Amendment 0002.pdf

PDF 2 MB Posted

Attached to
127EAX24Q0026 - Tonto Basin RD, 06 Apartments Water Heaters Replacement
Solicitation number
127EAX24Q0026
Issued by

About this file

This document is an amendment to a federal solicitation for the 127EAX24Q0026 - Tonto Basin RD, 06 Apartments Water Heaters Replacement project. The project requires the removal of four 120-gallon dual electric and solar water heater tanks and the installation of three 120-gallon electric water heater tanks at the 06 Apartments in the Tonto Basin Ranger District, Tonto National Forest, Arizona. The work also includes removal of the solar water heater recirculation piping and any necessary piping reconfiguration. The project is a 100% Small Business Set-Aside with a magnitude less than $25,000. Offers are due by June 11, 2024 at 1:00 pm MT. The contract will be awarded as a Firm Fixed-Price using Best Value-Technically Acceptable source selection. The contacts for the project are Nicolas Estrada and Michelle Bahr. Davis-Bacon wages apply, but payment and performance bonds are not required.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

127EAX24Q0026

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ALBUQUERQUE NM 87102

333 BROADWAY SE

SOUTHWESTERN REGION

05/07/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/07/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide Exhibit One

Exhibit I - Statement of Work / Specifications is hereby added as part of this solicitation package

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MICHAEL E. CARICO

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

06 Apartments Water Heater Replacement Project Tonto Basin Ranger District

Tonto National Forest Service

PROJECT SCOPE:

The Contractor shall provide all labor, materials, equipment, and tools, including incidentals, necessary for the removal of four 120-gallon dual electric and solar water heater tanks and installing three 120-gallon electric water heater tanks. Work shall also include removal of the solar water heater recirculation piping up to the ceiling joists and any piping reconfiguration to fit the new water heater tanks.

PROJECT LOCATION:

The project is located within the laundry building at the 06 Apartments in the Tonto Basin Work Center Administrative Site, Tonto Basin Ranger District, Tonto National Forest, Arizona. The laundry building is approximately 2.8 miles east of the Roosevelt Lake Bridge, on the north side of Arizona Highway 188.

The approximate address is 27189 AZ-188, Roosevelt, Arizona 85545. The building is behind a locked gate, the Contractor is required to coordinate with the COR for access.

SUMMARY OF WORK:

WORK ITEM: MOBILIZATION, INCLUDING BONDING COST

Mobilization, Including Bonding Costs shall include payment for personnel, equipment, material, and incidentals to mobilize to and from the project site for the completion of this project.

WORK ITEM: REMOVE EXISTING WATER HEATERS

Remove Existing Water Heaters includes all work necessary to remove and dispose of the four, existing, 120-gallon water heaters. Work shall include disconnection and removal of the water tanks, removal of the solar water heater recirculating pump, removal and capping of the solar water recirculation piping up to the ceiling joist, and disconnection of the electrical wires. All piping, tanks, drains, valves, and other materials removed from the site shall be disposed of off National Forest Lands.

WORK ITEM: INSTALL WATER HEATER TANKS

Install Water Heater Tanks includes all work necessary to install three, new, electric, 120-gallon water heaters. Work shall include installation of the tanks inside the water heater room in the laundry building, reconnecting the electric wiring and upgrading the wiring or electrical connection if necessary, reconnecting the hot and cold water piping with flexible, stainless steel water heater line and corresponding hot and cold water shut off valves for each tank, and routing each tank’s drain to the existing drain hole in the floor of the water heater room.

PROJECT SUBMITTALS:

AMENDMENT 0002

EXHIBIT I

Contractor shall submit for approval product literature and appropriate catalog cuts for the following valves and appurtenances:

• Project Schedule

• 120-Gallon Electric Water Heater Tank

• Pipe Cap

• Water Shut Off Valves

• Flex Piping

MEASUREMENT AND PAYMENT

MEASUREMENT

Method of measurement for each work item is shown on the SCHEDULE OF ITEMS.

PAYMENT

The accepted quantity, measured as provided above, will be paid at the contract price per unit of measurement for the pay item listed below that is designated in the SCHEDULE OF ITEMS.

