Attachment 5 SOW KRB_Fence Revision 2.docx
DOCX document 71 KB Posted
- Solicitation number
- 127EAX26Q0038
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the installation of exterior fencing at the Cibola National Forest and National Grassland Kiowa Rita Blanca Admin site located at 714 Main Street, Clayton, New Mexico. The contractor shall provide all personnel, equipment, tools, materials, supervision, and services necessary to install approximately 1,459 linear feet of six-foot-high chain-link security fencing with double-strand barbed wire topper, along with two manual-operated vehicle gates (one on the west side and one on the east side of the equipment yard). All fence posts shall be galvanized and set in concrete at ten-foot intervals. The work scope includes mobilization, demobilization, bonds, and taxes as the contractor's responsibility, with all materials to be furnished by the contractor. The site is an unsecured equipment yard containing road crew equipment, farm equipment, trailers, and miscellaneous heavy equipment; the fence upgrade is required due to recent concerns about theft and vandalism.
The contractor must submit a Proposed Project Plan within five business days of contract award defining responsibilities, timeline, risks, and milestones. Weekly status reports are required every Friday by 3:00 PM MST until contract expiration, and as-built drawings must be submitted after project completion documenting fence and gate locations. The contractor is responsible for complying with all applicable regulations and obtaining all necessary permits. Key personnel must demonstrate working knowledge of fencing projects, methods, installation techniques, and concrete work, with supporting documentation required. The Supervisors office operates Monday through Friday from 8:00 AM to 4:30 PM, and all site access must be coordinated with the Contracting Officer Representative and Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX26Q0038 0002.pdf | ||
| Attachment 9 Map Fence Perimeter with 2 Gates.docx | DOCX document | |
| Attachment 10 List of Attendees.docx | DOCX document | |
| Attachment 11 Wage Determination NM20260011 Mod 1.pdf | ||
| Attachment 8 RFI Log 001-034.docx | DOCX document | |
| Attachment 7 RFI Log 127EAX26Q0038 RFI 001-023 w responses.docx | DOCX document | |
| 127EAX26Q0038 0001.pdf | ||
| Attachment 6 SOI Kiowa_Rita Blanca Site Fence - revised.xlsx | XLSX spreadsheet | |
| Attachment 4 Map KRB Admin site.pdf | ||
| Attachment 2 Schedule of Items KRB Old Admin Site Fence Install.docx | DOCX document | |
| Attachment 1 Statement of Work KRB_Fence Revised.docx | DOCX document | |
| 127EAX26Q0038 SF1442.pdf | ||
| Attachment 3 Wage Determination NM20260011.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work 17 June 2026
Contents
| Project | 2 |
| General Information | 3 |
| 1.0 Scope of Work | 3 |
| 2.0 Background | 3 |
| Contractor Requirements | 3 |
| 3.0 Technical Requirements / Tasks | 3 |
| 4.0 Government Furnished | 3 |
| 5.0 Deliverables / Schedule | 4 |
| 6.0 Travel | 4 |
| 7.0 Contractor’s Key Personnel | 4 |
Project Cibola NF and NG Kiowa Rita Blanca Admin site Fence
General Information
1.0 Scope of Work
The contractor shall provide all personal, equipment, tools, materials, supervision and other items and non-personal services necessary to install the exterior fencing the Cibola National Forest and National Grassland Kiowa Rita Blanca Admin site including installation of vehicle gate.
All work shall be in accordance with the plans and specifications contained herein. Any change in the work schedule shall be submitted for approval in writing to the Contracting Officer prior to commencement for approval. No Changes to the specifications, terms or conditions of this Request for Quotations shall be made without the prior approval of the Contracting Officer. The contractor is responsible for complying with all applicable regulations and obtaining all permits for all work.
2.0 Background
The Cibola National Forest and National Grasslands Kiowa Rita Blanca District office is located at 714 Main St. Clayton, New Mexico 88415 and is approximately 0.75 acres and unsecure equipment yard. The current equipment yard contains Road Crew equipment and supplies, Farm equipment, Trailers and misc. heavy equipment. The current security system includes a four-strand barbed wire fence with cedar and metal T posts. Due to recent concerns about theft and vandalism we are requesting a six-foot chain-link security with a double strand barbed wire topper. Galvanized fence posts with will be set in concrete to secure them. Fence length will be 1459 linear feet with line posts set at every ten feet.
Location: 714 Main St Clayton, NM
Figure 1. Close up map of Cibola NF and NG KRB District office
Contractor Requirements
3.0 Technical Requirements / Tasks
Base:
Reconfigure existing Equipment yard including installation of 1459 ft of fence with double strand barbed wire atop of a six-foot-high chain link security fence. Installation of two vehicle gates that will be located on the West and east side of Equipment yard (admin site). Gate will be a manual operating gate that swings into the admin site and will be secured by a pad lock.
4.0 Government Furnished
No Materials will be furnished by the Forest Service. The Supervisors office will be open Monday thru Friday, 8 am to 4:30pm. Any access shall be coordinated with the Contracting Officer Representative and Contracting Officer.
5.0 Deliverables / Schedule
Key Deliverables
| Item No. |
| Deliverable |
| Objective |
| Due |
| 1 |
| Proposed Project Plan |
| Defining the responsibilities, timeline, risks, and milestones of contract objectives. Ref. Subtask 4.1.3 |
| No later than five (5) business days after contract award |
| 2 |
| Weekly Status Report |
| Report documenting tasks & issues weekly. Ref Task 5.1 |
| Weekly, every Friday, by 3:00 PM MST until the contract expires |
| 3 |
| As-built Drawings |
| An as-built drawing documenting location of Remodeled parking lot, including new fence and gate locations. |
| After Project Completion |
Base:
Task 1: Mobilization The Task Shall cover all mobilization, demobilization, bonds, and taxes by the contractor.
Task 2: Install Fence Contractor shall provide materials, labor, and equipment cost for fence extension. Installation of 7 ft tall fence with 1 ft tall single strand barbed wire on top of fence line to match existing. Refer to attached drawings for proposed fence locations. As per UFC 4-022-03/Physical Security Toolbox: Fences and Gates (usda.gov)
Task 3: Install Vehicle Gate Installation will include materials, labor, and equipment costs for one vehicle gate with 19’ minimum opening. Refer to attached drawing A2 for proposed vehicle gate locations. As per UFC 4-022-03/Physical Security Toolbox: Fences and Gates (usda.gov)
6.0 Travel
Work shall be performed on site at the Cibola NF and NG Admin site in Clayton New Mexico. Any travel arrangements will need to be made for timely completion of work and will be the responsibility of the contractor.
7.0 Contractor’s Key Personnel
Contractor should demonstrate a working knowledge of Fencing projects and methods including fencing, building, and installation of concrete. Submit a copy of documentation for the personal responsible for the work.