This document is an Amendment (0001) to a federal solicitation for the Columbine Office Painting project (Solicitation #1282B125R0020) issued by the USDA Forest Service. The amendment includes responses to contractor questions, an attendee list from a site visit held on April 8, 2025, and updates to the Statement of Work and Schedule of Items. Key project details include painting exterior surfaces of six buildings in the San Juan National Forest in Colorado, replacing stair treads at the Bayfield Modular Office Building, and replacing columns at the Columbine District Ranger Office. The project has an estimated performance period from June 16, 2025, through August 20, 2025 (45 business days), with proposals due by May 6, 2025, at 10:00 a.m. Central Time. Payment will be a lump sum made at project completion, and the work includes surface repair, preparation, priming, and painting/staining of exterior surfaces.

The amendment addresses several contractor questions, including confirmation that corn-cob blasting is not required (Walnut Shell Grit blasting is acceptable), doors and gutters will be painted, no additional site visits are planned, roof painting is not included, and the Contracting Officer's Representative (COR) will supervise the project. The buildings were originally painted in 2005, and no lead paint was mentioned in records. Contractors were instructed to review all attachments on www.Sam.gov, with complete details available in the Statement of Work and associated documents. Eight painting contractors attended the site visit, including Flood DR, Bare Wood Fine Finishing, Desert Winds Painting, JR Ramey Painting, Acevedos Painting LLC, Adonai Painting LLC, Black Helix Contracting, Brett Coleman AMC, and AA Quality Painting.

View the file

Other files for this federal contract opportunity

Other files attached to COLUMBINE OFFICE PAINTING, newest first.
File Type Posted
Attach 2A_SOI dated 04.14.2025.xlsx XLSX spreadsheet
Attach 1A_SOW_204.14.2025.pdf PDF
Attach 5_Wage Determination_CO20250001_dated 03.14.2025.pdf PDF
Attach 2_SOI.xlsx XLSX spreadsheet
Attach 4_Engineering Drawings.pdf PDF
Attach 3_Technical Specifications.pdf PDF
1282B125R0020_Columbine Office Painting.pdf PDF
Attach 1_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF CHANGES

PROJECT: COLUMBINE OFFICE PAINTING

SOLICITATION #1282B125R0020

Amendment 0001

Responses to contractor and has

No -s the COR areas or replacement made

A lump sum and and are

A

A NOT

- 8:00 a m p m

Can the customer and the

14) On what date does the work need to be completed? The estimated Period of Performance is June 16, 2025, through August 20, 2025. The range in dates represents 45 business days (holidays and weekends excluded) from the estimated start date of

June 16, 2025 through the estimated completion date of August 20, 2025. For he Statement of Work and SF 1442 will be amended.

15) Is the Period of Performance 45 days or 65 days? The range in dates represents 45 business days (holidays and weekends excluded) from the estimated start date of June the Statement of Work and SF 1442 will be amended.

16) Is lead paint present on the exterior of the buildings? 5

’s

E- Phone # Flood DR Noah Lopez 9709465614

9709463011

- 5052158165

9709038404

LLC

9709034962

LLC

9707596842

9704269155

9709460828

File details come from the government source that posted it. Updated .