This document contains a bid schedule for a federal construction contract solicitation. The contractor will provide all labor, materials, equipment and supervision to construct shade structures and other facilities at multiple agricultural research locations according to attached specifications and drawings. Pricing is requested for a base bid to construct structures at two locations, as well as six alternates that include additional portable shade structures, metal buildings and hoop barns at various sites. Bid prices must be rounded to the nearest dollar and remain valid for either 45 or 160 days depending on the item. The successful contractor must provide its System for Award Management Unique Entity Identifier. The related federal opportunity is solicitation number 12805B23R0016 issued by the Department of Agriculture Agricultural Research Service to construct shade structures in a second phase at the Clay Center field locations.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION B- SUPPLIES AND SERVICES AND PRICE/COST
B.1 SCOPE OF CONTRACT
The Contractor shall furnish all labor, materials, equipment, supplies, transportation, utilities, and supervision for complete construction of the following in accordance with the clauses, specifications, drawings, attachments, and other terms and conditions set forth in the attached scope of work.
B.2 SCHEDULE OF ITEMS
**ROUND TO THE NEAREST DOLLAR, DO NOT USE CENTS
BASE BID ITEM: Base Bid pricing shall be valid for 45 days.
Item No. Description Price/Cost
0001 Base Item: 42 Middle and 42 W North. Location 29 (no portables) $ ____________ (shown on sheet sA102 and A105)
ALTERNATE BID ITEMS: All Bid Alternate Items pricing shall be valid for 160 days.
Item No. Description Price/Cost
0002 Alternate 1: Four Portable Structures. Provide 4 portable shade structures $ ____________
(shown on sheet A109). Deliver to location 29.
Alternate 2: Location 14 (no portables) and Location 12. Provide and install $ ____________ shades structures at location 14 and location 12 (sheets A106 and A108).
The portable shade structures shown on these sheets are NOT included in this alternate.
0004 Alternate 3: Location 46 metal building. Provide and install a 100ft x 60ft metal $ ____________ building (shown on sheet A104).
0005 Alternate 4: Location 18 Hoop Barn. Construct 60ft x 80ft hoop barn and fencing $ ____________
0006 $ ____________
0007 $ ____________
(shown on sheet A107).
Alternate 5: Four portable structures Provide 4 portable shade structures (shown on sheet A109) Deliver to location 14
Alternate 6: Four portable structures Provide 4 portable shade structures (shown on sheet A109) Deliver to location 29.
CONTRACTOR SAM Unique Entity ID (UEI): ___________________________
B.3 Period of Performance Base items to be completed 530 days after receipt of award. No additional time will be allotted for the award of bid alternates in Section C.1.
END OF SECTION
| undefined: |
| undefined_2: |
| undefined_3: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| undefined_7: |
| CONTRACTOR SAM Unique Entity ID UEI: |
File details come from the government source that posted it. Updated .