San Marcos RS Repaving_2025_PG 1-5_1.pdf

PDF 5 MB Posted

Attached to
Paving Fire Station Roads on Mt Pinos RD of the Los Padres NF
Solicitation number
127EAX26Q0020
Issued by

About this file

This is a project specification and design document for the San Marcos Fire Station Site Resurfacing project located in Santa Barbara County, California, within the Los Padres National Forest under USDA Forest Service Pacific Southwest Region management.

The project involves resurfacing work at the fire station site located at 5398 E Camino Cielo, Santa Barbara, CA 93105, accessible 7.8 miles north of the Highway 101/154 intersection. The scope includes 3-inch asphalt paving with concrete pad installation, specifically: removal and replacement of 3-inch asphalt over approximately 22,000 square feet, installation of a 30-foot by 30-foot by 6-inch concrete pad, and 6-inch asphalt concrete curb construction. The estimated material tonnage is 399 tons. Pay items include mobilization, construction staking, contractor testing, erosion control and pollution control, roadbed reconditioning with asphalt pulverization, subgrade compaction, hot mix asphalt caltrans, parking lot markings, asphalt concrete curb, and concrete pad installation. The project is classified as a public works contract subject to Davis-Bacon prevailing wage requirements. Contractors must submit a construction schedule and traffic control plan for approval prior to work commencement. Standard specifications for roads and bridges on federal highway projects (FP-14) apply, along with California Department of Transportation specifications and Water Quality Management Best Management Practices for National Forest System lands. All project-generated debris must be legally disposed of by the contractor, and buried utility locating services must be contacted before excavation activities begin.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

SHEET OF

United States Department of Agriculture Forest Service

INDEX OF SHEETS

SHEET SHEET TITLE

G-01 TITLE SHEET

G-02 NOTES

G-03 SITE MAP

G-04 ESTIMATE OF QUANTITIES

C-01 CROSS SECTION TYPICAL

DRIVING DIRECTION:

GOOGLE MAPS SEARCH ADDRESS: 5398 E Camino Cielo, Santa Barbara, CA 93105. From the Hwy 101/154 Intersection in Santa Barbara Travel North on CA-154 W/San Marcos Pass Rd 7.8 Miles.Turn right on East Camino Cielo. The Fire Station is on the left.

PREPARED BY:

APPROVED:

CIVIL ENGINEER DATE

FOREST ENGINEER DATE

DISTRICT RANGER DATE

R05 PACIFIC SOUTHWEST REGION

LOS PADRES NATIONAL FOREST

SANTA BARBARA COUNTY, CALIFORNIA

SAN MARCOS FIRE STATION SITE RESURFACING

RECOMMENDED BY:

SUBJECT

AREA

AutoCAD SHX Text

STATE OF CALIFORNIA

AutoCAD SHX Text

INDEX MAP - N.T.S.

AutoCAD SHX Text

MEXICO

AutoCAD SHX Text

OREGON

AutoCAD SHX Text

PACIFIC

AutoCAD SHX Text

OCEAN

AutoCAD SHX Text

EUREKA

AutoCAD SHX Text

REDDING

AutoCAD SHX Text

SACRAMENTO

AutoCAD SHX Text

SONORA

AutoCAD SHX Text

NEVADA

AutoCAD SHX Text

RENO

AutoCAD SHX Text

NEEDLES

AutoCAD SHX Text

BAKERSFIELD

AutoCAD SHX Text

FRESNO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

FRANSICO

AutoCAD SHX Text

LOS

AutoCAD SHX Text

ANGELES

AutoCAD SHX Text

LOS PADRES

AutoCAD SHX Text

NATIONAL FOREST

WORK NOTES:

1. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM

COMMERCIAL SOURCES.

2. THE CONTRACTOR IS RESPONSIBLE FOR WATER.

3. ALL PROJECT GENERATED DEBRIS AND WASTE MATERIAL SHALL BE REMOVED FROM

THE FOREST LAND AND DISPOSED OF LEGALLY BY THE CONTRACTOR.

4. UNLESS SPECIFIED OTHERWISE, STANDARD SPECIFICATIONS FOR ROADS AND

BRIDGES ON FEDERAL HIGHWAY PROJECTS APPLY; FP-14 IS AVAILABLE ON-LINE AT

https://flh.fhwa.dot.gov/resources/specs/fp-14/fp14.pdf AND FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (attached in contract document)

5. IF STATE OF CALIFORNIA SPECIFICATIONS OR TYPICAL ARE REFERRED TO,

DOWNLOAD IS AVAILABLE AT

http://www.dot.ca.gov/hq/esc/oe/construction_contract_standards/std_specs /2015_StdSpecs/2015_StdSpecs.pdf

AND

http://www.dot.ca.gov/hq/esc/oe/project_plans/HTM/stdplns-US-customary-units-new15.htm

6. BMPs, FIBER ROLLS SOIL AND SEDIMENT CONTROL INFORMATION:

http://www.dot.ca.gov/hq/construc/stormwater/CSBMP-May-2017-Final.pdf

7. TEMPORARY TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MANUAL ON

UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) 2009 VERSION, ELECTRONIC COPY IS

AVAILABLE AT

http://mutcd.fhwa.dot.gov/pdfs/2009r1r2/mutcd2009r1r2edition.pdf

8. QUALITY CONTROL AND TESTING AS REQUIRED BY SPECIFICATIONS IS THE

CONTRACTOR RESPONSIBILITY, INSPECTIONS CONDUCTED BY FOREST SERVICE

EMPLOYEES ARE FOR THE GOVERNMENT REFERENCE PURPOSES ONLY.

