J.23_SOI-by_Tab-(Fill-In).xlsx

XLSX spreadsheet 41 KB Posted

Attached to
ARP Facilities/Quick Fix Multi-Year
Solicitation number
1282AT18R0010
Issued by

About this file

Scenario Schedule of Items (SOI) by Tab (fill-in)

View the file

Other files

File Type Posted
BPASolTerms_1282AT18R0010,_0001.pdf PDF
Pre-Bid_Minutes_1282AT18R0010,_06152018FE.pdf PDF
J.27_PH3-Stub_Creek_Painting.pdf PDF
J.25_PH1-Boulder_Staining_Painting.pdf PDF
J.22_BRDNederlandWaterHeaterReplacement.doc DOC document
J.26_PH2-Red_Feather_Lakes_Painting.pdf PDF
SF30_-_1282AT18R0010,_0001.pdf PDF
J.4_fs_6300-11_SubcontractorApproval.doc DOC document
J.10_WD_CO-27_(Rev._-2),_03022018.pdf PDF
J.13_WD_CO11_(Rev._-5),_03022018.pdf PDF
J.14_WD_CO34_(Rev._-2),_03022018.pdf PDF
J.19_BRDOffandModularStaining.doc DOC document
J.1_Biobased_Statement_Letter.docx DOCX document
J.9_WD_15-5425_(Rev.-8),_01162018.pdf PDF
J.22_BRDNederlandWaterHeaterReplacement.doc DOC document
J.20_CLRDStubCkWkCtrBldgDemo.doc DOC document
J.3_Designation_of_Representative.doc DOC document
J.11_WD_CO-29_(Rev._-2),_03022018.pdf PDF
J.24_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
J.2_FS_6300-27,_Experience_Questionnaire.docx DOCX document
J.17_WD_CO15_(Rev._-4),_03022018.pdf PDF
J.7_WD_15-5437_(Rev.-5),_01162018.pdf PDF
J.5_WD_15-5415_(Rev.-7),_01162018.pdf PDF
J.6_WD_15-5419_(Rev.-7),_01162018.pdf PDF
J.12_WD_CO40_(Rev._-2),_03022018.pdf PDF
J.15_WD_CO39_(Rev._-2),_03022018.pdf PDF
J.8_WD_15-5421_(Rev.-7),_01162018.pdf PDF
J.18_CLRDStubWorkCenterPainting.doc DOC document
0._1282AT18R0010.pdf PDF
J.16_WD_CO14_(Rev._-4),_03022018.pdf PDF
J.21_CLRDRedFeatherWkCtrPainting.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

J.18

TASK ORDER SCHEDULE OF ITEMS
Sol No. 1282AT18Q0010 | CLRD Stub Creek Work Center Call (J.18)
Contractor Name Here
CLRD BPA CALL ONE (1) ITEMS
ITEM NO.Labor DescriptionMethod of MeasureUnitQuantityUnit PriceCost
1505MobilizationLSQLS1$0.00$0.00
09912 (01)Surface Preparation and PaintingLSQLS1$0.00$0.00
09912 (02)Stub Creek BunkhouseLSQLS1$0.00$0.00
Price without Mobilization$0.00
TOTAL$0.00

J.19

TASK ORDER SCHEDULE OF ITEMS
Sol No. 1282AT18Q0010 | BRD Office and Modular Staining Call (J.19)
Contractor Name Here
BRD BPA CALL ONE (1) ITEMS
ITEM NO.Labor DescriptionMethod of MeasureUnitQuantityUnit PriceCost
1505MobilizationLSQLS1$0.00$0.00
09912 (01)Surface Preparation and Staining District OfficeLSQLS1$0.00$0.00
09912 (02)Surface Preparation and Staining ModularLSQLS1$0.00$0.00
09912 (03)Information KioskLSQLS1$0.00$0.00
6221Cedar Siding ReplacementDQLF50$0.00$0.00
Price without Mobilization$0.00
TOTAL$0.00

J.20

TASK ORDER SCHEDULE OF ITEMS
Sol No. 1282AT18Q0010 | CLRD Stub Creek Work Center Building Demolition (J.20)
Contractor Name Here
CLRD BPA CALL TWO (2) ITEMS
ITEM NO.Labor DescriptionMethod of MeasureUnitQuantityUnit PriceCost
1505MobilizationLSQLS1$0.00$0.00
01732 (01)Demolition and removal of the Paint
Shed #0410 an Oil House #0411LSQLS1$0.00$0.00
Price without Mobilization$0.00
TOTAL$0.00

J.21

TASK ORDER SCHEDULE OF ITEMS
Sol No. 1282AT18Q0010 | CLRD Red Feather Work Center Painting (J.21)
Contractor Name Here
CLRD BPA CALL THREE (3) ITEMS
ITEM NO.Labor DescriptionMethod of MeasureUnitQuantityUnit PriceCost
1505MobilizationLSQLS1$0.00$0.00
09912 (01)Surface Preparation and Painting Large Bunkhouse #0308LSQLS1$0.00$0.00
09912 (02)Surface Preparation and Painting of Pilot Ready Room #0312LSQLS1$0.00$0.00
Price without Mobilization$0.00
TOTAL$0.00

J.22

TASK ORDER SCHEDULE OF ITEMS
Sol No. 1282AT18Q0010 | BRD Nederland Work Center Water Heater Replacement Call (J.22)
Contractor Name Here
BRD BPA CALL TWO (2) ITEMS
ITEM NO.Labor DescriptionMethod of MeasureUnitQuantityUnit PriceCost
1Remove existing water heater. Install new propane water heater.LSQLS1$0.00$0.00
TOTAL$0.00

File details come from the government source that posted it.