Attachment_2_-_AsBuilt_Drawings-20170801.pdf
PDF 4 MB Posted
- Attached to
- Water Treatment Plant Electrical Modifications Federal contract opportunity
- Solicitation number
- 1282A718Q0008
About this file
Attachment 2 - AsBuilt Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_-_Amend_0002_-_1282A718Q0008_-.pdf | ||
| TimberlakeJCC-RFI-Answers20180118.pdf | ||
| Corrected_Pages_8-9_-_Amendment_0001_Only.pdf | ||
| Amendment_0001_-_SF-30_-_1282A718Q0008.pdf | ||
| Attachment_4_-_DB_Wage_Determinations_-_OR170023_-_9-27-2017.pdf | ||
| Attachment_5_-_Quote_Subm._Pkg..docx | DOCX document | |
| Attachment_1_-_Specificaitons-20171030.pdf | ||
| Attachment_3_-_Modified_Drawings-20170901.pdf | ||
| Solicitation_1282A718Q0008_-_SF-1442-Schedule-SOW-TandCs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T01-AB WATER PLANT MODIF
| S01-AB WATER PLANT SITE |
| P01-AB WATER PLANT FLOW |
| P02-AB WELL DETAILS P02 |
| P03 TRENCH & TRANSCLOSU |
| P04-AB WATER PLANT PIPI |
| P05-AB WATER PLANT PIPI |
| P06-AB WATER PLANT PIPI |
| P07-AB WATER PLANT PIPI |
| P08-AB WELLHEAD PIPING |
| P09-AB NEW VALVE VAULT |
| E01-AB CONTROL PANEL FRO |
| E02-AB CONTROL PANEL COM |
| E03-AB CONTROL DEVICES L |
| E04-AB CONTROL PANEL LAD |
| E05-AB CONTROL PANEL LAD |
| E06-AB CONTROL PANEL LAD |
| E07-AB CONTROL PANEL LAD |
| E08-AB CONTROL PANEL LAD |
| E09-AB FILTER PLANT CONT |
| E10-AB CONTROL PANEL LEF |
| E11-AB FILTER PLANT CONT |
| E12-AB CONTROL PANEL LIG |
| E13-AB WATER PLANT ELECT |
| E14-AB WATER PLANT WELL |
| E15-AB WELL PUMP SCHEMAT |
| E16-AB WELL PUMP SCHEMAT |
| E17-AB WELL PUMP ENCLOSU |
| E18-AB WELL PUMP ENCLOSU |
| E19-AB WELL PUMP ENCLOSU |
| E20-AB WATER TANK CONSTR |
| E21-AB WATER TANK LIGHTI |
| E22-AB WATER TANK ELEVAT |
| E23-AB AIR COMPRESSOR MO |
File details come from the government source that posted it.