This document is a Schedule of Items for the USFS San Juan National Forest's GAOA Columbine Toilet Replacement project for Fiscal Year 2025. The schedule outlines three base items corresponding to three different campgrounds: Madden Creek, Miller Creek, and Sig Creek Campgrounds. Each base item includes identical line items for: (1) mobilization, (2) demolition of existing toilet, (3) supply and delivery of a new single vault toilet with installation, backfill, and grading, and (4) construction of a 3/4" road base gravel path compacted 6" deep. The estimated quantities are consistent across all three campgrounds, with 1 lump sum (LS) for mobilization, demolition, and toilet installation, and 10 cubic yards (CY) for gravel path construction. The pricing template allows for itemized cost tracking for each campground's toilet replacement and associated site work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LINE ITEM PAY NO. DESCRIPTION PAY UNIT EST QTY UNIT COST TOTAL
1.1 15101 Mobilization LS 1
1.2 20301 Demolition of exisiting toilet LS 1
1.4 63704 Supply and delivery of new toilet (single vault), installation, backfill, and grading of new toilet
LS 1
1.3 31101 Constructed gravel path - 3/4" road base material, compacted 6" deep
CY 10
Sub Total:
LINE ITEM PAY NO. DESCRIPTION PAY UNIT EST QTY UNIT COST TOTAL
2.1 15101 Mobilization LS 1
2.2 20301 Demolition of exisiting toilet LS 1
2.3 63704 Supply and delivery of new toilet (single vault), installation, backfill, and grading of new toilet
LS 1
2.4 31101 Constructed gravel path - 3/4" road base material, compacted 6" deep
CY 10
Sub Total:
LINE ITEM PAY NO. DESCRIPTION PAY UNIT EST QTY UNIT COST TOTAL
3.1 15101 Mobilization LS 1
3.2 20301 Demolition of exisiting toilet LS 1
3.3 63704 Supply and delivery of new toilet (single vault), installation, backfill, and grading of new toilet
LS 1
3.4 31101 Constructed gravel path - 3/4" road base material, compacted 6" deep
CY 10
Sub Total:
Base Items Total:
BASE ITEM #3 - SIG CREEK CAMPGROUND
BASE ITEM #1 - MADDEN CREEK CAMPGROUND
BASE ITEM #2 - MILLER CREEK CAMPGROUND
SCHEDULE OF ITEMS
Schedule of Items USFS - San Juan National Forest
PROJECT TITLE: GAOA Columbine Toilet Replacement - FY25