1282FT19R0009AME0001.pdf

PDF 276 KB Posted

Attached to
Missoula Fire Lab Air Quality and Electronic Lab Renovation
Solicitation number
1282FT19R0009
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1282FT19R0009

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

82FT

FORT COLLINS CO 80526

240 W PROSPECT STREET

ROCKY MOUNTAIN RESEARCH STATION

USDA FOREST SERVICE

06/07/20190001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/07/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Missoula Fire Lab Air Quality and Electronic Lab Renovation Project

Amendment 0001 is as follows:

Provide questions and answers from the pre-bid walk through and to post the contractor sign in sheet.

Period of Performance: 08/05/2019 to 03/12/2020

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ANTHONY O. SALAS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

1282FT19R0009

Fire Lab Air Quality and Electronic Lab

Amendment No. 0001, dated 06/13/2019 Page 1 of 1

Fire Lab Air Quality and Electronic Lab

Solicitation Number 1282FT19R0009 Amendment 0001 – Questions and Answers

Refer to sign in sheet.

Q1.) What are the expectations for seperation of the North and South elevation on 1st floor where majority of work is occuring?

A1.) Egress is required for occupied offices on the north elevation. Coordinate details with COR.

Q2.) How will access be handled for window and carpet alternate items?

A2.) The COR will work with contractor and Fire Lab management to vacate large areas at a time to provide access to complete work efficiently.

Q3.) What are the dominant asbestos containing materials?

A3.) Wall transite paneling and 9x9 floor tiles. Refer to attached Hazardous Material Reports.

Q4.) What is the crawlspace height?

A4.) Approximately 4’-5’.

Q5.) What is the access to the C-wing roof?

A5.) Contractor can access the roof with a lift from the parking lot. There is a door from the 2nd floor, however, it is through an occupied office and would require coordination and approval from the COR.

Q6.) What extent is there a need for fire alarm work?

A6.) Refer to drawings as follows:

• D2.1 General Note 20

• D3.1 General Note 20

• D3.2 General Note 20

• D7.1 General Note 20

• DE2.1 Keynote 1

• E2.5 Keynote 3

• E2.6 Keynote 5

Q6.) What extent is there a need for PA system work?

A6.) Refer to drawings as follows:

• D2.1 General Note 20

• D3.1 General Note 20

• D3.2 General Note 20

• D7.1 General Note 20

SF-30
DraftAmendment0001QAs
6_13_2019 Pre Bid Walk Through Sign In