Exhibit 2 Goldfield Physical Security Updates Specs Drawings Plans REVISED.pdf
PDF 9 MB Posted
- Attached to
- Construction: Goldfield Admin Site Security Upgrade Federal contract opportunity
- Solicitation number
- 127EAX22Q0024
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 127EAX22Q0024 RFI Number 2 July 8 2022.pdf | ||
| 127EAX22Q0024 RFI Number 1 7-5-22.pdf | ||
| 127EAX22Q0024 TNF Goldfield Admin Site Security Revised 6-29.pdf | ||
| 127EAX22Q0024 Amendment 0001.pdf | ||
| Exhibit 2 Goldfield Physical Security Updates Specs Drawings Plans.pdf | ||
| Exhibit 3 Tonto NF Industrial Fire Plan.pdf | ||
| Exhibit 1 Wage Determination AZ20220031 Building Maricopa.pdf | ||
| 127EAX22Q0024 TNF Goldfield Admin Site Security.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Statement of Work General Information
1.0 Scope of Work
2.0 Background and Location
Contractor Requirements
3.0 Tasks / Technical Requirements
4.0 Contacts
5.0 Deliverables / Schedule
6.0 Drawings and Photos
Statement of Work Goldfield Physical Security Upgrades
Mesa Ranger District Goldfield Administrative Site
05/01/2022 (Revised 6/28/2022 - edits in bold)
General Information
1.0 Scope of Work
This project consists of removal and disposal of the existing steel front gate and pasture fencing along the front of the administrative site and installation of approximately 2000’ of new chain-link fencing, electric-powered gate with solar battery backup, controller with key-pad entry, and installation of protective bollards. Work also includes replacing 2 existing solar-powered chain-link gate controllers and providing and installing 13 exterior motion-sensing, solar-operated lights on various buildings and vehicle covers on the site.
2.0 Background and Location
Goldfield Administrative Site is located on the Tonto National Forest, Mesa Ranger District. The compound houses fire and hotshot crews and seasonal employees, and their vehicles and equipment.
The compound also houses vehicles and equipment for the Mesa RD recreation staff and volunteer RV parking pads, as well as Maricopa County Police horses. The front gate has been inoperable for an extended period and is beyond repair. The gate and the fencing are inadequate to provide the site any physical security and unauthorized personnel have been reported on the property. The existing solar gates have had operational issues with the solar powered controller. The controllers have exposure to animals and elements which damages the equipment and wiring.
The site is located on Forest Service property. From Phoenix take AZ-202 Loop W to exit 23A for Power Road and head north. Continue onto N Bush Highway and turn left onto N. Usery Pass Road.
Goldfield Administrative Site is on the right in 0.9 miles. The site is located at 7750 N. Usery Pass Rd, Mesa, AZ 85215.
Contractor Requirements
3.0 Tasks / Technical Requirements
The intent of the contract is to provide for the completion of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract.
Refer to the FP-14 and AASHTO M 181-10 specifications.
I. Demolition and Disposal of Existing Fencing
a. Existing pasture fencing and front gate, with components, shall be removed and disposed of off Federal lands in an approved landfill for construction waste. There are no environmental concerns regarding the removal and disposal.
b. Gate controller and keypad mounting sites shall be retained and utilized for installation of new controller and keypads. Existing electrical conduit may be utilized as well as the keypad mount.
c. Demolition work shall be confined as closely as possible to the existing pasture fence line.
II. Chain-link Fence and Front Gate Controller with Dual Height Keypad
a. Chain-link fence and gate shall be 72” tall with a razor wire arm extension.
b. Posts shall be Schedule 40 and set to a depth of 36” in concrete with line posts being 1⅞” and terminal posts being 2⅞” diameters.
c. Fence fabric shall be zinc-coated gauge 9 with a mesh size of 2”.
d. The top of the posts shall be fitted with a 3-wire barb arm extension and razor wire on the top.
e. The front gate spans 24’ and is to be constructed to the same dimensions as the existing steel gate.
f. The new sliding gate shall be installed utilizing the existing gates’ v-track.
g. The slide gate operator shall be replaced with a HySecurity, SlideSmart™ DC 10F chain-drive operator, or equal. Slide gate operator shall include a solar battery back-up, a rodent-proof barrier cover, photo eye to prevent the gate from moving when a vehicle is traveling through the gate area, as well as a laser sensor which will open when a vehicle is leaving the compound and thereby eliminating the need for the existing traffic loop. The operator shall also be grounded with a lightning protection system (LPS). The digital keypads shall be replaced with new all-weather, self-illuminating digital keypads, or equal, and shall be compatible with the SlideSmart™ DC 10F operator, such as Ridge 2.0 and shall be wired (not wireless). The existing dual height keypad mount may be salvaged and used to house the new keypad operators.
h. The final chain-link fence location shall be staked in the field and approved by the COR before installation. Approximate length and location are SHOWN ON DRAWINGS.
i. Two (2) bollards shall be installed on the ingress and egress side of the keypad mounts to protect the mount from vehicular damage. Bollards shall be steel and a minimum diameter of 6” and an above grade height of at least 40” and set in concrete at a minimum 18” depth and painted with an safety yellow color.
