This is a Request for Information (RFI) Log documenting nine clarifications submitted by contractors during the pre-solicitation phase for the Paving of the Romero Camusa Road and fire station resurfacing project (Solicitation 127EAX26Q0020) issued by the Department of Agriculture Forest Service. The solicitation has a RFI close date of April 23, 2026, and involves asphalt pulverizing and repaving work on one base contract road (1.3 miles) plus five optional fire station locations across three ranger districts within Los Padres National Forest.

Key clarifications addressed in the RFI log include: confirmation that the organized site visit is scheduled for Tuesday, April 14, 2026 (Amendment 0001); revision of the Schedule of Items and plans to add asphalt concrete curb at San Marcos Fire Station; contractor responsibility for water supply for road and fire station work; coordination requirements for fire station work on a station-by-station basis; confirmation that the Romero Camusa road will remain closed to traffic during construction with resident coordination needed; confirmation of a 120-day project completion timeline for both road and fire stations; incorporation of mandatory FAR 52.222-90 DEI clause (Amendment 0002); specification that concrete mix designs are referenced in specification FP-14 section 501.01; and clarification that the estimated 50 cubic yards of Class II Base is contingency material for subgrade rehabilitation and compaction, to be used only if needed following pulverization work. This acquisition is a Total Small Business Set-Aside with a $19 million size standard under NAICS code 237310 (Highway, Street, and Bridge Construction).

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOG

Project Name:Paving of the Romero Camusa Road, Casitas Fire Station, Ojai Ranger Station, San Marcos Station and Rincon fire station - Los Padres NF, CA
Solicitation No.127EAX26Q0020
RFI LOG
Date:Solicitation Date 7 April 2026RFI Close Date 23 April 2026
RFI NO.DATE RECEIVED BY EFTSPEC SECTIONDESCRIPTIONDATE TO ENG./OWNERDATE FROM ENG./OWNERDATE TO CONTRACTORCOMMENTSTURN AROUND
0014/9/26Site VisitI would like to clarify the date for the organized site visit. The current draft mentions Monday, 14 April 2026; however, April 14, 2026, falls on a Tuesday.

Could you please confirm if the site visit is scheduled for Monday, April 13th, or Tuesday, April 14th?