CONTRACT TIME

Contract time shall be 14 days after the Notice-to-Proceed. Water shall not be shut-off for more than 8 hours without COR approval.

CONTACTS

The Contractor shall contact the following government contacts for coordination, site-visits, and field work, prior to commencing the project.

1. Contracting Officer’s Representative (COR):

Nico Estrada-Stephen, P.E.

Tonto Facilities Engineer Email: nicolas.estradastephen@usda.gov, Cell phone: 602-851-7776

2. Technical Representative:

Ben Reel Tonto Facilities Maintenance Email: benjamin.reel@usda.gov, Cell phone: 360-838-3692

ATTACHMENTS

Water Heater Existing Conditions mailto:nicolas.estradastephen@usda.gov mailto:benjamin.reel@usda.gov

01000-1

DIVISION 1 - GENERAL

PROJECT COORDINATION - 01000

PART 1 - GENERAL

1.1 - Description

This work shall consist of coordination with the Contracting Officer, Contracting

Officer Representative, and Forest Service District Staff.

1.2 - Related Sections

Tonto Fire Plan

PART 2 - PRODUCTS

None.

PART 3 - EXECUTION

3.1 - Public Utilities

Work under this contract includes installation of underground utilities. Utility locates are required before digging.

3.2 - Temporary Light and Power

The Contractor shall either provide his own power source at each site or make his own arrangements for power from utilities.

Provide temporary adequate light and power suppply for construction, makeing all necessary arrangements with serving utility. Provide new service; pay all costs.

Provide branch wiring and distribution boxes located to allow service and lighting by means of construction-type power cords.

Temporary lighting illumination level shall be adequate to permit workmen to properly perform their work. Permanent lighting may be used during construction so long as it is adequate for the work being performed. Maintain lighting and make routine repairs.

Provide properly wired outlets in sufficient quantity to minimize the use of extension cords. Wired outlets shall be of proper electrical characteristics and capacity for construction equipment in use.

3.3 - Temporary Water

NicolasEstradaStephe Typewritten Text

SPECIFICATIONS: 06 APARTMENTS WATER HEATER REPLACEMENT

01000-2

None.

3.4 - Temporary Sanitation Facilities

Provide adequate number of sanitary toilet facilities, located throughout the construction, where approved by the Contracting Officer, and enforce their use by all personnel. Fully enclosed and weatherproof toilets, maintain and service on a periodic basis, in a sanitary condition at all times.

Supply adequate cool, pure drinking water with individual drinking cups or sanitary bubbler fountain. The quality of the drinking water shall meet the standards for public water supplies of the county health department.

3.5 - Other Contracts and Contractors

None.

3.6 - Other Work Phases

None.

3.7 - General Public

3.8 – Temporary On-Site Accommodations

The Ranger District may be able to provide temporary camping accommodations for the Contractor on-site to cut down on travel and overhead costs. The Contractor shall coordinate these accommodations with the Tonto Basin District Ranger. Upon completion of the project, on-site camping accommodations will no longer be valid.

4.0 - MEASUREMENT AND PAYMENT

4.1 - Measurement

Work under this section shall not be measured for payment, but is included in all other items in the contract.

4.2 - Payment

Separate payment will not be made.

END OF SPECIFICATION 01000

01101 - 1

DIVISION 1 GENERAL

ABBREVIATIONS - 01101

Organizations & Standards

Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows.

Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.

