Granite Reef Improvements Specifications.pdf
PDF 618 KB Posted
- Solicitation number
- 127EAX25R0001
About this file
These are technical specifications for the Granite Reef Recreational Site Improvements project in the Tonto National Forest, located near Mesa, Arizona. The comprehensive specifications cover multiple construction aspects, including site preparation, demolition, and reconstruction of a recreational area along the Salt River. Key elements include constructing a new paved access road with approximately 120 passenger vehicle parking spaces, installing 8 single-family accessible picnic units with concrete pads, picnic tables, and pedestal grills, adding three pre-cast concrete vault toilet buildings (including relocating an existing vault toilet), creating concrete pathways, installing a 3-panel information kiosk, and implementing dumpster facilities. The project emphasizes accessibility, with sidewalks and facilities designed to meet Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG), and aims to improve parking safety and recreational infrastructure while maintaining environmental considerations such as proper excavation, backfilling, erosion control, and compliance with local regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Granite Reef QAs.docx | DOCX document | |
| 127EAX25R0001 Amendment 0002.pdf | ||
| Updated CAD.pdf | ||
| 127EAX25R0001 Amendment.pdf | ||
| 127EAX25R0001.pdf | ||
| Granite Reef Improvements Final.pdf | ||
| Updated Presolicitation Notice.pdf | ||
| Presolicitation Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOUTHWEST REGION 03
TONTO NATIONAL FOREST
GRANITE REEF RECREATIONAL SITE
MESA RANGER DISTRICT
08/15/2024
Specifications
U.S. FOREST SERVICE
01000-1
DIVISION 1 - GENERAL REQUIREMENTS
PROJECT COORDINATION - 01000
PART 1 - GENERAL
1.1 - Description
This work shall consist of coordination with government agencies and the general public.
1.2 - Related Sections
01010 - Summary of Work
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Government Agencies
All permits necessary for construction and occupancy of the project shall be obtained by the Contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement
Work under this section will not be measured for payment, but is included in all other items in the contract.
4.2 - Payment
Separate payment will not be made.
END OF SPECIFICATION 01000
01010-1
SUMMARY OF WORK - 01010
1.1 - Location
The proposed recreational site is located on the Mesa Ranger District of the Tonto National Forest near Mesa, Arizona.
1.2 - Site Work
The site serves as a day use area and access point to the Salt River, that is heavily used by multiple recreational groups. Lack of adequate parking on the site has led to dangerous parking occurring on the sides of the highway near the day use site. Due to the popularity of recreating on the Salt River and ever-increasing use along its corridor, this site needs a complete overhaul to maximize capacity in the parking area, control parking along the dangerous highway, and provide safer access points to the river.
All work shall be completed in accordance with the project specifications and drawings. The work includes all labor, materials, and equipment necessary to perform all operations for the work specified.
The Contractor shall be responsible for the layout survey, construction control, and establishing and maintaining all horizontal and vertical control required.
Demolition – The Granite Reef Recreational Site will require relocating one existing vault toilet. The toilet consists of a pre-cast concrete housing sitting on underground concrete vaults. Adjacent concrete around the existing vault toilet shall be removed and disposed of as marked by the Contracting Officer Representative (COR). The hole left from the removal of the existing vault shall be backfilled with suitable backfill and compacted in accordance with the project specifications.
Trees in construction areas, as specified in the plan, will be removed and disposed of.
Trees outside of the construction zone will be avoided and protected as specified in the plan. Existing pavement, curbs and sidewalks, and dumpster pad shall be demolished and removed. Existing picnic tables within the construction area shall be moved and stored for reinstallation at new picnic sites. Existing grills shall be removed.
Reconstruction - of this site will include a paved access road and parking areas and loading zones. The western loop provides overflow parking. This loop also provides a ramp with river access to be used by outfitter guides and emergency responders.