III. Motion-sensing Security Lighting
a. 13 motion-activated solar-operated exterior security lights shall be on placed on various buildings and vehicle covers throughout the compound. Locations are SHOWN ON
THE DRAWINGS.
b. Lights mounted on buildings or where designated by COR may be electric and hardwired into an existing electrical circuit and on those lights on structures that cannot feasibly be connected shall be solar.
c. Solar lights shall be Outdoor Solar Store, Commercial Grade Solar Motion Light 150W, or approved equal. and hardwired lights shall be RAB FXLED 150W or approved equal.
Minimum radius of illumination shall be 20’
d. The lighting shall be rated for outdoor use.
IV. Solar-operated Gate Controllers with Dual Height Keypads
a. Side and rear gates shall be overhauled and have batteries replaced along with any other faulty components.
b. The side gate on the east edge of the compound shall be mechanically aligned to remove the gap left between the gate and fencing.
c. Replacement gate controllers, DKS 6500 or approved equal, shall be furnished, installed, and sealed off to be made resistant to animal intrusion.
d. Keypads shall be replaced with DKS 1500 Digital Keypad or approved equal and be installed on existing dual height keypad mounts, two for each gate.
4.0 Contacts
I. Contracting Officer’s Representative LeAnne Murphy
Phone: (602) 561-4796 Email: leanne.murphy@usda.gov
II. District Contact
Clint Remington Phone: (602) 501-8823 Email: Richard.Remington@usda.gov
5.0 Deliverables / Schedule
Work shall be completed within 90 calendar days of the Notice-to-Proceed. Contractor must begin work within 10 days of the effective date of the Notice to Proceed. Work must be planned and executed in a way that limits interference with public recreation and Forest Service operations.
Timely submission of deliverables is essential to successfully completing the project. Schedules for initial deliverables are specified in the table below. All deliverables shall be prepared and submitted according to format, content, and schedule described in the Statement of Work.
Initial Deliverables
Item No. Deliverable Objective Due
Fence, gate, gate controllers, keypads, and solar lighting submittals.
Provide proposals for materials used to complete the work.
No later than five (5) business days after notice to proceed
2 Project Schedule Facilitates timely inspections of project work by Forest Service for each road or site.
No later than five (5) business days after notice to proceed
Final deliverables include completed repair items that closely match undamaged surroundings.
Fence, gate and gate controllers, and exterior light submittals shall include catalog cuts, shop drawings, and product information.
6.0 Drawings and Photos
Goldfield Administrative Site
Goldfield Fire Office Goldfield Wellness Room
Goldfield Shade Ramada (Lower)
Goldfield Fire Office Parking Cover
Goldfield Conference/Locker Room
Goldfield Tack Shed Goldfield Workshop
Goldfield Hotshot Parking Cover Goldfield Water
Treatment Building
Goldfield Hotshot Office
Goldfield Fire Parking Cover
Goldfield Overflow Office
Goldfield Hotshot Workshop
Goldfield Recreation Portable
Goldfield Recreation Parking Cover
Goldfield Haz Mat Shed
Goldfield Engineering Storage Awning
Goldfield Workshop
Storage Awning
Photo 1: Fire Office, Wellness Room, and Hotshot Office
Photo 2: Fire Office
Photo 3: Hotshot Office
Photo 4: Fire Office Parking Cover
Photo 5: Personal Vehicle Parking
Photo 6: Existing Front Gate
Photo 7: Existing Front Gate
Photo 8: Existing Front Gate Dual-Height Keypads
Photo 9: Existing Front Gate Controller
Photo 10: North Solar Gate Batteries
Photo 11: North Solar Gate
Photo 12: West Solar Gate Alignment
Photo 13: West Solar Gate Batteries
Photo 14: West Solar Gate Battery Storage and Solar Panel
Photo 15: West Solar Gate Dual-Height Exit Keypads
Photo 16: West Solar Gate Dual-Height Entrance Keypads
Photo 17: West Solar Gate Controller
Tonto Basin Ranger District
| Statement of Work |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background and Location |
| Contractor Requirements |
| 3.0 Tasks / Technical Requirements |
| 4.0 Contacts |
| 5.0 Deliverables / Schedule |
| 6.0 Drawings and Photos |
File details come from the government source that posted it. Updated .