J.2 SMV2018MonitoringSched, 01012018.pdf
PDF 28 KB Posted
- Attached to
- SRD Shadow Mountain Village Water System Management Operator IDIQ Federal contract opportunity
- Solicitation number
- 1282AT19R0001
About this file
J.2 Monitoring Schedule
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public Water System ID Water System Name Primary County Federal System Type State Source Type Population
CO0125709
SHADOW MOUNTAIN
VILLAGE GRAND
Non-Transient, Non-
Community Groundwater 115
Minimum Certification Required for Treatment Operator
Minimum Certification Required for Distribution System Operator Seasonal Water
Hauler
D 1 No No
SHADOW MOUNTAIN VILLAGE
Calendar Year 2018 Monitoring Schedule
Mailing Address: 2150 CENTRE AVE BLDG E FORT COLLINS, CO 80526
General Information *Samples must be collected at the location specified in the Monitoring Plan or Record of Approved Waterworks.*
• The Drinking Water Monitoring Schedule is provided for your reference (example schedule available at https://wqcdcompliance.com/schedules).
• Schedules are updated every Wednesday evening. Please contact your specialist with questions (contact information) or call us at 303-692-3556.
• Laboratory sampling results may be submitted using the Online Portal https://wqcdcompliance.com/login. Please do not email results or attachments to individuals.
• Please identify the Facility ID and Sample Point ID (listed below) when submitting sample results. Facility and Sample Point IDs are used to identify general sample site locations.
• Online records available at environmentalrecords.colorado.gov/HPRMWebDrawer/Record. Enter PWSID as the 'Title Word'.
• All systems that treat groundwater with a chemical disinfectant must monitor residuals at the entry point(s) to the distribution system at least once per week. The entry point residual must not be below 0.2 mg/L for more than 72 hours. When groundwater is treated with surface water or is 4-log approved the system must comply with the monitoring requirements in the 'Non-Distribution System Sample Schedules' section and the disinfectant residual level requirements in the 'Facility Specific Levels' section.
Monitoring Information
Contact Information All public water systems are required to maintain an Administrative Contact, Treatment Operator (if applicable), Distribution System Operator (if applicable), and Owner. If the information below is incorrect or blank please send us a contact update form. This form is available by visiting http://wqcdcompliance.com. The contact update form is located under 'Facility Operator Certification'.
For operator certification information please visit http://www.ocpoweb.com. You may search for individual operator certification levels/expirations by clicking on the 'Information' menu bar and selecting 'State Certified Operators'.
Administrative Contact Treatment Operator Distribution System Operator Owner
LAURIE YEAGER TOM MCCLELLAND TOM MCCLELLAND
2018 Monitoring Schedule Page 1 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
Distribution System Sample Schedules
Facility ID
DS001
Facility Name
DISTRIBUTION SYSTEM
Facility Type Distribution System
Microorganisms and Disinfectants
TOTAL COLIFORM BACTERIA (TCR) Sample Schedule: Collection Period:
1 sample(s) per Month during the collection period January 1, 2018 to December 31, 2018
Sample Point ID(s) (Sample Point Name):
RTOR (ROUTINE ORIGINAL)
RPOT (REPEAT OTHER)
RPOR (REPEAT ORIGINAL)
RPDN (REPEAT DOWNSTREAM)
RPUP (REPEAT UPSTREAM)
For raw water source samples (i.e. non-distribution) use the Facility ID and Sample Point ID listed at the end of this monitoring schedule
FREE CHLORINE Sample Schedule:
Measure every time you collect a TOTAL COLIFORM BACTERIA (TCR) sample
Disinfection Byproducts
TTHMs and HAA5s (Stage 2) Sample Schedule: *Collection Period:*
1 dual sample(s) per sample point for a TOTAL of 1 dual sample(s) per Year
*Collection Restriction: Sample(s) must be collected between August 1 and August 31*
State Sample Point ID(s) (System Location ID(s)):
DBP001 (HIGH DBP SITE-UNDEFINED-CONTACT WQCD)
***Please Submit Stage 2 Sample Site Plan***
August 1, 2018 to August 31, 2018
Lead and Copper
LEAD AND COPPER Sample Schedule: Collection Period:
10 sample(s) per 6 Months during the collection period Once results are received and processed the 90th percentile will be available by searching online records at http://environmentalrecords.colorado.gov/HPRMWebDrawer/Record. Enter PWSID as the 'Title Word'.