01010-2
The center of the site provides a one-way loop with passenger vehicle parking spaces including three accessible van spaces, and an unloading zone that leads to a river access point. The one-way road that leads to the exit of Granite Reef Recreational Site, to the east of the site, will provide parking for passenger vehicles including a large unloading zone that leads to the third river access point. The new road and parking areas also include pavement markings, wheel stops and signs. The project also includes three pre-cast concrete vault toilet buildings, three dumpster pads, and new informational kiosks.
Reconstruction of the Granite Reef Recreational Site will include 8 single-family picnic sites that will be placed between the parking area and the riverbank. Each unit will have a concrete pad, picnic table, and a pedestal grill. Picnic units will have concrete pathways leading from the site to parking, toilet buildings, and river access points. The sidewalks shall conform to Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG) requirements and the project specifications for construction and installation. Download it here: DRAFT (usda.gov)
Reconstruction of Granite Reef Recreational Site shall include the construction of three concrete river access points, including one boat ramp for outfitter guides and emergency responders, and two public river access points.
1.3 - Facilities and Services
A construction work camp will not be allowed. A Contractor’s staging and storage area will be allowed where approved by the COR. Transportation to and from the work site for personnel and materials will be at Contractor’s expense.
Electricity and potable water are not available at the site. Water for construction and dust control is not available from National Forest lands. Development, hauling and placement of water shall be considered incidental to other pay items.
1.4 - Material Sources
All materials are available from commercial sources.
1.5 - Subsurface Soils and Investigations
No auger borings were made in the area. Contractor shall undertake any site investigations necessary to ascertain the subsurface conditions.
1.6 - Clean-up and Disposal
Disposal of construction debris and waste shall be off National Forest land and in compliance with local laws regarding disposal of waste material.
https://www.fs.usda.gov/sites/default/files/FSORAG-2013-Update.1.pdf
01010-3
1.7 - Precautionary Measures
Protection of Work:
The Contractor shall take precautions necessary to protect all work during the construction period and shall maintain adequate protection during severe weather conditions to prevent damage to the work or materials.
Safety:
The Contractor is responsible for safeguarding the public, the Contractor's employees, existing facilities, and Forest resources from contract operations.
Precautions such as lowering tractor blades and safely storing materials shall be practiced preventing injury to others in the area.
Security:
No security shall be provided by the government. The contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. A security trailer with guards shall be permitted.
END OF SPECIFICATION 01010
01020-1
TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL - 01020
Prepare and submit a Storm Water Pollution Prevention Plan (SWPPP), Notice of Intent (NOI) and a Notice of Termination (NOT) for the project. Construct and maintain erosion control measures as outlined in the prepared SWPPP.
1.2 – Submittals
Submit a Storm Water Pollution Prevention Plan (SWPPP), Notice of Intent (NOI), Notice of Termination (NOT) for the project, and erosion control material product data for the project.
2.1 Materials
Ensure that erosion control materials meet the requirements specified in the SWPPP.
PART 3 – EXECUTION
3.1 Plan and Construction
Prior to the start of construction, prepare and submit a SWPPP, and the NOI according to the guidelines detailed by the Arizona Department of Environmental Quality (ADEQ) Statutes and Regulations as part of the requirements for an Arizona Pollutant Discharge Elimination System (AZPDES) General Permit for Storm Water Discharges from Construction Activities to Waters of the United States.
Four (4) copies of the SWPPP shall be prepared. The contractor shall maintain one copy at their office and one at the construction site. Two copies shall be submitted to the CO.
The NOI shall be submitted to the Arizona Department of Environmental Quality. A copy of the NOI shall also be submitted to the CO.
The contractor shall construct and maintain all erosion control measures indicated in the SWPPP, and as required by the AZPDES.
01020-2
The contractor shall perform inspections of the erosion control measures and shall prepare and maintain all required records and reports.
When construction is complete and accepted by the Forest Service, prepare and submit a NOT according to the guidelines detailed by the Arizona Department of Environmental Quality (ADEQ) Statutes and Regulations as part of the requirements for an Arizona Pollutant Discharge Elimination System (AZPDES) General Permit for Storm Water Discharges from Construction Activities to Waters of the United States.
The NOT shall be submitted to the Arizona Department of Environmental Quality. A copy of the NOT shall also be submitted to the CO.