AASHTO--American Association of State Highway and Transportation Officials

ACI--American Concrete Institute

AISC--American Institute of Steel Construction

AISI--American Iron and Steel Institute

AITC--American Institute of Timber Construction

ANSI--American National Standards Institute

APA--American Plywood Association

API--American Petroleum Institute

ASME--American Society of Mechanical Engineers

ASTM--American Society for Testing and Material

ATCC--American Type Culture Collection

AWPA--American Wood Preservers Association

AWPB--American Wood Preservers Bureau

AWS--American Welding Society

AWWA--American Water Works Association

CFR--Code of Federal Regulations

CRSI--Concrete Reinforcing Steel Institute

CS--Commercial Standard issued by U.S. Department of Commerce

DEMA--Diesel Engine Manufacturers Association

01101 - 2

FAR--Federal Acquisition Regulation

FED SPEC. or FS-- Federal Specifications

FSS--Federal Specifications and Standards

GSA--General Services Administration

MIL--Military Specifications

MSHA--Mine Safety and Health Administration

MUTCD--Manual on Uniform Traffic Control Devices

NBFU--National Board of Fire Underwriters

NBS--National Bureau of Standards

NEMA--National Electrical Manufacturers Association

NESC--National Electrical Safety Code

NFPA--(Fire)--National Fire Protection Association

NFPA--(Forest)--National Forest Products Association

NWMA--National Woodwork Manufacturers Association

OSHA--Occupational Safety and Health Administration

PCA--Portland Cement Association

PCI--Prestressed Concrete Institute

PS--Product Standard issued by the U.S. Department of Commerce

PTI--Post-Tensioning Institute

RIS-Redwood Inspection Service

SAE--Society of Automotive Engineers

SF--Standard Form

SSPC--Steel Structures Painting Council

UL--Underwriter's Laboratories, Inc.

USASI--United States of America Standards Institute

01101 - 3

WCLIB--West Coast Lumber Inspection Bureau

WWPA--Western Wood Products Association

01101 - 4

Pay Items & Pay Units

ABBREVIATIONS

Aluminum . . . . . . . . . . . . . . . . . . . . AL.

Asphalt . . . . . . . . . . . . . . . . . . . . ASP.

Barbed Wire . . . . . . . . . . . . . . . . . . B.W.

Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S.

PIPE

Bituminous Surface Treatment BST Cement . . . . . . . . . . . . . . . . . . . . . CEMT.

Cement Treated . . . . . . . . . . . . . . . . . CEMT.-T.

Cement Treated Base . . . . . . . . . . . . . . CTB Clearing & Grubbing . . . . . . . . . . . . . . CLEAR & GRUB Compaction . . . . . . . . . . . . . . . . . . . CMPCT.

Concrete . . . . . . . . . . . . . . . . . . . . CONC.

Corrugated Metal Pipe . . . . . . . . . . . . . CMP Corrugated Steel Pipe . . . . . . . . . . . . . C.S.P.

Corrugated Steel Pipe Arch . . . . . . . . . . . C.S.P. ARCH Cubic Yard . . . . . . . . . . . . . . . . . . . C.Y.

Cubic Yard Mile . . . . . . . . . . . . . . . . C.Y.MI.

Diameter . . . . . . . . . . . . . . . . . . . . DIA.

Each . . . . . . . . . . . . . . . . . . . . . . EA.

Emulsified . . . . . . . . . . . . . . . . . . . EMLSFD.

Erosion and Pollution Control . . . . . . . . . E&P CONTROL Fabricated . . . . . . . . . . . . . . . . . . . FABR.

Finish Floor Elevation . . . . . . . . . . . . . F.F.E.

Foundation . . . . . . . . . . . . . . . . . . . FOUND.

Furnished . . . . . . . . . . . . . . . . . . . FURN.

Gallon . . . . . . . . . . . . . . . . . . . . . GAL.

Grade . . . . . . . . . . . . . . . . . . . . . GR.

Height . . . . . . . . . . . . . . . . . . . . . HT.

High Strength . . . . . . . . . . . . . . . . . H. STRENGTH Horizontal . . . . . . . . . . . . . . . . . . . HOR.

Hour . . . . . . . . . . . . . . . . . . . . . . HR.

Linear Foot . . . . . . . . . . . . . . . . . . L.F.

Liquid . . . . . . . . . . . . . . . . . . . . . LIQ.

Loading . . . . . . . . . . . . . . . . . . . . LD.

Lump Sum . . . . . . . . . . . . . . . . . . . . L.S.

Material . . . . . . . . . . . . . . . . . . . . MAT'L Maximum . . . . . . . . . . . . . . . . . . . . MAX.

Method . . . . . . . . . . . . . . . . . . . . . M.