GENERAL NOTES:

1. THIS IS A PUBLIC WORKS CONTRACT. DAVIS BACON PREVAILING WAGES APPLY.

2. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE TO THE C.O.

PRIOR TO THE START OF WORK

3. THE CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE C.O. FOR

APPROVAL PRIOR TO ANY WORK

4. WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED

INCIDENTAL TO OTHER PAY ITEMS

5. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT

A SERVICE TO LOCATE ANY BURIED UTILITIES. USA=1-800-227-2600 , THE

NATIONAL 811 NUMBER, OR THE WEBSITE http:/www.call811.com

6. EROSION PREVENTION AND CONTROL DURING OPERATIONS- SET THE MINIMUM

CONSTRUCTION LIMITS NEEDED FOR THE PROJECT AND CONFINE DISTURBANCE

WITHIN THIS AREA. MONITOR & MAINTAIN EROSION CONTROLS (I.E. SILT FENCES,

STRAW WATTLES, ETC) AS NEEDED THROUGH CONSTRUCTION AND REMOVE

THEM ONCE SOURCES OF EROSION ARE ELIMINATED

7. THE CONTRACTOR SHALL MEET THE REQUIREMENTS OF CHAPTERS 10, 11, & 12.2

IN THEIR ENTIRETY OF "WATER QUALITY MANAGEMENT FOR NATIONAL FOREST

SYSTEM LANDS IN CALIFORNIA BEST MANAGEMENT PRACTICES" DATED

SEPTEMBER 2000

http://www.fs.usda.gov/Internet/FSE_DOCUMENTS/stelprdb5362512.pdf

8. EQUIPMENT, FOR THIS PROJECT, IF DRIVEN ON STATE OR COUNTY ROADS SHALL

BE CURRENTLY LICENSED.

NTS

SHEET 2 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

1/16/25

TL

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

LOS PADRES N.F.

AutoCAD SHX Text

NOTES

AutoCAD SHX Text G-02

AutoCAD SHX Text

SAN MARCOS FIRE STATION

SITE RESURFACING

=6" AC CURB

=30'x30'x6" CONCRETE PAD

=3" ASPHALT REMOVE

AND REPLACE

NAMP

NTS

SHEET 3 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

6/15/24

M.M

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

LOS PADRES N.F.

AutoCAD SHX Text

SITE PLAN

AutoCAD SHX Text G-03

AutoCAD SHX Text

SAN MARCOS FIRE STATION

NAMP

NTS

SHEET 4 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

6/15/24

M.M

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

LOS PADRES N.F.

AutoCAD SHX Text

ESTIMATED QUANTITIES

AutoCAD SHX Text G-04

AutoCAD SHX Text

SAN MARCOS FIRE STATION

#4 rebar, equally spaced (x12) #4 rebar, equally spaced (x20)

30'x30' Typical'

CONCRETE SLAB SECTION (N.T.S.)

#4 rebar, equally spaced (x20)

#4 rebar, equally spaced (x12)

30' Typical

CONCRETE SLAB PROFILE (N.T.S.)

Engine Bay Garage

New Asphalt

2 in.

TYP.

WIDTH VARIES THROUGH OUT SITE

EXISTING PAVED SURFACE AVERAGE 3"

EXISTING SLOPE VARIABLETYPICAL EXISTING SECTION (N.T.S.)

MAINTAIN EXISTING

CONFIGURATION

EXISTING SLOPE VARIES

CONSTRUCTION LIMITS TYP.

NEW ASPHALT OVERLAY

EXISTING DITCH

CROSS SLOPE VARIES

EXISTING BASE VARIES 0 - 4"

EXISTING SLOPE VARIABLE

COMPACT ASPHALT BASE OR EXISTING

SUBGRADE TO 95% MAX DENSITY

ASPHALT PROFILE (N.T.S.)

NAMP

NTS

SHEET 5 OF 5

DRAWING

PROJECT NUMBER

CHECKED BY

SCALE

DATE

CHECKED BY

DESIGNED BY

DRAWN BY

FO

R

ES

T:

D R

A W

IN

G

PR

O

JE

C

T N

A M

E:

N A

M E:

FOREST

REGION

SOUTHWEST

PACIFIC

DATENO. REVISIONS

R5

SERVICE

U S D A

6/15/24

M.M

F.K.

F.K.

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text V

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text U

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text G

AutoCAD SHX Text A

AutoCAD SHX Text

LOS PADRES N.F.

AutoCAD SHX Text

CROSS SECTION TYPICAL

AutoCAD SHX Text C-01

AutoCAD SHX Text

SAN MARCOS FIRE STATION

Sheets and Views
San Marcos RS Repaving_2025_PG 1-5-Model
San Marcos RS Repaving_2025_PG 1-5-COVER
San Marcos RS Repaving_2025_PG 1-5-Sheet 2 Notes
San Marcos RS Repaving_2025_PG 1-5-Sheet 3 Site
San Marcos RS Repaving_2025_PG 1-5-Sheet 4 Qty
San Marcos RS Repaving_2025_PG 1-5-Sheet 5 Cross Section

File details come from the government source that posted it. Updated .