PART 4 – MEASUREMENT AND PAYMENT
4.1 – Measurement
Use the method of measurement that is DESIGNATED IN THE SCHEDULE OF
ITEMS.
4.2 – Payment
The accepted quantities will be paid for at the contract unit price for each PAY
ITEM DESIGNATED IN THE SCHEDULE OF ITEMS.
Payment will be made under:
Pay Item Pay Unit
01020(01) Preparation and Submittal of SWPPP, NOI and NOT ………… LS
01020(02) Construction and Maintenance of Erosion Control Measures….LS
END OF SPECIFICATION 01020
01030-1
AIR POLLUTION CONTROL - 01030
Prepare and submit an application for a Dust Control Permit with Maricopa County Air Quality Department and close-out the Permit once the project is complete.
Construct and maintain air pollution control measures as outlined in the Permit and as directed by Maricopa County Air Quality Department.
2.1 Materials
Ensure that air pollution control materials and measures meet the requirements specified in the Dust Control Permit.
3.1 Plan and Construction
Prior to the start of construction, prepare and submit an Application for Dust Control Permit according to the guidelines detailed by the Maricopa County Air Quality Department.
Four (4) copies of the Permit shall be prepared. The contractor shall maintain one copy at their office and one at the construction site. Two copies shall be submitted to the CO.
The contractor shall construct and maintain all air pollution control measures indicated in the Permit, and as required by the Maricopa County Air Quality Department.
The contractor shall perform inspections of the air pollution control measures and shall prepare and maintain all required records and reports.
When construction is complete and accepted by the Forest Service, prepare and submit close-out materials according to the guidelines detailed by the Maricopa County Air Quality Department.
01030-2
01030(01) Preparation and Submittal of Application, . . . . . . . . . ……… LS and Close-Out Materials
01030(02) Construction and Maintenance of Dust Control Measures…... LS
END OF SPECIFICATION 01030
01101-1
DIVISION 1 GENERAL
ABBREVIATIONS - 01101
Organizations & Standards
Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows. Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials
ACI--American Concrete Institute
AISC--American Institute of Steel Construction
AISI--American Iron and Steel Institute
AITC--American Institute of Timber Construction
ANSI--American National Standards Institute
APA--American Plywood Association
API--American Petroleum Institute
ASME--American Society of Mechanical Engineers
ASTM--American Society for Testing and Material
ATCC--American Type Culture Collection
AWPA--American Wood Preservers Association
AWPB--American Wood Preservers Bureau
AWS--American Welding Society
AWWA--American Water Works Association
CFR--Code of Federal Regulations
CRSI--Concrete Reinforcing Steel Institute
CS--Commercial Standard issued by U.S. Department of Commerce
01101-2
DEMA--Diesel Engine Manufacturers Association
FAR--Federal Acquisition Regulation
FED SPEC. or FS-- Federal Specifications
FSS--Federal Specifications and Standards
GSA--General Services Administration
MAG—Maricopa Association of Governments
MIL--Military Specifications
MSHA--Mine Safety and Health Administration
MUTCD--Manual on Uniform Traffic Control Devices
NBFU--National Board of Fire Underwriters
NBS--National Bureau of Standards
NEMA--National Electrical Manufacturers Association
NESC--National Electrical Safety Code
NFPA--(Fire)--National Fire Protection Association
NFPA--(Forest)--National Forest Products Association
NWMA--National Woodwork Manufacturers Association
OSHA--Occupational Safety and Health Administration
PCA--Portland Cement Association
PCI--Prestressed Concrete Institute
PS--Product Standard issued by the U.S. Department of Commerce
PTI--Post-Tensioning Institute
RIS-Redwood Inspection Service
SAE--Society of Automotive Engineers
01101-3
SF--Standard Form
SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
USASI--United States of America Standards Institute
WCLIB--West Coast Lumber Inspection Bureau
WWPA--Western Wood Products Association
Pay Items & Pay Units
ABBREVIATIONS
Aluminum . . . . . . . . . . . . . . . . . . . . AL.
