Sol. No. 127EAX22Q0024 Goldfield Administration Site Security Upgrade Request For Information (RFI) #2 7/08/2022

Question 1: Schedule of Items (SOI) lists a pay unit of “AQ”, please define AQ?

Answer: AQ is Actual Quantity and is measured by the actual units: LF, EA, TON, SF etc, Question 2: Schedule of Items (SOI) lists 2000 LF as approximate quantity Line Item 1003, however plans shows up to 5000 LF, what is correct linear footage?

Answer: 2000 linear feet is correct quantity for Line Item 1003.

Question 3: Which section of fence, shown on plans, is to be installed in this phase?

Answer: 2000 linear feet in the front, as shown on drawing, the remainder linear footage will taper back towards the compound.

Question 4: Is there a count of terminal and corner fence posts to be included in this 2000 LF section of fence?

Answer: 4 terminal fence posts (at the gate and at the end); 2 corner fence posts.