This document is an Amendment 1 to Solicitation 12805B24Q0239 for Barrier Autoclave Drain Repair. The solicitation is being issued by the USDA Agricultural Research Service National Bio and Agro-Defense Facility (NBAF) in Manhattan, KS. It is a request for quote (RFQ) for a firm fixed price purchase order to repair the drain system on the facility's barrier autoclaves.

The key details include:

  • The quote due date has been extended from May 23, 2024 to May 28, 2024.
  • Contractors must acknowledge receipt of this amendment and include the signed SF30 form in their quote package.
  • Responses must include an active SAM.gov registration and completion of the FAR 52.204-24 representations.
  • The government will evaluate quotes based on technical acceptability, past performance, and price to determine the lowest price, technically acceptable offer.
  • The work includes coring concrete, replacing concrete, welding, pressure testing, and other repair activities on the autoclave drain systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12805B24Q0239 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12805B

FORT COLLINS CO 80526

BLDG D, SUITE 300

2150 CENTRE AVENUE

USDA ARS PA AAO ACQ/PER PROP

05/21/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/30/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Industry Questions and Answers Included.

Please acknowledge on SF30 and include signed SF30 in quote package.

LIST OF CHANGES:

Quote due date : 23-May-24 changed to 28-May-24

Please review Industry Questions and Answers, attached.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

JOSEPH A. COVARRUBIO

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

X 1

05/21/2024 Questions and Answers for 12805B24Q0239 Barrier Autoclave Drain Repair

1. Please confirm all personnel are required to complete the 2-hour NBAF Site Security and Safety Orientation prior to working on site. Yes

2. In order to expose enough of the embed pipe to perform welding, a portion of the concrete slab around the pipe will need to be cored. Will the USDA allow coring of the concrete around the piping to expose more of the embedded pipe? Yes

3. Does the floor consist of a two-part system where there is an upper, top slab and an under slab that acts as a biological containment barrier? If so, please confirm the top slab is not considered a containment barrier and by removing a portion of it the contractor is not breaching containment. Yes under the two small Autoclaves there is a 6in topping slab with 4x4 wire mesh. The two larger Autoclaves down in the pit are on a 3 ¼ in topping slab.

4. Can the infill of the slab removed for welding be replaced with a bag mix style of concrete?

If so, please specify what specific mix the government wants the contractor to use and specifications (Sika and other vendors have many different varieties). Yes Rapid Set Cement All see attached PDF.

5. Is there a specific sealant that is required to be used around the base of the pipe where it meets the floor? If so, please provide the type of sealant and specifications. If concrete goes tight to pipe no sealant if there is a gap, Specs list three options a. Pecora Corporation; 898.

b. Tremco; Tremsil 600 White. c. Dow Corning 786.

6. Is the existing epoxy flooring still under warranty? Can a color and finish of the epoxy flooring to be repaired once the welding is completed be provided? If the color is no longer available, is the contractor to redo the entire floor area contained within the autoclave cabinets? If so, at what depth in the multilayer coating is the contractor to remove to and replace? Warranty expired in 2023.

7. Is there sufficient power in the area for welding? Yes there are several 120v 20 amp circuits in the area.

8. Are there other welding fume containment and air scrubbing requirements for the space outside of OSHA requirements for protecting workers? (ie. requirements to protect in HEPA filters in the area) No

9. Will the USDA require the stainless-steel pipe to be passivated with liquid per the original project specifications or with a passivation paste? Either process is sufficient.

10. For cleaning of the pipe of debris, will water suffice or will the USDA require another cleaner? If another cleaner, please specify and provide product specifications. Yes

11. To hydrostatically pressure check the repairs per the PWS 3.4.3 item, where both upstream and downstream of the 4 fittings to be repaired can the line be isolated to hold pressure?

Not sure understand the question. Would using a double inflatable bladder work?

12. At the site visit it was mentioned the autoclave vendor was going to be responsible for moving piping, electrical, and other items out of the way to gain access to work. However, PWS item 3.4.1 states the contractor would have to work around those items. Please confirm if the autoclave vendor is responsible for removing and reinstalling those items for the repairs or if it is the contractor. USDA will remove all items bolted and threaded to allow contractor as much room as possible.

13. If autoclave vendor is responsible for moving items in way of the drain repair, how long will it take them to disassemble? USDA Facilities stated they will have all items removed prior to contractors’ arrival. Estimated 1 day per autoclave.

14. How many autoclaves can be out of service at a time to perform the repairs? Would like to always keep one autoclave operational if possible. Is piping installed in a manner that will

05/21/2024 Questions and Answers for 12805B24Q0239 Barrier Autoclave Drain Repair even allow autoclaves to remain in service while repairs on another are occurring? The contractor’s discretion. Or are all drains to be repaired at once?

15. Can work occur during normal business hours or is after hours work required? Normal business hours

16. Can crews bring material around through the north entrance to the back of the facility or must they go through the west entrance? If crews can use the north entrance, will all equipment and materials need to pass through Transshipping for scanning? Contactor can request North gate access. Materials need to go thru the north gate and will be checked per normal inspection procedures. They do not need to be x-rayed in TSSG.

