127EAY26Q0044-0001 Questions and Answers.pdf
PDF 92 KB Posted
- Attached to
- GAOA Road Maintenance Los Padres National Forest Federal contract opportunity
- Solicitation number
- Not on record
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Questions and Answers document for federal contract opportunity 127EAY26Q0044-0001, addressing clarifications for the Labrea Rattlesnake Road project.
The document addresses four key inquiries regarding project execution. First, it clarifies that the SCA Wage Determinations have been revised to reflect the correct work locations in San Luis Obispo and Santa Barbara County, rather than San Bernardino and Riverside County. Second, it confirms that four of the five marked locations on the Work Location Map are water crossings where 650 cubic yards of Class 1 riprap will be placed as spot surfacing, while the fifth location (#5) is designated for bunker block placement. Third, the document specifies that three bunker blocks will be installed at location #5 on the map, with each block weighing approximately 4,000 pounds. Fourth, regarding Pay Item 842 Cutting Side Vegetation, the contractor must thin vegetation to a width of 6 feet from the edge of the roadway on each side, completing the work in a single pass per side.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAY26Q0044-0001 SCA Wage Determination 20155643 SLO 051326.pdf | ||
| 127EAY26Q0044-0001 Project Location Data Road Maintenance LPNF.pdf | ||
| 127EAY26Q0044-0001 SF30 GAOA Road Maintenance LPNF.pdf | ||
| 127EAY26Q0044-0001 SCA Wage Determination 20155647 SB 051326.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
127EAY26Q0044-0001 Questions and Answers
1) Why is the wage determination set for San Bernardino and Riverside county when all of the work taking place will be in San Luis Obispo and Santa Barbara County?
Please see revised SCA Wage Determinations
2) In regards to the Labrea Rattlesnake rd project. There are (5) points on the last page of the "Work Location Map." Are all (5) of these points, water crossings? and if so, Is this where the 650 Cubic Yards of Class 1 rip rap is intended to go for the spot surfacing line item?
The first 4 locations are water crossings, where the Class 1 riprap will be placed.
The 5th location is the Bunker blocks
3) Where will the placement of the (3) bunker blocks be located and approximately how much does each on weigh.
#5 location on the map, 4000lbs each
4) In regards the Labrea Rattlesnake rd project. Pay item 842 Cutting Side Vegetation.
How far is the contractor supposed the thin each side of the road off of the centerline of the road?
6’ wide from edge of roadway, keeping it to one pass per side.