This document is an Amendment to a federal contract opportunity for the Meadow Valley Access Road Improvements project. The key details are:

The amendment modifies the Design Package and Haul Route for the project. It specifies the source of crushed aggregate surfacing material, requires the contractor to maintain all haul roads, and details the haul route to and from the project site. The amendment also deletes the additive option for culvert installations, adds a new additive option for North Bypass resurfacing, and extends the project completion time from 30 days to 60 days. The proposal due date is now October 18, 2024 at 4:00 p.m. local Arizona time. The amendment also provides responses to questions raised during a site visit.

The federal contract opportunity is for the Meadow Valley Access Road Improvements project, which involves improving three existing road segments near Meadow Valley, Arizona. The work is intended to increase the drivability and durability of these roads. The solicitation is being issued by the USDA Forest Service, Coronado National Forest, Sierra Vista Ranger District.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT 4

Amendment to Design Package and Haul Route

1) These amended general notes are listed on the revised design general notes spreadsheet highlighted in yellow and a map has been provided for the haul route:

• Specified source of crushed aggregate surfacing material is from a government supplied at Guadalajote Material Source Site (location map included in solicitation package).

• CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF ALL HAUL ROADS

USED BEFORE, DURING, AND AFTER OPERATIONS. NO SEPARATE PAYMENT

WILL BE MADE FOR THIS REQUIRED MAINTENANCE.

• ALL CONSTRUCTION VEHICLES SHALL BE CLEAN AND FREE OF WEEDS

AND OTHER HARMFUL MATERIALS.

• Compaction for the road surfacing and rolling dip aggregate will be Compaction Method C Section 204.11: (c) Placement Method 3. Adjust the moisture content of the material to a moisture content suitable for compaction. Fill the interstices around rock with earth or other fine material as practical. Operate hauling and spreading equipment uniformly over the full width of each layer until there is no visible evidence of further consolidation.

Make at least three complete passes.

• The Specified haul route to and from the project site will be as follows: Haul Route with full trucks: From the Guadalajote Flat material source site, head southwest toward South Harshaw Road (FSR 49) for approximately 870 FT turn right onto South Harshaw Road (FSR 49) and proceed for approximately 5.9 miles. Turn right onto North Harshaw Road (FSR 58), stay right after approximately 0.5 miles and proceed for approximately 2.2 miles. Stay left to continue on FSR 58 and proceed for approximately 2.1 miles to project site. Return Route with empty trucks: From project site proceed 1.0 mile on FSR 58 west to FSR 214 take a left on FSR 214 and proceed 4.55 miles to FSR 49 Harshaw Road, take a right and proceed North for 0.75 miles to the Guadalojote material site turn off, proceed right for 870 feet to the material site.

2) The additive option for the culvert installations has been deleted from the solicitation since the FS road crew will be installing these. In place a new additive option has been added for the North Bypass resurfacing.

3) Change the time to complete the project from 30 days to 60 days.

See Attachments 11 (Haul Route Map), 12 (Revised Design Spreadsheet), and 13 (Revised SOI to be completed and submitted with proposal).

New proposal due date is October 18, 2024 @ 4:00 p.m. local Arizona time.

• Q: Was the Forest Service able to bring the LOW BOY trailer on the haul route?

A: Yes

• Q: Is the surface course just 4 inches after compaction? A: Yes, after compaction

• Q: What is the best water source available? A: Patagonia or Sonoita

• Q: Will they be required to go off our grade or a different grade? A: Will go off our grade

• Q: Is the Forest Service Road Crew carving in dips A: The Road Crew will generally carve in the dips, but may need additional surface material to complete the dips to standard

• Q: When will the Forest Service complete the subbase? A: Estimating within two weeks

• Q: Where is the third section (North Bypass) start? A: Turn right at the fence and it is flagged off

• Q: Will the Forest Service have a GPS file of the final subgrade after compaction? A: No, probably won’t have that available

• Q: Will there be flags or survey stations marking things like “end here” or “start here”? A: Will stake to mark the three phases

• Q: Will there be turnarounds? A: Forest Service Road crew will make sure there are T-style turn arounds. [A: Yes, turnarounds for haul trucks will be provided at selected locations approved by the COR.]

Contractors Present at Site Visit on 9/10/24:

- Nowlin, Tbar N Equipment

- Jace Howard, AZtech Contracting (jace.aztech@gmail.com)

- Curtis Allen (928-792-7800)

Meadow Valley QA and Second Site Visit Sign In Sheet

QA from 09/10/24 1300 SITE VISIT

Location: This meeting started at the intersection of the FSR 58 and 765 roads and then proceeded down the South Bypass, Realignment and part of the North Bypass subbase segments being constructed by the Forest Service.