17. Will contractor tools and/or personnel need to be decontaminated prior to entry to the space and at leaving of each shift? No this is out side of containment.

PRODUCT DATASHEET

DESCRIPTION: Rapid Set® CEMENT ALL® is a high-performance, fast-setting, multi-purpose concrete repair material and non-shrink grout. Durable in wet environments, CEMENT ALL is a blend of Rapid Set hydraulic cement and specially graded fine aggregates. CEMENT ALL is non-metallic and no chlorides are added. Mix CEMENT ALL with water to produce a workable, high quality material that is ideal where rapid strength gain and high durability are desired. CEMENT ALL sets in 15 minutes and achieves structural strength in 1 hour.*

USES: Use CEMENT ALL for general and structural concrete repair, doweling and anchoring, industrial grouting, formed work, vertical and horizontal trowel applications.

CEMENT ALL is ideal for airport, highway, industrial and marine applications.

ENVIRONMENTAL ADVANTAGES: Use CEMENT ALL to reduce your carbon footprint and lower your environmental impact. Production of Rapid Set cement emits far less CO2 than portland cement. Contact your representative for LEED values and environmental information.

APPLICATION: Apply CEMENT ALL in thicknesses from featheredge to 4" (10 cm). For heavy loads and vehicle traffic, minimum thickness will vary. For deeper sections, use Rapid Set® Mortar Mix or Rapid Set® Concrete Mix. Not intended for high heat applications above 300°F (149°C). For overlay applications, a minimum of one test section should be prepared to evaluate the suitability of the materials and procedures.

SURFACE PREPARATION: For repairs, application surface must be clean, sound and free from any materials that may inhibit bond, such as oil, asphalt, curing compound, acid, dirt and loose debris. Roughen surface and remove all unsound material. Apply CEMENT ALL to a surface that is thoroughly saturated with no standing water.

MIXING: The use of a power-driven mechanical mixer, such as a mortar mixer or a drill-mounted mixer, is recommended. Organize work so that all personnel and equipment are in place before mixing. Use clean potable water. CEMENT ALL may be mixed using 3 to 3.75 quarts (2.8 L to 3.5 L) of water per 55-lb (25 kg) bag for Department of Transportation projects and other critical applications. For general purpose and high fluidity applications, a maximum of 5 quarts (4.7 L) may be used. Use less water to achieve higher strengths. For increased fluidity and workability, use Rapid Set® FLOW Control® plasticizing admixture from the Rapid Set® Concrete Pharmacy®.

Place the desired quantity of mix water into the mixing container. While the mixer is running, add CEMENT ALL. Mix for the minimum amount of time required to achieve a lump-free, uniform consistency (usually 1 to 3 minutes). Do not retemper.

PLACEMENT: CEMENT ALL may be placed using traditional construction methods.

Organize work so that all personnel and equipment are ready before placement. Place, consolidate and screed quickly to allow for maximum finishing time. Use a method of consolidation that eliminates air voids. Do not wait for bleed water; apply final finish as soon as possible. CEMENT ALL may be troweled, floated or broom finished. On flat work, do not install in layers. Install full-depth sections and progress horizontally. Do not install on frozen surfaces. To extend working time, use Rapid Set® SET Control® retarding admixture from the Concrete Pharmacy or cold mix water. CEMENT ALL may be applied in temperatures ranging from 45°F to 90°F (7°C to 32°C). Under dry ambient conditions, water based coatings such as latex paint can be applied after 4 hours. Solvent based and impermeable coatings such as oil based paint and epoxy can be applied after 16 hours.

CEMENT ALL

Multi-Purpose Repair Material & Non-Shrink Grout

PRO

D

UCT CATALO

G

REPAIR &

RESTO

RATIO

N

OVERVIEW

Highlights:

Fast: Sets in 15 minutes, structural strength in 1 hour*

Durable: Formulated for long life in critical applications

Excellent Bond: Superior adhesion to concrete, stone, brick, block, stucco and more

Structural: For repair and new construction

Multi-Purpose: Use for concrete repair, grouting, anchoring, casting, underlayment and more

Conforms to:

ASTM: C1107, C928 R3, C387

Army Corps of Engineers CRD C621

LA Research and Report 24654

Approved:

State (DOT) and local approvals

MasterFormat® 2016

03 01 30 Maintenance of Cast-in-Place Concrete

03 01 40 Maintenance of Precast Concrete

03 01 60 Maintenance of Grouting

03 01 70 Maintenance of Mass Concrete

03 53 19 Concrete Overlayment

03 54 16 Hydraulic Cement Underlayment

03 60 00 Grouting

03 61 00 Cementitious Grouting

03 62 13 Non-Metallic Non-Shrink Grouting

04 01 00 Maintenance of Masonry

Manufacturer:

CTS Cement Manufacturing Corp.

12442 Knott St.

Garden Grove, CA 92841 Tel: 800-929-3030 | Fax: 714-379-8270 Web: www.CTScement.com E-mail: info@CTScement.com

Amendment 1 12805B24Q0239
Questions and Answers
Rapid Set Cement All