January 1, 2018 to December 31, 2018
Compliance Check:
1st 6 Months 2nd 6 Months
Sample Point IDs for lead and copper begin with 'LCR' and are available at the end of the monitoring schedule. To manage sites visit https://wqcdcompliance.com/login. If sites not listed please contact us at https://www.colorado.gov/cdphe/dwcontact.
2018 Monitoring Schedule Page 2 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
Non-Distribution System Sample Schedules
Facility Name
WATER TREATMENT
FACILITY
Facility Type Treatment Plant
Sample Point ID
Sample Point Name
ENTRY POINT
Sample Point Type Entry Point
Quarterly Schedules
FLUORIDE Sample Schedule: Collection Period:
1 sample(s) per Quarter during the collection period January 1, 2018 to December 31, 2018
Compliance Check:
1st Quarter **Result(s) Received** 2nd Quarter **Result(s) Received** 3rd Quarter 4th Quarter
INORGANICS GROUP Sample Schedule: Collection Period:
1 sample(s) per Quarter during the collection period January 1, 2018 to December 31, 2018
Compliance Check:
1st Quarter **Result(s) Received** 2nd Quarter **Result(s) Received** 3rd Quarter 4th Quarter
SYNTHETIC ORGANICS GROUP Sample Schedule: Collection Period:
1 sample(s) per Quarter during the collection period January 1, 2018 to December 31, 2018
Compliance Check:
1st Quarter **Result(s) Received** 2nd Quarter **Result(s) Received** 3rd Quarter 4th Quarter
VOLATILE ORGANICS GROUP Sample Schedule: Collection Period:
1 sample(s) per Quarter during the collection period January 1, 2018 to December 31, 2018
Compliance Check:
1st Quarter **Result(s) Received** 2nd Quarter **Result(s) Received** 3rd Quarter 4th Quarter
Satisfied Schedules
NITRATE Sample Schedule: Collection Period:
1 sample(s) per Year January 1, 2018 to December 31, 2018 **Sample Result(s) Received**
NITRITE Sample Schedule: Collection Period:
1 sample(s) per 9 Years January 1, 2011 to December 31, 2019 **Sample Result(s) Received**
2018 Monitoring Schedule Page 3 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
Facility Specific Levels
DS001
Facility Name
DISTRIBUTION SYSTEM
Facility Type Distribution System
Analyte Name Level Level Type
FREE CHLORINE 0.2 mg/L Minimum
FREE CHLORINE 4.0 mg/L Maximum
Compliance and Public Notice Schedules
Lead and Copper Consumer Notification
Activity Name Activity Due Date Activity Completion Date
SUBMIT LEAD CONSUMER NOTIFICATION CERTIFICATE OF
DELIVERY AND SAMPLE NOTIFICATION
September 30, 2017 Activity Not Completed
SUBMIT LEAD CONSUMER NOTIFICATION CERTIFICATE OF
DELIVERY AND SAMPLE NOTIFICATION
March 31, 2018 Activity Not Completed
SUBMIT LEAD CONSUMER NOTIFICATION CERTIFICATE OF
DELIVERY AND SAMPLE NOTIFICATION
September 30, 2018 Activity Not Completed
SUBMIT LEAD CONSUMER NOTIFICATION CERTIFICATE OF
DELIVERY AND SAMPLE NOTIFICATION
March 31, 2019 Activity Not Completed
Lead and Copper Compliance Schedule Visit colorado.gov/cdphe/lcr for more information
Activity Name Activity Due Date Activity Completion Date
WQP MONITORING June 30, 2018 Activity Not Completed
SOURCE WATER PB/CU DATA SUBMITTAL December 31, 2018 Activity Not Completed
TREATMENT RECOMMENDATIONS December 31, 2018 Activity Not Completed
Facility Information Sample Point Information
Visit https://wqcdcompliance.com/login to manage lead and copper sites.
