEREVISION / ISSUENO.
REVISION DATE
REVISION DATE
REVISION DATE
United States Department of Agriculture Forest Service
DRAWING TITLE
FIRE LAB AIR
QUALITY &
ELECTRONIC LAB
5/
/2
4:
:0
P
M
A5.1
05.23.19
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
SECTIONS AREA C
18075.00
Checker
Author
Designer
1/4" = 1'-0"2 C-WING SECTION
KEYNOTES
07-01 INSULATED METAL WALL PANELS
10-21 4-A RATED FIRE EXTINGUISHER W/ CABINET
1 1/2" = 1'-0"6 SKYLIGHT INFILL
3" = 1'-0"7 STOREFRONT INFILL HEAD / SILL @ SERVER ROOM
LEGEND
3" = 1'-0"10 STOREFRONT INFILL JAMB @ SERVER ROOM
1/2" = 1'-0"11 SKYLIGHT INFILL PLAN
A3.2
A5.1 A5.1
A3.2 A4.1
09-01
02-05
12-08
1' - 6" 3' - 0" 3' - 0" 1' - 6"
2'
0"
1'
1'
2'
2' - 8" 1' - 6" 3' - 0" 3' - 0" 1' - 6"
09-02
D30W
342218
E41W
342236
G00W
342236
D30W
342218
W25W
361218L
W25W
361236
W25W
241236
W25W
361218L
FUTURE
FUME
HOOD
(E) FUME HOOD
09-02
2' - 0"2' - 0"2' - 0"2' - 0"2' - 0"
7'
S25W
842224L
S25W
842224L
S25W
842224L
S25W
842224L
S25W
842224L
10-20
5'
12-08
2'
0"
1'
3'
2' - 5" 2' - 6" 2' - 0" 1' - 6" 2' - 0" 3' -…