Asphalt . . . . . . . . . . . . . . . . . . . . ASP.
Barbed Wire . . . . . . . . . . . . . . . . . . B.W.
Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S. PIPE
Bituminous Surface Treatment BST Cement . . . . . . . . . . . . . . . . . . . . . CEMT.
Cement Treated . . . . . . . . . . . . . . . . . CEMT.-T.
Cement Treated Base . . . . . . . . . . . . . . CTB Clearing & Grubbing . . . . . . . . . . . . . . CLEAR & GRUB Compaction . . . . . . . . . . . . . . . . . . . CMPCT.
Concrete . . . . . . . . . . . . . . . . . . . . CONC.
Corrugated Metal Pipe . . . . . . . . . . . . . CMP Corrugated Steel Pipe . . . . . . . . . . . . . C.S.P.
Corrugated Steel Pipe Arch . . . . . . . . . . . C.S.P. ARCH Cubic Yard . . . . . . . . . . . . . . . . . . . C.Y.
Cubic Yard Mile . . . . . . . . . . . . . . . . C.Y.MI.
Diameter . . . . . . . . . . . . . . . . . . . . DIA.
Each . . . . . . . . . . . . . . . . . . . . . . EA.
Emulsified . . . . . . . . . . . . . . . . . . . EMLSFD.
Erosion and Pollution Control . . . . . . . . . E&P CONTROL Fabricated . . . . . . . . . . . . . . . . . . . FABR.
Finish Floor Elevation . . . . . . . . . . . . . F.F.E.
Foundation . . . . . . . . . . . . . . . . . . . FOUND.
Furnished . . . . . . . . . . . . . . . . . . . FURN.
Gallon . . . . . . . . . . . . . . . . . . . . . GAL.
Grade . . . . . . . . . . . . . . . . . . . . . GR.
Height . . . . . . . . . . . . . . . . . . . . . HT.
High Strength . . . . . . . . . . . . . . . . . H. STRENGTH Horizontal . . . . . . . . . . . . . . . . . . . HOR.
01101-4
Hour . . . . . . . . . . . . . . . . . . . . . . HR.
Linear Foot . . . . . . . . . . . . . . . . . . L.F.
Liquid . . . . . . . . . . . . . . . . . . . . . LIQ.
Loading . . . . . . . . . . . . . . . . . . . . LD.
Lump Sum . . . . . . . . . . . . . . . . . . . . L.S.
Material . . . . . . . . . . . . . . . . . . . . MAT'L Maximum . . . . . . . . . . . . . . . . . . . . MAX.
Method . . . . . . . . . . . . . . . . . . . . . M.
Mile . . . . . . . . . . . . . . . . . . . . . . MI.
Minimum . . . . . . . . . . . . . . . . . . . . MIN.
One Thousand Feet Board Measure . . . . . . . . MFBM One Thousand Gallons . . . . . . . . . . . . . . M.GALS.
One Thousand Gallons Mile . . . . . . . . . . . M.GALS.MI.
One Thousand Square Feet . . . . . . . . . . . . M.S.F.
Polyvinylchloride . . . . . . . . . . . . . . . PVC Pounds . . . . . . . . . . . . . . . . . . . . . LBS.
Reflectorized . . . . . . . . . . . . . . . . . REFLECT.
Section . . . . . . . . . . . . . . . . . . . . SEC.
Square Foot . . . . . . . . . . . . . . . . . . S.F.
Square Yard . . . . . . . . . . . . . . . . . . S.Y.
Station . . . . . . . . . . . . . . . . . . . . STA.
Station Yard . . . . . . . . . . . . . . . . . . STA. YD.
Strand . . . . . . . . . . . . . . . . . . . . . S.
Structural . . . . . . . . . . . . . . . . . . . STRUCT.
Structural Steel . . . . . . . . . . . . . . . . S. STEEL Stump . . . . . . . . . . . . . . . . . . . . . STMP Target Value . . . . . . . . . . . . . . . . . . TV Thickness . . . . . . . . . . . . . . . . . . . TH.
Ton Mile . . . . . . . . . . . . . . . . . . . . T.M.