Facility ID Active Status Facility Name Facility Type Sample
Point ID Sample Point Name
004 A WELL NO 4 Well 004 RAW
005 A
WATER TREATMENT
FACILITY Treatment Plant 005 ENTRY POINT
006 A
3000 GALLON STORAGE
TANK Storage 006 NOT ENTRY POINT
DS001 A DISTRIBUTION SYSTEM Dist System/Zone
DBP001
HIGH DBP SITE-UNDEFINED-CONTACT
WQCD
LCR001 87
LCR002 89
LCR003 90
LCR004 66
2018 Monitoring Schedule Page 4 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
Time Period Definitions
Time Period Start Date End Date
First Quarter January 1, 2018 March 31, 2018
Second Quarter April 1, 2018 June 30, 2018
Third Quarter July 1, 2018 September 30, 2018
Fourth Quarter October 1, 2018 December 31, 2018
First 6 Months January 1, 2018 June 30, 2018
Second 6 Months July 1, 2018 December 31, 2018
Year January 1, 2018 December 31, 2018
DS001 A DISTRIBUTION SYSTEM Dist System/Zone
LCR005 67
LCR006 69
LCR007 3
LCR008 8
LCR009 11
LCR010 12
RPDN REPEAT DOWNSTREAM
RPOR REPEAT ORIGINAL
RPOT REPEAT OTHER
RPUP REPEAT UPSTREAM
RTOR ROUTINE ORIGINAL
001 I WELL NO 1 ABANDONED Well
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
001T I CHLORINATOR FOR WELL
1 ABANDONED
Treatment Plant
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
002 I WELL NO 2 ABANDONED Well
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
002T I CHLORINATOR FOR WELL
2 ABANDONED
Treatment Plant
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
003 I WELL NO 3 ABANDONED Well
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
003T I CHLORINATOR FOR WELL
3 ABANDONED
Treatment Plant
NO ACTIVE
SAMPLING
POINT
NO ACTIVE SAMPLING POINT
2018 Monitoring Schedule Page 5 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
Analyte Group Definitions Analyte Group
Name Analytes in Group Number of Analytes in Group
INORGANICS
GROUP
ANTIMONY | ARSENIC | BARIUM | BERYLLIUM | CADMIUM | CHROMIUM |
MERCURY | NICKEL | SELENIUM | SODIUM | THALLIUM 11
SYNTHETIC
ORGANICS
GROUP
1,2-DIBROMO-3-CHLOROPROPANE | 2,4,5-TP | 2,4-D | ALDICARB | ALDICARB
SULFONE | ALDICARB SULFOXIDE | ATRAZINE | BENZO(A)PYRENE | BHC-
GAMMA | CARBOFURAN | CHLORDANE | DALAPON | DI(2-ETHYLHEXYL)
ADIPATE | DI(2-ETHYLHEXYL) PHTHALATE | DINOSEB | DIQUAT | ENDOTHALL |
ENDRIN | ETHYLENE DIBROMIDE | HEPTACHLOR | HEPTACHLOR EPOXIDE |
HEXACHLOROBENZENE | HEXACHLOROCYCLOPENTADIENE | LASSO |
METHOXYCHLOR | OXAMYL | PENTACHLOROPHENOL | PICLORAM | SIMAZINE |
POLYCHLORINATED BIPHENYLS (PCB) | TOXAPHENE
VOLATILE
ORGANICS
GROUP
1,1,1-TRICHLOROETHANE | 1,1,2-TRICHLOROETHANE | 1,1-DICHLOROETHYLENE
| 1,2,4-TRICHLOROBENZENE | 1,2-DICHLOROETHANE | 1,2-DICHLOROPROPANE |
BENZENE | CARBON TETRACHLORIDE | CHLOROBENZENE | CIS-1,2-
DICHLOROETHYLENE | DICHLOROMETHANE | ETHYLBENZENE | O-
DICHLOROBENZENE | P-DICHLOROBENZENE | STYRENE |
TETRACHLOROETHYLENE | TOLUENE | TRANS-1,2-DICHLOROETHYLENE |
TRICHLOROETHYLENE | VINYL CHLORIDE | XYLENES (TOTAL)
2018 Monitoring Schedule Page 6 of 6PWS ID: CO0125709
SHADOW MOUNTAIN VILLAGE
Report Generation Date: September 5, 2018
This monitoring schedule is based on the system's current inventory and is subject to change. Water systems are responsible for promptly reporting schedule errors or omissions.
Errors or omissions on monitoring schedules do not prohibit the Water Quality Control Division from enforcing monitoring requirements set forth by the Regulations.
File details come from the government source that posted it.