1282FT19R0009

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82FT

FORT COLLINS CO 80526

240 W PROSPECT STREET

ROCKY MOUNTAIN RESEARCH STATION

USDA FOREST SERVICE

07/03/20190003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/03/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ANTHONY O. SALAS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Missoula Fire Lab Air Quality and Electronic Lab Renovation Project

Amendment 0003 is as follows:

Provide questions and answers through 07/02/2019.

Period of Performance: 08/05/2019 to 03/12/2020

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1282FT19R0009

Fire Lab Air Quality and Electronic Lab

Amendment No. 0003, dated 07/03/2019 Page 1 of 1

Fire Lab Air Quality and Electronic Lab

Solicitation Number 1282FT19R0009 Amendment 0003 – Questions and Answers

Q1. A 9.1 Requests shades at labs and offices manufactured by Hunter Douglas. The Specification Requests MechoShade. What is the preferred manufacturer?

A1. We don't have a preferred manufacturer, but rather these are used for the basis of design.

Q2. Do we have a West elevation or window sizes for area C?

A2. A6.3 detail 15 has elevation.

Q3. Do we have a North elevation or window sizes for areas A and B?

A3. There are no elevations or window sizes available.

Q4. Alternates 2 & 3 are mentioned in the spec. Do we want each area priced separately (ALT2, ALT3, C, A, B)?

A4. Roller shades are part of Alternate 2 & 3 and should be priced accordingly.

Q5. Typically in a telecommunication room for low voltage overhead cable management steel ladder rack is used. Steel ladder rack is approximately three times cheaper than aluminum. Would you be able to check with the engineers to see if aluminum is what they wanted or would steel be acceptable.

A5. On drawing E0.1 under Electrical Low Voltage Legend to remove the requirement for aluminum Ladder and steel ladder is acceptable.

Q6. The window elevations on drawing A9.1 show the opening to be +/- 5’-4” but the schedule calls out 6’-0”. Can you confirm which one is correct?

A6. The windows on the first floor are southside are 5’4” and the windows on second floor are 6’0”.

Q7. Are the new aluminum frames going to be clear anodized to match the existing? The specs call out using the manufacturers full range of colors, but there is a price break for the clear anodized.

A7. The new aluminum frames is going to be clear anodized to match the existing.

Q8. The hazardous materials report indicates there is asbestos floor tile under the Alternate 1 carpet areas. Is that correct? Are we abating this tile under the alternate?

A8. That is correct there is asbestos floor tile under the Carpet and will need to be abated under alternate 1.

Q9. The hazardous materials report includes rooms that are not part of this renovation (for example, bathrooms 126B and 127B). I am assuming we are only abating rooms that are part of the new construction. Is that correct?

A9. Only abate in rooms that are part of the construction area.

Q10. Drawing D3.2 has a keynote 01-06 in some rooms. The legend calls this “not used”. Can you clarify this?

A10. Keynote 01-06 is not used even though shown in some rooms.