Mile . . . . . . . . . . . . . . . . . . . . . . MI.

Minimum . . . . . . . . . . . . . . . . . . . . MIN.

One Thousand Feet Board Measure . . . . . . . . MFBM One Thousand Gallons . . . . . . . . . . . . . . M.GALS.

One Thousand Gallons Mile . . . . . . . . . . . M.GALS.MI.

One Thousand Square Feet . . . . . . . . . . . . M.S.F.

Polyvinylchloride . . . . . . . . . . . . . . . PVC

01101 - 5

Pounds . . . . . . . . . . . . . . . . . . . . . LBS.

Reflectorized . . . . . . . . . . . . . . . . . REFLECT.

Section . . . . . . . . . . . . . . . . . . . . SEC.

Square Foot . . . . . . . . . . . . . . . . . . S.F.

Square Yard . . . . . . . . . . . . . . . . . . S.Y.

Station . . . . . . . . . . . . . . . . . . . . STA.

Station Yard . . . . . . . . . . . . . . . . . . STA. YD.

Strand . . . . . . . . . . . . . . . . . . . . . S.

Structural . . . . . . . . . . . . . . . . . . . STRUCT.

Structural Steel . . . . . . . . . . . . . . . . S. STEEL Stump . . . . . . . . . . . . . . . . . . . . . STMP Target Value . . . . . . . . . . . . . . . . . . TV Thickness . . . . . . . . . . . . . . . . . . . TH.

Ton Mile . . . . . . . . . . . . . . . . . . . . T.M.

Tops and Limbs . . . . . . . . . . . . . . . . . T&L Utilization of Timber . . . . . . . . . . . . . UOT Vertical . . . . . . . . . . . . . . . . . . . . VERT.

Welded Wire Fabric . . . . . . . . . . . . . . . W.W.F.

White . . . . . . . . . . . . . . . . . . . . . WH.

Width . . . . . . . . . . . . . . . . . . . . . W.

With . . . . . . . . . . . . . . . . . . . . . . W/ Without . . . . . . . . . . . . . . . . . . . . W/O Woven wire . . . . . . . . . . . . . . . . . . . W.W.

Yellow . . . . . . . . . . . . . . . . . . . . . YE.

END OF SPECIFICATION 01101

01102 - 1

DIVISION 1 GENERAL

DEFINITIONS - 01102

Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:

Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.

Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.

Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.

Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.

Berm. Curb or dike constructed to control runoff water or traffic flow.

Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.

Clearing Limits. The limits of clearing as designated on the ground or on the drawings.

Conduit. A natural or artificial channel for carrying fluids, as water pipes, canals, and aqueducts.

Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.

Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.

Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.

Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.

01102 - 2

Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.

Defect. A failure to meet a requirement with respect to a single quality characteristic.

Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.

Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.

Engineer. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.

Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.

Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.

Forest Service. The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.

Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.

Inspector. The Government-authorized representative designated in writing by the CO or

COR responsible for detailed inspection.

Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.

Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.

Materials. Any substance specified for use in the construction of the project and its appurtenances.

Maximum Density. The highest density that can be obtained under stated conditions.

01102 - 3

Measurement. Determining and expressing the quantities of work or materials.

Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.

Neat Line. A line defining the proposed or specified limits of an excavation or structure.

Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.

Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.

Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.

Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.

Pipe. A culvert that is circular (round) in cross-section.

Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width

(or span) is larger than the vertical dimension (or rise).

Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.

Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.

Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.

Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.

Second Samples. A sample taken when the initial sample indicates that the material is defective.

Sidewalk. The portion of the roadway constructed primarily for pedestrian use.

01102 - 4

Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.

Standard Specifications. Specifications approved for general application and repetitive use.

Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.

Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.

Tackifier. Binder for vegetative mulch.

Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.

Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.

Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.

END OF SPECIFICATION 01102

01103-1

MEASUREMENT AND PAYMENT - 01103

1.1 – Requirements

Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the

SCHEDULE OF ITEMS.

1.2 – Payment

One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item.

