Scenario 1: CLRD Stub Work Center Painting

View the file

Other files for this federal contract opportunity

Other files attached to ARP Facilities/Quick Fix Multi-Year, newest first.
File Type Posted
Pre-Bid_Minutes_1282AT18R0010,_06152018FE.pdf PDF
J.22_BRDNederlandWaterHeaterReplacement.doc DOC document
BPASolTerms_1282AT18R0010,_0001.pdf PDF
SF30_-_1282AT18R0010,_0001.pdf PDF
J.27_PH3-Stub_Creek_Painting.pdf PDF
J.25_PH1-Boulder_Staining_Painting.pdf PDF
J.26_PH2-Red_Feather_Lakes_Painting.pdf PDF
J.19_BRDOffandModularStaining.doc DOC document
J.1_Biobased_Statement_Letter.docx DOCX document
J.6_WD_15-5419_(Rev.-7),_01162018.pdf PDF
J.12_WD_CO40_(Rev._-2),_03022018.pdf PDF
J.15_WD_CO39_(Rev._-2),_03022018.pdf PDF
J.10_WD_CO-27_(Rev._-2),_03022018.pdf PDF
J.21_CLRDRedFeatherWkCtrPainting.doc DOC document
J.16_WD_CO14_(Rev._-4),_03022018.pdf PDF
J.13_WD_CO11_(Rev._-5),_03022018.pdf PDF
J.24_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
J.11_WD_CO-29_(Rev._-2),_03022018.pdf PDF
J.3_Designation_of_Representative.doc DOC document
J.17_WD_CO15_(Rev._-4),_03022018.pdf PDF
J.23_SOI-by_Tab-(Fill-In).xlsx XLSX spreadsheet
J.5_WD_15-5415_(Rev.-7),_01162018.pdf PDF
J.7_WD_15-5437_(Rev.-5),_01162018.pdf PDF
J.8_WD_15-5421_(Rev.-7),_01162018.pdf PDF
J.4_fs_6300-11_SubcontractorApproval.doc DOC document
J.14_WD_CO34_(Rev._-2),_03022018.pdf PDF
J.22_BRDNederlandWaterHeaterReplacement.doc DOC document
J.9_WD_15-5425_(Rev.-8),_01162018.pdf PDF
J.20_CLRDStubCkWkCtrBldgDemo.doc DOC document
J.2_FS_6300-27,_Experience_Questionnaire.docx DOCX document
0._1282AT18R0010.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation 1282AT18R0010 BPA Call Canyon Lake Ranger District (CLRD) 2150 Centre Avenue, Bldg E, Fort Collins, CO 80526

Project Title: CLRD Stub Creek Work Center Call Contractor: Contractor Name, POC Name / email@whatever.com Instructions:

1- Offeror will read the project requirement. Respond to the call request in narrative format using the narrative box below the schedule of items section below, including the following information for evaluation: work approach to include number of personnel working the project (to include subcontractors); materials being used; schedule; equipment being used and the source of the equipment (ownership or rental); organization of proposal; and price. The response must not exceed the space provided.

2- Price Proposal, Schedule of Items. Provide a total cost estimate on the Schedule of Items contained within this request, completing all estimated quantities, unit pricing and total cost items in accordance with the items provided from the parent contract shown above.

3- Delivery Instructions. Return this document completed with your Proposal via e-mail in accordance with the instructions to offeror (Section 9) of solicitation 1282AT18R0010.

DESCRIPTION/STATEMENT OF WORK

Project Description The project includes the following work: Surface preparation of all exterior surfaces (excluding roofing materials) priming and painting of two buildings at the Stub Creek Work Center. A pre-bid site visit may be required to determine quantities for estimates/bids. Contact the CO and COR for a final determination on the site visit.

Scope of Work The work includes surface preparation, scraping and pressure washing all exterior surfaces on two buildings including two door on the Barracks and two doors on the Well House. Painting the exterior siding and trim of the Barracks and Well House at Stub Creek Work Center. Paint colors will be selected from the approved supplier’s full line of paint. Paint requirements are stated in the attached specifications.

Technical Specifications (if applicable):

All work shall be conducted in a safe and expedient manner, and in conformance with the specifications referenced in the agreement. All work shall be conducted by personnel fully qualified to perform the tasks assigned, and shall be supervised by a designated Contractor’s Representative.

Location Stub Creek Work Center is located on the Arapaho and Roosevelt National Forest in the Laramie River Valley. To reach the project area, head north from Fort Collins, CO on HWY 287. Turn left (west) on HWY 14 and drive approximately 50 miles to Laramie River Road (CR 103). Head north on CR 103 and drive approximately 17 miles to the junction of CR 80C and CR 103. Turn Left and drive approximately 1.5 miles. Stub Creek Ranger Station is located on the left.

Period of Performance The anticipated period of performance is on or about 11 July 2018 through 22 July 2018. The actual number of work days anticipated for this project is 10 calendar days/months excluding Federal Holidays and Sundays.

Special Considerations:

None.

ADDITIONAL SPECIFICATIONS

No additional specified for this project.

SCHEDULE OF ITEMS

**For the purpose of this solicitation, please input pricing on the Excel provided schedule of items. **

CLRD BPA CALL ONE (1) ITEMS

ITEM NO.
Labor Description
Method of Measure
Unit
Quantity
Unit Price
Cost
01505
Mobilization
LSQ
LS
1
$0.00
$0.00
09912 (01)
Surface Preparation and Painting
LSQ
LS
1
$0.00
$0.00
09912 (02)
Stub Creek Bunkhouse
LSQ
LS
1
$0.00
$0.00
Price without Mobilization
$0.00
Total
$0.00

AQ - Actual Quantities incorporated into the work

DQ - Design Quantities. Quantities will only change if the contract is modified.

LSQ - Lump Sum Quantity **For the purpose of this solicitation, please input pricing on the Excel provided schedule of items. **

OFFEROR’S RESPONSE

Offeror should input their response here.

Project Title: CLRD Stub Creek Work Center Call