Attachment 13 - Revised - Meadow Valley_SOI 09.11.24.xls

XLS spreadsheet 41 KB Posted

Attached to
Meadow Valley Access Road Improvements - Amended Federal contract opportunity
Solicitation number
127EAX24R0025
Issued by
Department of Agriculture Forest Service

About this file

This document is an Excel attachment titled "Attachment 13 - Revised - Meadow Valley_SOI 09.11.24.xls" that contains a Schedule of Items (SOI) for the Meadow Valley Realignment Project.

The SOI includes three separate road improvement projects: South Bypass, North Bypass, and Realignment. The work involves loading, hauling, and spreading 4-inch surface course aggregate, as well as road reconditioning, across approximately 4 miles of roads. The project also includes constructing 16 rolling dips. The estimated quantities and unit costs are provided for each pay item.

This SOI is associated with the federal contract opportunity titled "Meadow Valley Access Road Improvements - Amended" (Solicitation Number: 127EAX24R0025), which is being managed by the USDA Forest Service, Coronado National Forest, Sierra Vista Ranger District in Cochise, Arizona. The project aims to increase the drivability and durability of the existing road segments.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

MEADOW VALLEY REALIGNMENT PROJECT SCHEDULE OF ITEMS
PROJECT:South Bypass and Realignment
Method ofEstimatedPay UnitEstimatedTotal
Pay ItemDescriptionMeasureQuantityUnit Cost
151(01)MobilizationLSQ1LS
Method ofEstimatedPay UnitEstimatedTotal
Pay ItemDescriptionMeasureQuantityUnit Cost
301(01)Load, Haul and Spread 4" surface course aggregate, USFS supplied, Compaction method C Section 204.11AQ2.6Mile
303(01)Road ReconditioningAQ2.6Mile
Subtotal Roads
TOTAL WITH MOB
ADDITIVE ITEM 1:North Bypass
Method ofEstimatedPay UnitEstimatedTotal
Pay ItemDescriptionMeasureQuantityUnit Cost
151(04)MobilizationLSQ1LS
Method ofEstimatedPay UnitEstimatedTotal
Pay ItemDescriptionMeasureQuantityUnit Cost
301(01)Load, Haul and Spread 4" surface course aggregate, USFS supplied, Compaction method C Section 204.11AQ1.4Mile
303(01)Road ReconditioningAQ1.4Mile
Subtotal Roads
ADDITIVE 1 TOTAL WITH MOB
TOTAL WITH ADDITIVE OPTION 1 WITH MOB
ADDITIVE ITEM 2:Construct Rolling Dip
Method ofEstimatedPay UnitEstimatedTotal
Pay ItemDescriptionMeasureQuantityUnit Cost
151(05)MobilizationLSQ1LS
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
204(02)Construct Rolling Dip, Compaction method C Section 204.11AQ16EA
Subtotal Roads
ADDITIVE 2 TOTAL WITH MOB
TOTAL WITH ADDITIVE OPTION 1 AND 2 WITH MOB

File details come from the government source that posted it. Updated .