(a) Designed Quantities (DQ): These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units of the originally contemplated work will not be made unless authorized under one or more of the following conditions:

(1) As a result of changes authorized by the Contracting Officer in the originally contemplated work. Minor changes to adjust balance points, etc., will not be considered changes in quantities.

(2) As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities, that cause a pay item to change by 15 percent.

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

(b) Actual Quantities (AQ): These quantities are determined from measurements of completed work.

Final payment will be made for the actual quantities at the unit price shown in the SCHEDULE OF ITEMS, subject to the Variation in Quantities Provision.

01103-2

(c) Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

1.3 - Units of Measurement:

Payment will be by units defined and determined according to U.S. Standard measure.

END OF SPECIFICATION 01103

01300 - 1

SUBMITTALS - 01300

1.1 - Requirements

It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. Contractor shall allow ten days for processing of submittals by the

Government.

Submittals may also be referred to as shop drawings.

1.2 - Manufacturer's Literature and Shop Drawings

Submit three copies to the COR for approval on the items required herein.

Submittal specifications are to be submitted in the following format:

A. The specifications and salient qualities of the item specified in the contract.

B. The specifications and salient qualities of the submittal item.

C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.

D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.

E. Shop drawings of submitted item(s) including wiring or layout diagrams.

If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.

If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.

Submittals will be waived if contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.

Submittals are required per the following sections:

1. 02304 Aggregate Base

01300 - 2

Certificates of Compliance

2. 02441 Underground Irrigation System

Underground Irrigation Design

Operation and Maintenance Manual

3. 02610 Pipe, Fittings and Specialties

Product Data

4. 02641 Valves

5. 02642 Valve Enclosures

6. 02645 Frost-Proof Hydrants

7. 02743 Septic Tanks

8. 02914 Courtesy Dock

Fabrication Drawings

Calculations

Professional Engineer's Certification

Installation Instructions

9. 03301 Cast-in-Place Concrete

Mix Design

Admixtures

Delivery Tickets

10. 04220 Reinforced Concrete Unit Masonry

Samples

Certificate of Compliance

11. 05120 Metal Ramada

Shop Drawings

12. 05500 Metal Fabrications

13. 06410 Architectural Casework

14. 07193 Plastic Vapor Barrier

01300 - 3

15. 07410 Preformed Metal Roofing

Product Data

Installation Manual

16. 07820 Skylights

17. 08110 Hollow Metal Doors and Frames

Product Data

18. 08113 Wood Doors

19. 08115 Metal Basement Doors

20. 08520 Aluminum Windows

21. 08710 Finish Hardware

22. 08800 Glass and Glazing

Compatibility and Adhesion Test Report

23. 09720 Composition Flooring

Samples

Installers List

Cleaning and Maintenance Instructions

24. 09900 Painting

25. 10160 Plastic Toilet Partitions

26. 10800 Building Accessories

Alternate Products

27. 15400 Building Plumbing

01300 - 4

28. 15540 Solar Water Heating System

Operation and Maintenance Manuals

29. 15560 Water Storage Tank

30. 16500 Lighting

31. 16501 Flood Light

Product Data

Candlepower Distribution

Certification of Type of Plastic Material

END OF SPECIFICATION 01300

01300A–1

ADMINISTRATIVE REQUIREMENTS

SECTION 01300A

PART 1 GENERAL

1.1 – SECTION INCLUDES

A. Coordination.

B. Preconstruction conference.

C. Progress Meetings.

D. Preinstallation conferences.

1.2 – COORDINATION

A. Coordinate scheduling, submittals and Work of the various Section of specifications to assure efficient and orderly sequence of installing of interdependent construction elements, with provisions for accommodating items installed later.

B. In the event of discrepancy, immediately notify the Contracting Officer or COR. Do not proceed with installation in areas of discrepancy until all such discrepancies have been fully resolved.

C. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, operating equipment.

D. Coordinate space requirements and installation of mechanical and electrical work that are indicated diagrammatically on Drawings. Follow routing shown for pipes, ducts and conduit, as closely as practicable; place runs parallel with line of building.

Utilize spaces efficiently to maximize accessibility for other installations, for maintenance and for repairs.

