(x)

12805B24R0007 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12805B

FORT COLLINS CO 80526

BLDG D, SUITE 300

2150 CENTRE AVENUE

USDA ARS PA AAO ACQ/PER PROP

02/14/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/24/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 2 provides additional questions and answers and extends the due date for offers.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

ERIN M. RIFFEY

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

12805B24R0007, Houston CNRC Critical Upgrades – Flood Gate, Houston, Texas Amendment 2 February 26, 2024

Offerors must Acknowledge this Amendment (1) in Block 19 on the SF 1442 in their proposal or submit a signed copy of the Amendment 1 SF 30.

Date and time for offers is extended to March 4, 2024, at 1:00 pm Central Time.

1. The proposed design of the gate swings with the direction of anticipated flood waters, “loading” of the gate with water creates the potential for the gate to blow open due to weight/pressure.

Additionally, a sill is anticipated to be necessary for the gate to seal properly. Please advise on acceptability of raised sill placement and acceptable factors associated with swing gate design load bearing capacity.

A: The flood gate must swing away from the direction of anticipated flood waters (as shown).

Modifications required to swing the gate toward the water (leveling and re-sloping) would be very invasive and fall outside of the anticipated work of this project.

2. Section 01 01 00, Paragraph 1.2 (D) specifies all employees of the general contractor or subcontractor shall have 10-hour OSHA Construction Safety and/or other relevant competency safety. Please provide additional information/specifics for the other relevant competency training options available for employees to have received in fulfillment of this training requirement.

A: OSHA training information is available at www.osha.gov/training. The Government will accept proof of company’s internal ten-hour safety training requirement for employees in lieu of OSHA training, so long as it is covers OSHA safety issues. However, the superintendent must have the 30-hour OSHA training through an authorized trainer.

3. Do the Superintendent, SSHO and QC Manager need to be 3 separate individuals?

A: The Superintendent, SSHO and QC Manager may be the same person

4. Can the period of performance be extended after award once the material/equipment lead times are confirmed due to current market conditions for the equipment for this project?

A: The period of performance was established based on estimated delivery times and market conditions and intends to administer the contract in accordance with that requirement but also subject to the allowable delays listed in Federal Acquisition Regulation 52.249-10.