Tops and Limbs . . . . . . . . . . . . . . . . . T&L Utilization of Timber . . . . . . . . . . . . . UOT Vertical . . . . . . . . . . . . . . . . . . . . VERT.
Welded Wire Fabric . . . . . . . . . . . . . . . W.W.F.
White . . . . . . . . . . . . . . . . . . . . . WH.
Width . . . . . . . . . . . . . . . . . . . . . W.
With . . . . . . . . . . . . . . . . . . . . . . W/ Without . . . . . . . . . . . . . . . . . . . . W/O Woven wire . . . . . . . . . . . . . . . . . . . W.W.
Yellow . . . . . . . . . . . . . . . . . . . . . YE.
END OF SPECIFICATION 01101
01102-1
DIVISION 1 - GENERAL
DEFINITIONS - 01102
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.
Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.
Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.
Berm. Curb or dike constructed to control runoff water or traffic flow.
Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.
Clearing Limits. The limits of clearing as designated on the ground or on the drawings.
Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.
Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.
Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
COR. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.
Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure
01102-2 that trees are dropped into previously cleared areas, or clear of any objects that are to remain.
Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.
Defect. A failure to meet a requirement with respect to a single quality characteristic.
Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.
Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.
Forest Service. The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.
Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.
Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.
Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.
01102-3
Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.
Materials. Any substance specified for use in the construction of the project and its appurtenances.
Maximum Density. The highest density that can be obtained under stated conditions.
Measurement. Determining and expressing the quantities of work or materials.
Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.
Neat Line. A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.
Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.
Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Pipe. A culvert that is circular (round) in cross-section.
Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).
Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.
Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.
Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
01102-4
Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.
Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Second Samples. A sample taken when the initial sample indicates that the material is defective.
Sidewalk. The portion of the roadway constructed primarily for pedestrian use.
Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.
Standard Specifications. Specifications approved for general application and repetitive use.
Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.
Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Tackifier. Binder for vegetative mulch.
Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.
Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.
END OF SPECIFICATION 01102
01103-1
MEASUREMENT AND PAYMENT - 01103
1.1 – Requirements
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the
SCHEDULE OF ITEMS.
1.2 – Payment
One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.
(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:
(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.
(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
Final payment will be made for the designed quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.
(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.
01103-2
(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.
1.3 - Units of Measurement:
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
01141-1
USE OF SITE AND PUBLIC CLOSURES - 01141
1.1 – Use of Site by Public
The Granite Reef Recreation area will be closed to the public during construction.
1.2 – Use of Site by Contractor
Storage Area: An area within the recreation area will be made available for use as a storage area. The CO shall approve the location of the area prior to its use. Toilet buildings shall not be used for storage.
Security Camp: An area at the recreation area shall be approved by the CO as a security camp for the Contractor’s personnel at no cost to the contractor. The contractor and all the personnel shall comply with Forest Service regulations relative to such use. The security camp shall not exceed four persons.
Sanitary Facilities: The contractor shall provide port-a-johns for the duration of the project. Toilet buildings are not to be used. Each port-a-john shall be located in separate areas of the project convenient to contractor’s personnel.
2.1 – Road Closure devices and signage
All signs and barricades shall be per the Manual on Uniform Traffic Control Devices (MUTCD), latest edition. Manual on Uniform Traffic Control Devices (MUTCD) - FHWA (dot.gov)
3.1 – Closure of the site to the public
The government will issue a closure order for the recreation area, and post closure signs.
The government cannot guarantee that the public will not enter the recreation area during the closure.
3.2 – Road Closure Devices
Closures for Bush Highway are not allowed. During the closure of the Granite Reef Recreation Area, the entrance and exit will require closure devices that the contractor https://mutcd.fhwa.dot.gov/index.htm https://mutcd.fhwa.dot.gov/index.htm
01141-2 shall furnish, erect, and maintain. The following closure devices (or approved equal) will be provided:
1. Two (1) Type III Barricade (8’ minimum width), with Road Closed (R11-2, 48” x 30”) sign mounted on barricade, and
2. Two (2) Drums with flashing warning lights (place one drum on each side of barricades).
01141(01) Temporary Road Closure Devices . . . . . . . . . …….LS
END OF SPECIFICATION 01141
01300 - 1
SUBMITTALS - 01300
1.1 - Requirements
It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the Government.
