This document is Amendment 0001 to Solicitation No. 127EAX27Q0009, issued by the USDA-FS CSA Southwest 7 (Albuquerque, NM) on October 28, 2026. The amendment modifies Attachment 2 Statement of Work and Specification for the installation of a precast vault toilet structure at 100 Midas Canyon Road, Austin, NV 89310.

The key changes to the Base Bid scope of work require the contractor to provide all equipment and labor to load, transport, place, and install the government-furnished structure, with full responsibility for protecting the structure throughout all phases of performance. The contractor may be held liable for any damage caused during loading, transporting, offloading, or placing operations. The specification modifications to Specification 133450 Precast Vault Toilet Installation clarify that explosives shall not be used, limit the gravel leveling base to a maximum 6-inch thick leveled layer, and require strict conformance with CXT Gunnison precast vault restroom building manufacturer's recommended installation instructions available on the LB Foster website, with any deviations requiring written approval directly from LB Foster/CXT. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the original solicitation or as amended. All other terms and conditions of the solicitation remain unchanged and in full force and effect.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

127EAX27Q0009

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

7EAX

ALBUQUERQUE NM 87102-3498

333 BROADWAY BLVD SE

USDA-FS CSA SOUTHWEST 7

10/28/20260001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/16/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation No. 127EAX27Q0009 is amended to change Attachment 2 Statement of Work and

Specification as follows:

Scope of Contract

A Description of Work

Base Bid has been changed to add the following to paragraph one.

(100 Midas Canyon Road, Austin, NV 89310) The Contractor shall be responsible for providing all equipment and labor to load, transport, place and install government-furnished structure. The contractor shall be responsible for protecting the structure in all phases of the performance of the work. Contractor may be held responsible for any damage caused to the structure in the loading, transporting, offloading, or placing of the structure.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KRISTIN M. PEARCE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

127EAX27Q0009/0001

Specification 133450 Precast Vault Toilet

Installation is changed as follows:

3.6 B, Explosives shall not be used.

3.6 C, Gravel Leveling Base - the first sentence

is changed to read, The Contractor shall place a maximum 6-inch thick leveled layer of gravel.

The rest of paragraph C remains the same.

3.6 E has been added:

E. Manufacturer¿s recommended installation instructions for a CXT Gunnison precast vault restroom building can be found on the LB Foster

Website. Contractor shall conform with these specifications and the manufacturer¿s recommended instructions Any deviation from these specification shall require a recommended

IN-WRITING directly from LB Foster/CXT.

127EAX27Q0009 Questions and Answers 10-28-2026

(002)

See attached changed Attachment 2 Statement of

Work and Specification.

All other terms and conditions remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .