Amendment 0003 Rev SOI.pdf

PDF 444 KB Posted

Attached to
Renovate Marshall Gulch Picnic Area
Solicitation number
127EAX24R0009
Issued by

About this file

This document is Amendment 0003 to a Request for Proposals (RFP) for the Solicitation No. 127EAX24R0009 to Renovate the Marshall Gulch Picnic Area on the Coronado National Forest. The purpose of this amendment is to provide a revised Attachment 1, Schedule of Items dated 04-24-2024. The solicitation is a Total Small Business Set-Aside with a NAICS code of 237310 - Highway, Street, and Bridge Construction, and a size standard of $45M. The magnitude of proposed construction is between $1,000,000 and $5,000,000. The estimated proposal due date is April 25, 2024. Award will be made based on the best value to the government in accordance with FAR 15.3. The revised Schedule of Items includes line items for various construction activities such as mobilization, grading, paving, drainage, structures, and landscaping. No further information about the overall scope of work is provided in this amendment.

View the file

Other files

File Type Posted
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
Amendment 0005.pdf PDF
Amendment 0004.pdf PDF
Attachment 0010 - Drones uas.pdf PDF
Marshall Gulch PreBid Q and A.pdf PDF
Amendment 0002.pdf PDF
Attachment 0009 - Staging Area Map.pdf PDF
Clause Update.pdf PDF
Attachment 0008 - Proposed Road and Bridge Plans for Marshall Gulch.pdf PDF
Amendment 0001.pdf PDF
127EAX24R0009 Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0003 03/28/2024

USDA-FS CSA SOUTHWEST 7

333 BROADWAY BLVD SE

ALBUQUERQUE NM

87102-3498

127EAX24R0009

03/12/2024 X

The purpose of this amendment is to provide a REVISED Attachment 1, Schedule of Items Dated 04-24-2024. Discard original schedule in its entirety.

X 1

X

Michael E. Carico, Contracting Officer

SOLICITATION NO. 127EAX24R0009

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

15101 Mobilization LSQ LS 1 $ $ 15205 Bridge Staking, Precision Class A LSQ LS 1 $ $

15212 Slope, Reference, and Clearing and Grubbing Staking, Method 1, Tolerance A LSQ LS 1 $ $

15221 Grade Finishing Stakes, Subgrade, Base Course, and Pavement LSQ LS 1 $ $ 15713 Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan LSQ LS 1 $ $ 20101 Clearing and Grubbing LSQ LS 1 $ $ 20301 Removal of Individual Trees and Stumps LSQ LS 1 $ $

20302 Removal of Low Water Crossing and all retaining walls, Disposal Method A LSQ LS 2 $ $

20431 Roadway Excavation and Embankment LSQ LS 1 $ $ 20804 Structural Excavation LSQ LS 1 $ $ 20805 Foundation Fill LSQ LS 1 $ $ 20806 Structural Backfill LSQ LS 1 $ $ 20807 Stream Excavation AQ CY 250 $ $ 25101 Placed Riprap, Class 6 AQ CY 568 $ $ 25805 Reinforced Split Face Concrete Masonry Unit Retaining Walls AQ SF 3338 $ $ 27250 Geocell Abutment Stabilization, 6 inch depth AQ SY 96 $ $ 30103 Aggregate Base, Compaction Method D AQ TON 584 $ $ 40304 Asphalt Concrete, Arizona State DOT, Section 406, 3/4-Inch Mix AQ TON 418 $ $ 55201 Cast-in-Place Concrete Curbs, Grade Beams, and Wingwalls AQ CY 155 $ $ 55301 Precast, Prestressed Concrete Structural Members, Box Beams AQ EA 16 $ $ 55401 Reinforcing Steel AQ LS 1 $ $ 55601 Steel Bridge Rail AQ LF 222 $ $ 60201 24" Drainage Corrugated Metal Pipe AQ LF 36 $ $ 61301 Simulated Stone Masonry Treatment AQ SY 162 $ $ 61302 Simulated Stone Masonry Test Walls AQ EA 1 $ $ 62528 Seeding and Mulching, Dry Method LSQ LS 1 $ $ 63301 Sign System AQ EA 11 $ $ 63306 Posts, Wood AQ LF 80 $ $ 63307 Object Markers Type 3 AQ EA 8 $ $ 63406 Pavement Markings, Type H LSQ LS 1 $ $

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

10010 Relocate Existing CXT Vault Restroom (Sheets S-02 & D-03) LSQ LS 1 $ $ 15214 Survey and Staking, Establish Project Control Points LSQ LS 1 $ $ 20307 Removal of 1 Restroom w/ Stairs & 6 Picnic Areas (Sheets S-01 & D-01) LSQ LS 1 $ $ 20308 Removal of Stone Masonry Rubble, <10CY Total (Sheet S-01) LSQ LS 1 $ $ 20309 Relocate Boulders, 2'-4' Dia. (Sheets S-01 & D-01) AQ EA 2 $ $ 20310 Relocate Bulletin Board (Sheet S-01) AQ EA 1 $ $ 20311 Relocate Trash and Recycle Bins, 3 total (Sheet S-01) AQ EA 3 $ $ 25101 Placed Riprap, Class 4, Restroom fillslope (Sheet S-02) AQ CY 20 $ $ 60101 Concrete Staircase w/Handrail, Integral Color (Sheets S-01 & D-02) LSQ LS 1 $ $

61501A Sidewalk, Concrete, 4-inch (Sheets S-02 & D-04) AQ SY 25 $ $ 61501C Sidewalk, Aggregate, 4-inch (Sheets S-02 & D-04) AQ SY 25 $ $ 61801 Precast Concrete Picnic Tables (Sheets S-01 & D-01) AQ EA 3 $ $ 63306 Metal Post Pedestal Grills (Sheets S-01 & D-01) AQ EA 3 $ $ 62405 Place Conserved Topsoil, 8" Depth (Sheets S-01 & D-01) LSQ LS 1 $ $ 62510 Seeding, Dry Method (Sheets S-01 & D-01) LSQ LS 1 $ $ 62516 Mulching, Hydraulic Method (Sheets S-01 & D-01) LSQ LS 1 $ $ 63601 System Installation, VenTek Model M600XC (Sheets S-01 & D-05) LSQ LS 1 $ $

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

15101 Mobilization LSQ LS 1 $ $ 15214 Survey and Staking LSQ LS 1 $ $ 20307 Removal of Picnic Areas (Sheets S-02 & D-01) AQ EA 2 $ $ 20309 Relocate Boulders, 2'-4' Dia. (Sheets S-02 & D-01) AQ EA 4 $ $ 20311 Relocate Trash and Recycle Bins, 3 total (Sheet S-02) AQ EA 3 $ $

61501B Sidewalk, Decomposed Granite (Sheets S-02 & D-01) AQ SY 180 $ $ 61801 Precast Concrete Picnic Table (Sheets S-02 & D-01) AQ EA 4 $ $ 63306 Metal Post Pedestal Grills (Sheets S-02 & D-01) AQ EA 4 $ $ 62405 Place Conserved Topsoil, 8" Depth (Sheets S-02 & D-01) LSQ LS 1 $ $ 62510 Seeding, Dry Method (Sheets S-02 & D-01) LSQ LS 1 $ $ 62516 Mulching, Hydraulic Method (Sheets S-02 & D-01) LSQ LS 1 $ $

(REVISED - 04-24-2024)

Renovate Marshall Gulch Picnic Area and Trailhead

BASE ITEMS TOTAL without Mobilization

BASE TOTAL

BASE ITEMS (Proposed Road and Bridge Plans)

BASE ITEMS (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Bid Items 1 - Picnic Areas South (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Items 1 Total without Mobilization Additive Items 1 Total

Base + Additive 1 Bid items Total

SCHEDULE OF ITEMS

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

15101 Mobilization LSQ LS 1 $ $ 15214 Survey and Staking LSQ LS 1 $ $

61501A Sidewalk, Concrete, 4-inch (Sheets S-01 & D-04) AQ SY 25 $ $ 61501C Sidewalk, Aggregate, 4-inch (Sheets S-01 & D-04) AQ SY 25 $ $ 64603 Fixture, Vault Toilet, includes labor and materials (Sheets S-01 & D-03) LSQ LS 1 $ $