Submittals may also be referred to as shop drawings.
1.2 - Manufacturer's Literature and Shop Drawings
Submit two (2) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.
01300-2
Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 01020 – Temporary Soil Erosion and Water Pollution Control
a. SWPPP
b. NOI
c. NOT
d. Erosion Control Material Product Data
2. 01030 – Dust Control Measures
a. Permit
3. 01330 – As-Built Survey
4. 01410 – Quality Control and Quantity Measurement
a. Contractor's Representative Designation
b. Project Schedule
c. Quality Control Plan
d. Certificates of Compliance
e. Quantity Measurements
f. Test Results
5. 02224 – Imported Fill Material
a. Certificate of Compliance
b. Delivery Tickets
6. 02304 – Aggregate Base
a. Certificate of Compliance
b. Delivery Tickets
c. Test Results
7. 02270 – Riprap
a. Certificate of Compliance
8. 02511 – Asphalt Concrete Surfacing
a. Job-Mix Formula
b. Certificate of Compliance
c. Bill of Lading
d. Weight Tickets
e. Quality Control Test Results
9. 02580 – Accessible Parking Striping and Signage
a. Product Data
10. 02840 – Road Closure Devices
a. Shop Drawings
11. 03301 – Cast-in-Place Concrete
a. Mix Design
b. Admixtures
c. Delivery Tickets
d. Design for Construction of Cable Concrete Mat Ramps
e. Quality Control Tests
01300-3
f. Product Data for Wheel Stops
12. 09900 – Painting and Graffiti Protection
a. Paint Samples
13. 10437 – Recreation Amenities
a. Product Data
END OF SPECIFICATION 01300
01330-1
CONSTRUCTION SURVEYING - 01330
1.1 – Work
Construction surveying and staking of the project in accordance with the drawings and specifications. Furnish all labor, equipment, instruments, materials, transportation, and other incidentals necessary to complete the construction surveying and staking in accordance with these specifications and acceptable engineering practice. In addition, set grade-finishing stakes, and stake structures.
Conduct construction surveying and staking under the direction of a licensed professional land surveyor. Periodic visits to the project site are required.
2.1 – Stakes
Furnish stakes of the type and quality normally used in highway survey work, and suitable for the intended use. Furnish stakes and hubs of sufficient length to provide a solid set in the ground with sufficient surface area above ground for necessary legible markings.
2.1 – Government-Furnished Data
The government will set control points, and will furnish the Autocad drawing of the project for use in generating construction staking.
3.1 – Construction Surveying
Perform additional calculations for convenient use of government-furnished data.
Provide immediate notification of apparent errors in the initial staking or in government-furnished data.
Before surveying or staking, discuss and coordinate the following with the COR:
(1) Surveying and staking methods,
(2) Stake marking,
(3) Grade control for courses of material,
(4) Referencing,
(5) Structure control, and
01330-2
(6) Any other procedures and controls necessary for the work
All construction surveying and staking shall be within the tolerances shown in Table 170A. Survey field notes shall be prepared in an approved format. Furnish all field notes and calculations that support pay quantities. All field notes and supporting documentation become the property of the government upon completion of the work.
Start work only after staking for the affected work is accepted. The construction survey and staking work may be spot-checked for accuracy and unacceptable portions of work may be rejected. Resurvey rejected work and correct work that is not within the tolerances specified in Table 170-A. Acceptance of the construction staking does not relieve the Contractor of responsibility for correction of errors discovered during the work and for bearing all additional costs associated with the error. Remove and dispose of all flagging, lath, stakes, and other staking material after the project is complete.
(a) Control Points Relocate control points in conflict with construction to areas that will not be disturbed by construction operations. Furnish the coordinates (Northings & Eastings) and elevations for the relocated control points before the original points are disturbed.