E. In finished areas except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish elements.

F. Coordinate completion and clean up of work as required in preparation for Substantial

Completion.

01300A–2

G. After occupancy of premises, coordinate access to site for correction of defective

Work and Work not in accordance with Contract Documents, to minimize disruption of the Government’s activities.

1.3 – PRODUCT DELIVERY REQUIREMENTS

A. The Contracting Officer will contact the Contractor within five working days after receipt of a fully executed contract to schedule a pre-construction conference (job-start meeting) to review procedures, work sequences, and tentative scheduling.

Contractor shall commence work only after receiving a “NOTICE TO PROCEED” which will include a date and time to begin work. Contractor shall not proceed with any work on the project site without a job-start meeting and a copy of the “Notice to

Proceed” letter.

B. Attendance Required: Contracting Officer, Contracting Officer’s Representative, Civil Design Engineer, Architect, Contractor and major subcontractors.

C. Agenda:

1. Distribution of Contract Documents.

2. Submission of list of products, Schedule of Values, and progress schedule.

3. Designation of personnel representing the parties in Contract.

4. Procedures and processing of field decision, submittals, substitutions, applications for payments, proposal request, Change Orders and Contract closeout procedures.

5. Scheduling

6. Scheduling activities of geotechnical Engineer and testing lab services.

7. Use of premises by Government and Contractor.

8. Government’s requirements.

9. Survey and building layout.

10. Security and housekeeping procedures.

11. Procedures for maintaining record documents.

12. Requirements for start-up of equipment.

13. Inspection and acceptance of equipment put into service during construction period.

14. Hazardous substance information.

1.4 – PROGRESS MEETINGS

A. Contracting Officer or COR will schedule and administer meetings throughout progress of the work.

B. Contracting Officer or COR will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings, and record minutes and distribute copies to participants.

01300A–3

C. Attendance Required: As appropriate to agenda topics for each meeting, the attendance of the following shall be required: Contracting Officer or COR, Job superintendent, major Subcontractors and suppliers.

D. Proposed Agenda:

1. Review minutes of previous meetings.

2. Review of Work progress.

3. Field observations, problems and decisions.

4. Identification of problems that impede planned progress.

5. Review of submittals schedule and status of submittals.

6. Review of off-site fabrication and delivery schedules.

7. Maintenance of progress schedule.

8. Corrective measures to regain projected schedules.

9. Planned progress during succeeding work period.

10. Coordination of projected progress.

11. Maintenance of quality and work standards.

12. Effect of proposed changes on progress schedule and coordination.

13. Other business relating to work.

1.5 – PREINSTALLATION CONFERENCES

A. When required in individual specification Section, convene a preinstallation conference at work site prior to commencing work of the Section.

B. Require attendance of parties directly affecting, or affected by, work of the specific

Section.

C. The Contracting Officer or COR will coordinate the meeting date.

D. The Contracting Officer or COR will prepare agenda, preside at conference, record minutes and distribute copies after conference to participants.

E. Review conditions of installation, preparation and installation procedures and coordination with related work.

1.6 – UTILITIES

A. Send proper notices, make necessary arrangements, perform other services required in construction, care and maintenance of all utilities and assume all responsibility concerning it. Provide necessary protection to existing utility services as directed and repair any work damaged as a result of operations of the contract.

01300A–4

1.7 – PROJECT COORDINATION

A. Should the Contractor encounter situations where, because of the non-related sizes of various materials and locations of existing utilities and conditions, etc., it is not possible to accomplish the work as shown, the Contractor shall meet the Contracting

Officer at the site to determine the most satisfactory arrangement. The Contractor shall establish lines and grades for all trades.

1.8 – INTEGRATING EXISTING WORK

A. All existing adjoining improvement shall be protected from damage of any type resulting from the operations, equipment or workmen of the Contractor during the course of construction.