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

15101 Mobilization LSQ LS 1 $ $ 15221 Grade Finishing Stakes, Subgrade, Base Course, and Pavement LSQ LS 1 $ $ 20401 Roadway Excavation (Sheets S-01 & D-06) LSQ LS 1 $ $ 30103 Aggregate Base, Compaction Method D (Sheet D-06) AQ TON 70 $ $ 40304 Asphalt Concrete, ADOT, Section 406, 3/4-Inch Mix (Sheet D-06) AQ TON 70 $ $ 62625 Bollard, Metal, Removable (Sheets S-01, D-06 & D-07) AQ EA 2 $ $

Pay Item Description Method of Unit Quantity Unit Cost Total 15101 Mobilization LSQ LS 1 $ $ 15214 Survey and Staking LSQ LS 1 $ $ 15713 Soil Erosion, Pollution Control, Stream Diversion, & Dewatering Plan LSQ LS 1 $ $ 20301 Removal of Pipe Culvert (Sheet S-02) AQ EA 2 $ $ 20309 Relocate Boulders, 2'-4' Dia. (Sheet D-08) AQ EA 20 $ $ 20402 Subexcavation (Sheet S-02) LSQ LS 1 $ $ 60103 Concrete Headwall (Sheet D-11) AQ EA 2 $ $ 60221 Reinforced Concrete Box Culvert (Sheet D-11) AQ EA 1 $ $ 62405 Place Conserved Topsoil, 8" Depth (Sheet D-08) LSQ LS 1 $ $ 62510 Seeding, Dry Method (Sheet D-08) LSQ LS 1 $ $ 62516 Mulching, Hydraulic Method (Sheet D-8) LSQ LS 1 $ $ 62901 Rolled Biodegradable Erosion Control Product (Sheet D-08) LSQ LS 1 $ $

Pay Item Description Method of

Measurement Unit Quantity Unit Cost Total

15101 Mobilization LSQ LS 1 $ $ 15214 Survey and Staking LSQ LS 1 $ $ 15713 Soil Erosion, Pollution Control, and Stream Diversion Plan LSQ LS 1 $ $ 20305 Removal of Stone Masonry (Sheets S-02 & D-09) LSQ LS 1 $ $ 20309 Relocate Boulders, 2'-4' Dia. (Sheet D-10) AQ EA 15 $ $ 20402 Subexcavation (Sheet S-02) LSQ LS 1 $ $ 27001 Grout (Sheet D-09) LSQ LS 1 $ $ 62405 Place Conserved Topsoil, 8" Depth (Sheet D-10) AQ CY 25 $ $ 62510 Seeding, Dry Method (Sheet D-10) LSQ LS 1 $ $ 62516 Mulching, Hydraulic Method (Sheet D-10) LSQ LS 1 $ $ 62631 Planting, propagate willows, in addition to seeding (Sheets D-08 & D-10) LSQ LS 1 $ $ 62901 Rolled Biodegradable Erosion Control Product (Sheet D-10) LSQ LS 1 $ $

Additive Items 5 Total without Mobilization Additive Items 5 Total

Base + Additive 1-5 Items Total

Additive Items 5 - Sabino Creek Demo Retaining Wall and Recontouring Parking Lot (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Item 3 Total without Mobilization Additive Items 3 Total

Base + Additive 1-3 items Total

Additive Items 4 Total

Base + Additive 1-4 items Total

Additive Items 4 without Mobilization

Additive Items 4 - Marshall Creek Reconstruction (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Items 2 Total

Additive Items 2 - Additional Vault Restroom (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Items 3 - Ramp To Old Road (Renovate Marshall Gulch Picnic Area & Trailhead Plans)

Additive Items 2 Total without Mobilization

Base + Additive 1-2 Items Total

Amendment 0003
Amendment 0003
REVISED Attachment 0001 Schedule of Items
Full Project