(b) Roadway cross-section When required take cross-section normal to centerline. The centerline spacing between cross-section locations shall not exceed 50 feet. Take additional cross-sections at breaks in topography and at changes in the typical section. For each cross-section, measure and record points at breaks in topography, but at least every 15 feet. Measure and record points to at least the anticipated slopes and reference locations. Reduce all cross-section distances to horizontal distances from centerline.
(c) Slopes stakes and references Set slope stakes and references on both sides of centerline at the cross-section locations. Establish slope stakes in the field at the actual point of intersection of the design roadway slope with the natural ground line. Set slope stake references outside the clearing limits. Include all references point and slope stake information on the reference stakes. When initial references are provided, slope stakes may be set from these points with verification of the slope stake location with field measurements. Re-catch slope stake on any section that does not match the staking report within the tolerances established in Table 170-A. Take roadway cross-section data between centerline and the new slope stake location for determination of earthwork quantities if required by Section 160.05(b) or Section 161.02(b), set additional references even when initial references are provided.
(d) Clearing and grubbing limits Set clearing and grubbing limits on both sides of centerline at roadway cross-section locations, spurs, campsite use pads, and other areas requiring clearing.
(e) Centerline re-establishment
01330-3
Reestablish centerline from control points. Spacing between centerline points shall not exceed 50 feet. Establish centerline as many times as necessary to construct the work.
(f) Grade finishing stakes Set grade finishing stakes, for grade elevations and horizontal alignment, on centerline and on each shoulder of roadway. Except for roads 14 feet or less in width, NO centerline stakes shall be required. Set stakes at the top of subgrade and the top of each aggregate course. Where turnouts are constructed, set stakes on centerline, on each normal shoulder, and on the shoulder of the turnout. In parking areas, set stakes at the center and along the edges of the parking area. Set stakes in all ditches to be paved. The maximum spacing between stakes in any direction is 50 feet. Use brushes or guard stakes at each stake. Reset grade finishing stakes as many times as necessary to construct the subgrade and each aggregate course.
(g) Drainage structures Stake drainage structures to fit field conditions. The location of the structures may differ from the plans. Perform the following:
(1) Survey and record the ground profile along centerline of structure.
(2) Determine the slope catch points at the inlet and outlet.
(3) Set reference points and record information necessary to determine structure length and end treatments.
(4) Stake ditches or grade to make the structure functional.
(h) Intermediate surveying and staking Perform all surveying, staking, recording of data, and calculations as necessary to construct the project from the basic layout and controls established in (a) through
(g) above. Perform additional surveying and staking necessary to execute individual work items. Re-measure roadway excavation quantities if it has been determined that any portion of the work is acceptable but has not been completed to the lines, grades, and dimensions shown on the plans or established by the CO.
3.2 - As-Built Drawings
The Contractor shall maintain a set of the contract drawings depicting as-built conditions.
These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings.
Upon completion of the contract work, as-built drawings shall be submitted by the Contractor.
01330-4
Table 170-A Construction Survey and Staking Tolerances
STAKING PHASE HORIZONTAL (inches) VERTICAL (inches) Control Points 1:10,000 + 1/4 Centerline points including PC, PT, POT, and POC including references * 1:5,000 + 1/2
Other centerline points + 2 + 4 Cross-section points and slope stakes ** + 2 + 4 Slope stake references ** + 2 + 1 Culverts ditches, and minor drainage structures + 2 + 1
Retaining walls + 2 + 1 Clearing and grubbing limits + 12 -- Aggregate subgrade stakes + 2 + 1/2 Aggregate finish grade stakes + 2 + 1/2
*Centerline points: PC – point of curve, PT – point of tangent, POT-point on tangent, POC-point on curve. ** Take the cross-sections normal to the centerline +1 degree.
ITEMS. Do not measure intermediate surveying and staking for payment.