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

END OF SECTION

01410 - 1

QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410

This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.2 - Related Work Specified Elsewhere

General Provisions FAR 52.236-5, Material and Workmanship

General Provisions FAR 52.236-6, Superintendence by the Contractor

General Provisions FAR 52.246-12, Inspection of Construction

1.3 - Submittals

Submittals under this section shall be furnished to the COR. Submittals include, but are not limited to the following:

Contractor's Representative

Quality Control Plan

As Built Drawings

Certificates of Compliance

Quantity Measurements

Test Results

Bill of Ladings

NONE

3.1 - Contractor's Representative

Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.

3.2 - Quality Control Plan

01410 - 2

The Quality Control Plan shall consist of the following:

(1) Authorities and responsibilities of inspection and testing personnel.

(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.

The contractor's proposed quality control plan for all items requiring quality control shall be submitted to the COR for review prior to the contractor commencing work. Within 10 days of receipt of the plan, the COR shall notify the contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to contractor's receipt of written approval of the proposed plan. The contractor shall submit to the COR, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the COR.

All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.

3.3 - Sampling, Testing, Inspection, and Measurement of Quantities

The contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.

The contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:

PROJECT NAME:_____________________CONTRACT No.____________

Pay Item No. TestDate Location Standard Results Test By(Initials)

The contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the

American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be preformed.

The contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies.

01410 - 3

The contractor is responsible for repair and protection of inspected work, whether inspection is performed by the contractor or by the Government.

The contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.

3.4 - As Built Drawings

The contractor shall maintain a set of the contract drawings depicting as-built conditions.

These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings.

Upon completion of the contract work, as built drawings shall be submitted to the COR.

3.5 - Certificates and Measurements

Certification:

The contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications.

Incidental purchases needed to remedy minor shortages of material shall be certified by the contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.

Measurements:

The contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ). The contractor shall compute the quantities for periodic progress payments; the COR will compute the quantities for the final payment based on measurements taken by the contractor. All contractor measurements are subject to verification. The contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

The following format or one containing the following information will be acceptable to the Government:

PROJECT NAME:_____________________CONTRACT No.____________

Quantity or

Pay Item No. Date Measurement Test By(Initials)

3.6 - Aggregate Materials

When the material sources are not designated as Government provided or the contractor elects not to use designated sources, the contractor shall be responsible for furnishing

01410 - 4 materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.

PART 4 - MEASUREMENT AND PAYMENT

4.1 - Measurement

There will be no separate measurement for this section.

4.2 - Payment

This work is incidental to other items in the contract and direct separate item payment will not be made.

END OF SPECIFICATION 01410

01420-1

SAFETY

SECTION 01420

1.1 – SCOPE

This Section describes in detail the Contractor’s responsibilities with respect to safety.

The Contractor shall comply with all applicable Federal laws and with such additional measures as the Contracting Officer may find necessary in accordance with FAR 52.236-

13, ACCIDENT PREVENTION.

3.1 – Safety Program

A. The Contractor shall submit a safety program to the Contracting Officer at the pre-construction conference. The safety program shall include, as a minimum, the following:

a. A requirement that each employee is involved in a weekly crew meeting where safety is a major topic of discussion.

b. A requirement that a Hazard analysis is performed for each portion of the work.

The hazard analysis shall include dividing the job down into basic steps, identifying potential hazards for each of the steps, and, for each of the potential hazards, identifying what steps employees and management must take to prevent an accident from occurring. Every hazard analysis shall be discussed with every employee involved in that particular portion of the work. Hazard analyses shall be documented in writing and posted on a safety bulletin board at the job site.

c. Submittal to the Contracting Officer of copies of the Contractor’s policies and procedures related to safety that is provided to new employees. Also provide a description of employee and supervisor safety responsibilities and authorities from the working level through each supervisory level of the contractor’s organization.

d. Provide details on how sanitation requirements will be met for this project.

e. Provide a plan for dealing with injuries, should they occur. This plan should include, as a minimum, the following:

(1) Identification of person’s responsible for providing first aid.

(2) Identification of persons responsible for summoning ambulance, fire, and/or police, as appropriate.

01420-2

(3) Prior arrangements with doctors, hospitals, and emergency care centers, and the like.