4/9/264/9/264/9/26Amendment 0001, RFI 01 corrects day of the week of the organized site visit.0
0024/15/26Schedule of Item, MapSan Marcos Fire Station Site Resurface amendment4/15/264/15/264/22/26Revised the schedule of items and plans per the need to add the missed asphalt concrete (A/C) curb at the San Marcos Fire Station. See7
0034/22/26SOWWhere will we get water for the road and for each fire station?4/22/26Contractor will need to supply water-46134
0044/22/26PlansWill we have to do the fire station parking lots ½ at a time?4/22/26No. Coordination with each Fire station will need to scheduled in advanced. Prefered work on one station at a time.-46134
0054/22/26PlansWill the Base Bid, Romero Camusa road be closed to traffic while construction is ongoing?4/22/26Yes, its behind a closed gate, but there is some residents behind the gate. So coordination will be needed-46134
0064/22/26SOWIs the 120 days for completing the project for the road and fire stations?4/22/26Yes-46134
0074/22/26ClausesIncorporate the mandatory contract clause FAR 52.222 90, Addressing DEI Discrimination by Federal Contractors, as required by Executive Order 14398.4/22/264/22/264/22/26Incorporated DEI clause into solicitation with Amendment 2.0
0084/23/26PlansUpon looking at the plans and details there is not a Concrete Mix Design specified to use. Would you be able to provide a mix design to use for the 30'x30'x6" Reinforced Concrete Slabs at the various locations so we can accurately bid this portion of the project?4/23/26The Schedule of Items states FP-14 spec 501.01. That give all the specifications and concrete composition in table 501-1-46135
0094/23/26plansWe are looking for clarification in the Base Contract. The contract estimates 50 CY of Class II Base. However its not specified where the Class II will be placed. Is the quantity given for incidental for subgrade rehabilitation? Please clarify if its a specific area that requires Class II Base or if its for any area where sub grade needs remediation.4/23/26This is insurance in case the asphalt is thin in areas and addition base is needed to get compaction. There is the possibility that it is not needed, but we will only know once the pulverization is completed.-46135
0100
0110
0120
0130
014
0150
0160
0
0
0
0
0
018R
0190
019R
0200
0210
0220
0230
023R
0240
0250
0260
026R0
0270
0280
0290
0300
0310
0320
0330
0340
0350
0360
0370
0380
0390
0400
0410
0420
0430
0440
0450
045R0
0460
0470
047R0
0480
0490
0500
0510
051R0
0520
0530
053R0
0540
0550
0560
0570
0580
0590
0600
0610
0620
0630
0640
0650
0660
0670
0680
068R0
0690
069R0
0700
0710
0720
0730
0740
0750
0760
0770
0780
079
0800
0810
0820
0830
0840
0850
0860
0870
0880
0890
0900
0910
0920
0930
0940
0950
0960
0970
0980
0990
1000
1010
1020
1030
1040
1050
1060
1070
1080
1090
1100
1110
1120
1130
1140
1150
1160
1170
1180
1190
1200
1210
1220
1230
1240
1250
1260
1270
1280
1290
130
1310
1320
1330
1340
1350
1360
1370
1380
1390
1400
1410
1420
1430
1440
1450
1460
1470
1480
1490
1500
1510
1520
1530
1540
1550
1560
1570
1580
1590
1600
1610
1620
1630
1640
1650
1660
1670
1680
1690
1700
1710
1720
1730
1740
1750
1760
1770
1780
1790
1800
1810
1820
1830
1840
1850
1860
1870
1880
1890
1900
1910
1920
1930
1940
1950
1960
1970
1980
1990
2000
2010
2020
2030
2040
2050
2060
2070
2080
2090
2100
2110
2120
2130
2140
2150
2160
2170
2180
2190
2200
2210
2220
2230
2240
2250
2260
2270
2280
2290
2300
2310
2320
2330
2340
2350
2360
2370
2380
2390
2400
2410
2420
2430
2440
2450
2460
2470
2480
2490
2500
2510
2520
2530
2540
2550
2560
2570
2580
2590
2600
2610
2620
2630
2640
2650
2660
2670
2680
2690
2700
2710
2720
2730
2740
2750
2760
2770
2780
2790
2800
2810
2820
2830
2840
2850
2860
2870
2880
2890
2900
2910
2920
2930
2940
2950
2960
2970
2980
2990
3000
3010
3020
3030
3040
3050
3060
3070
3080
3090
3100
3110
3120
3130
3140
3150
3160
3170
3180
3190
3200
3210
3220
3230
3240
3250
3260
3270
3280
3290
3300
3310
3320
3330
3340
3350
3360
3370
3380
3390
3400
3410
3420
3430
3440
3450
3460
3470
3480
3490
3500
3510
3520
3530
3540
3550
3560
3570
3580
3590
3600
3610
3620
3630
3640
3650
3660
3670
3680
3690
3700
3710
3720
3730
3740
3750
3760
3770
3780
3790
3800
3810
3820
3830
3840
3850
3860
3870
3880
3890
3900
3910
3920
3930
3940
3950
3960
3970
3980
3990
4000
4010
4020
4030
4040
4050
4060
4070
4080
4090
4100
4110
4120
4130
4140
4150
4160
4170
4180
4190
4200
4210
4220
4230
4240
4250
4260
4270
4280
4290
4300
4310
4320
4330
4340
4350
4360
4370
4380
4390
4400
4410
4420
4430
4440
4450
4460
4470
4480
4490
4500
4510
4520
4530
4540
4550
4560
4570
4580
4590
4600
4610
4620
4630
4640
4650
4660
4670
4680
4690
4700
4710
4720
4730
4740
4750
4760
4770
4780
4790
4800
4810
4820
4830
4840
4850
4860

&7Prepared by EFT Architects, Inc. &7Page No.&P

File details come from the government source that posted it. Updated .