This document is an Amendment (0001) to a federal solicitation for the Columbine Office Painting project (Solicitation #1282B125R0020) issued by the USDA Forest Service. The amendment includes responses to contractor questions, an attendee list from a site visit held on April 8, 2025, and updates to the Statement of Work and Schedule of Items. Key project details include painting exterior surfaces of six buildings in the San Juan National Forest in Colorado, replacing stair treads at the Bayfield Modular Office Building, and replacing columns at the Columbine District Ranger Office. The project has an estimated performance period from June 16, 2025, through August 20, 2025 (45 business days), with proposals due by May 6, 2025, at 10:00 a.m. Central Time. Payment will be a lump sum made at project completion, and the work includes surface repair, preparation, priming, and painting/staining of exterior surfaces.
The amendment addresses several contractor questions, including confirmation that corn-cob blasting is not required (Walnut Shell Grit blasting is acceptable), doors and gutters will be painted, no additional site visits are planned, roof painting is not included, and the Contracting Officer's Representative (COR) will supervise the project. The buildings were originally painted in 2005, and no lead paint was mentioned in records. Contractors were instructed to review all attachments on www.Sam.gov, with complete details available in the Statement of Work and associated documents. Eight painting contractors attended the site visit, including Flood DR, Bare Wood Fine Finishing, Desert Winds Painting, JR Ramey Painting, Acevedos Painting LLC, Adonai Painting LLC, Black Helix Contracting, Brett Coleman AMC, and AA Quality Painting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2A_SOI dated 04.14.2025.xlsx | XLSX spreadsheet | |
| Attach 1A_SOW_204.14.2025.pdf | ||
| Attach 5_Wage Determination_CO20250001_dated 03.14.2025.pdf | ||
| Attach 2_SOI.xlsx | XLSX spreadsheet | |
| Attach 4_Engineering Drawings.pdf | ||
| Attach 3_Technical Specifications.pdf | ||
| 1282B125R0020_Columbine Office Painting.pdf | ||
| Attach 1_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF CHANGES
PROJECT: COLUMBINE OFFICE PAINTING
SOLICITATION #1282B125R0020
Amendment 0001
Responses to contractor and has
No -s the COR areas or replacement made
A lump sum and and are
A
A NOT
- 8:00 a m p m
Can the customer and the
14) On what date does the work need to be completed? The estimated Period of Performance is June 16, 2025, through August 20, 2025. The range in dates represents 45 business days (holidays and weekends excluded) from the estimated start date of
June 16, 2025 through the estimated completion date of August 20, 2025. For he Statement of Work and SF 1442 will be amended.
15) Is the Period of Performance 45 days or 65 days? The range in dates represents 45 business days (holidays and weekends excluded) from the estimated start date of June the Statement of Work and SF 1442 will be amended.
16) Is lead paint present on the exterior of the buildings? 5
’s
E- Phone # Flood DR Noah Lopez 9709465614
9709463011
- 5052158165
9709038404
LLC
9709034962
LLC
9707596842
9704269155
9709460828