(4) Identification of person responsible for investigation accidents and providing recommendations for future accident prevention.

f. Provide a plan for emergency firefighting prior to arrival of fire department personnel. The plan should include the following, as a minimum:

(1) Identification of person’s responsible to notify the fire department.

(2) Identification of persons responsible to direct immediate firefighting efforts.

(3) List and location of all firefighting equipment.

(4) List and location of all hazardous materials.

B. Accident Reports

The contractor shall immediately report all accidents to the Contracting Officer by telephone or to the Contracting Officer’s Representative on site. The Contractor shall follow-up with a written accident report to the Contracting Officer within 24 hours identifying the name of the injured employee(s), date and time the accident occurred, job the employee was performing when the accident occurred, description of the accident, and corrective action taken. The immediate supervisor of the employee or a higher-level supervisor shall sign the accident report.

C. Daily Safety Cleanup

The Contractor’s accident prevention program shall identify the individuals responsible for daily cleanup and shall establish a regular cleanup procedure and schedule. The purpose of the daily safety cleanup is to insure that the work environment is as hazard free as reasonably possibly during construction operations.

If the Contracting Officer determines that cleanup is not being performed satisfactorily, the contractor shall take immediate action to provide a work environment that is appropriately clean to provide for worker safety.

01601 - 1

MOBILIZATION - 01601

This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

PART 4 MEASUREMENT AND PAYMENT

Progress payments will be made as follows:

The Contractor can request payment for performance and payment bonds. The amount of the premium, including coinsurance and reinsurance agreements, will be paid upon reciept of evidence of full payment to the surety. When separate payment for bonding cost is made, the bonding cost will be subtracted from the total contract amount for this pay item and the balance paid in accordance with the progress payment schedule outlined below.

(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

Any bonding costs in excess of the total contract amount of this pay item will be paid under one or more other pay items under this contract as determined by the Contracting

Officer. In no circumstance will the total amount of this contract be increased as a result of bonding costs exceeding the total contract amount of this pay item.

The total of all payments shall not exceed the original contract amount for this item.

01601 - 2

Payment will be made under:

PAY ITEM DESCRIPTION PAY UNIT

01601(01) Mobilization (Including Bonding Cost) . . . . . . . L.S.

END OF SPECIFICATION 01601

SECTION 01700

CONTRACT CLOSEOUT

PART 1 – GENERAL

1.1 - RELATED SECTIONS

A. Drawings and general provisions of the Contract, including General and

Supplementary Conditions and other Division 1 Specification Sections, apply to this

Section.

1.2 - SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. Inspection procedures.

2. Project record document submittal.

3. Operation and maintenance manual submittal.

4. Submittal of warranties.

5. Final cleaning.

B. Closeout requirements for specific construction activities are included in the appropriate Sections in Divisions 2 through 16.

1.3 - SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for certification of Substantial

Completion, complete the following. List exceptions in the request.

1. Advise the Contracting Officer of pending insurance changeover requirements.

2. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and similar documents.

3. Obtain and submit releases enabling the Government unrestricted use of the

Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

4. Submit record drawings, maintenance manuals, final project photographs, damage or settlement surveys, property surveys, and similar final record information.

5. Deliver tools, spare parts, extra stock, and similar items.

6. Make final changeover of permanent locks and transmit keys to the

Government.

7. Complete startup testing of systems and instruction of the Government's operation and maintenance personnel. Discontinue and remove temporary facilities from the site, along with mockups, construction tools, and similar elements.

8. Complete final cleanup requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred, exposed finishes.

B. Inspection Procedures: On receipt of a request for inspection, the Contracting Officer or COR will either proceed with inspection or advise the Contractor of unfilled requirements. The Contracting Officer or COR will prepare the Certificate of

Substantial Completion following inspection or advise the Contractor of construction that must be completed or corrected before the certificate will be issued.

1. The Contracting Officer or COR will repeat inspection when requested and assured that the Work is substantially complete.

2. Results of the completed inspection will form the basis of requirements for final acceptance.

1.4 - FINAL ACCEPTANCE

A. Preliminary Procedures: Before requesting final inspection for certification of final acceptance and final payment, complete the following.