01330(01) Construction Surveying . . . . . . . . . …….LS 01330(02) As-Built Surveying . . . . . . . . . …….LS
END OF SPECIFICATION 01330
01410-1
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410
This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Related Work Specified Elsewhere
General Provisions FAR 52.236-5, Material and Workmanship General Provisions FAR 52.236-6, Superintendence by the Contractor General Provisions FAR 52.246-12, Inspection of Construction
1.3 - Submittals
Submittals under this section shall be furnished to the Engineer. Submittals include, but are not limited to the following:
Contractor's Representative Designation Project Schedule Quality Control Plan As Built Drawings Certificates-of-Compliance Quantity Measurements Test Results
3.1 - Contractor's Representative
Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
01410-2
3.2 - Project Schedule
Submit a project schedule stating information such as proposed dates of completion of various elements of construction.
3.3 - Quality Control Plan
The Quality Control Plan shall consist of the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the CO for review prior to the Contractor commencing work. Within 10 days of receipt of the plan, the CO shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the CO, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the CO.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
3.4 - Sampling, Testing, Inspection, and Measurement of Quantities
The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.
The Contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:________________________CONTRACT
No._____________________
Pay Item No. Test Date Location Standard Results Test By (Initials)
01410-3
The Contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be preformed.
The Contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies.
The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.5 - Certificates and Measurements
Certification:
The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications.
Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor.
Measurements:
The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The Contractor shall compute the quantities for periodic progress payments; the Engineer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_______________________CONTRACT No.__________________
Quantity or Pay Item Date Measurement Test By (Initials)
01410-4
3.6 - Materials
The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications.
Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
When the material sources are not designated as Government-furnished or the Contractor elects not to use designated sources, the Contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
There will be no separate measurement for this section.
This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01410
01570 - 1
MAINTENANCE FOR TRAFFIC - 01570
This section specifies the requirements for regulating traffic during project construction.
Contract Provisions - Protection of work, property, and jobsite safety 01000 - Project Coordination 01010 - Summary of Work
NONE
3.1 - Traffic Regulation
The construction site shall be closed to the public during construction operations.
Bush Highway can not be closed during construction.
The Contractor shall post advance warning signs on each side of the project along the Bush Highways where directed by the COR. All signs, placement and maintenance of signs shall be the responsibility of the Contractor. All signing, barricades, and traffic control shall conform to the MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), latest edition.
The Contractor is authorized to use Forest Service roads for all activities necessary for completion of the contract subject to the limitations and authorizations of this contract, when such use will not cause damage to the roads or National Forest resources and when traffic can be accommodated safely.
The work specified herein will not be measured for payment.
01570 - 2
This work is incidental to other items in this contract and direct separate item payment will not be made.
END OF SPECIFICATION 01570
01601 - 1
MOBILIZATION - 01601
This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
Progress payments will be made as follows:
The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon receipt of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
01601 - 2
Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.
The total of all payments shall not exceed the original contract amount for this item.
PAY ITEM DESCRIPTION PAY UNIT
01601(01) Mobilization (Including Bonding Cost) . . . . . . . . . . . . . . . . LS
END OF SPECIFICATION 01601
01740 - 1
CLEANING - 01740
1.1 – Clean up
A. The work site shall be maintained in a neat condition durning construction. The work site shall be kept free from accumulation of waste materials and rubbish resulting from the work.
B. If work is stopped or delayed for an extended period of time, the Contractor shall clean up the site as determined by the COR.
C. Before final acceptance of the project, the Contractor shall remove all waste materials and rubbish resulting from the work.
Not Used
PART 3 - EXECUTION
Not Used
Cleaning will not be measured for payment.
This work is incidental to other items in this contract and direct payment for Cleaning will not be made.
END OF SECTION - 01740
02071-1
DIVISION 2 - SITE WORK
REMOVAL OF STRUCTURES AND OBSTRUCTIONS - 02071
This section specifies work requiring the removal and disposal of all structures and obstructions within the project limits which have been SHOWN ON THE
DRAWINGS.
Existing structures and improvements which are to become an integral part of the planned improvements shall remain even though not specifically noted.
1.2 - Material Classification
Material to be excavated is unclassified.
1.3 - Related Work Specified Elsewhere
02224 - Excavation, Embankment and Backfill
None.
3.1 – Removal of Structures
Remove all obstructions…