Amendment A00001 - Groveland Storm Damage Repair - 127EAW26R0002.pdf

PDF 3 MB Posted

Attached to
Forest Service - Groveland Storm Damage Repair
Solicitation number
127EAW26R0002
Issued by

About this file

This document is a Standard Form 30 Amendment of Solicitation for the Groveland Storm Damage Repair project in Stanislaus National Forest, issued by the USDA Forest Service. Amendment A00001 extends the proposal submission deadline to 10:00 AM PST on 13 January 2026 and provides detailed responses to 14 Request for Information (RFI) queries. Key updates include revised attachments for the Schedule of Items and Project Plans, clarifications on geogrid specifications, pavement dimensions, and RSS wall design requirements. The project involves road repair at three sites: Crocker Ridge Road (MP 2.16 and MP 6.82) and Sawmill Mountain (MP 10.9), with a total paving length of 490 linear feet across multiple sites, involving pavement removal, geogrid installation, and road reconstruction.

View the file

Other files

File Type Posted
4. Project Plans - Revised via Amendment A00001.pdf PDF
2. Schedule Of Items - Updated Via Amendment A00001.docx DOCX document
3. Specifications.pdf PDF
5. Fire Plan.pdf PDF
6. Davis Bacon WD. CA20250018.pdf PDF
1. Statement Of Work.pdf PDF
2. Schedule Of Items.docx DOCX document
7. RFI Form.docx DOCX document
Solicitation 127EAW26R0002 - Groveland Storm Damage Repair.pdf PDF
4. Project Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED 16C. DATE SIGNED

PAGE OF PAGES

CODE

(X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

2. AMENDMENT/MODIFICATION NUMBER

A00001

6. ISSUED BY

USDA FOREST SERVICE

FIELD PROCUREMENT OPERATIONS (FPO)

PROCUREMENT & PROPERTY SERVICES (PPS)

CONTRACT SERVICE AREA (CSA) 6 – CONSTRUCTION

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code)

ALL OFFERORS

9A. AMENDMENT OF SOLICITATION NUMBER

127EAW26R0002

1 3

1/8/2026

9B. DATED (SEE ITEM 11)

12/08/2026

1158999

7EAW

X 1

X

14. DESCRIPTION OF AMENDMENT/MODIFICATION

PROJECT: Groveland Storm Damage Repair Stanislaus National Forest Amendment A00001

The purpose of this solicitation amendment is to to facilitate the submission of Request for Information (RFI) responses, introduce a revised schedule of items, provide updated project plan documents, and extend the deadline for proposal submissions. See pages 2 and 3 for additional information.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TANYA I. TORRES

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 2 OF 3

CONTINUATION PAGE

CONTRACT NO:

127EAW26R0002

ORDER NO: MODIFICATION NO:

A00001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

A. The solicitation documents have been updated and now include revised attachments. Contractors are required to complete their pricing using the updated "Attachment 2: Schedule of Items - Revised via Amendment A00001." Additionally, contractors must refer to the updated "Attachment 4: Project Plans - Revised via Amendment A00001" for project-specific information. It is imperative that contractors utilize these revised documents and adhere to the updated requirements contained therein. Failure to comply will render your proposal non-responsive.

B. Below are the Request For Information (RFI) responses which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.

RFI #1: Do you have a set of plans with the proper scale? I see the "Est. QTY" on the schedule of items but I can't measure anything on the plans to cross reference.

Answer: Each site within the plans contains scaled drawings. Please refer to the site specific pages, Crocker Ridge Road MP 2.16 on page C-01, Crocker Ridge Road MP 6.82 on page C-02, and Sawmill Mountain MP 10.9 on page C-03.

RFI#2: Is the site visit mandatory?

Answer: Participation in the site visit is encouraged to obtain a thorough understanding of the conditions, but attendance is not mandatory.

RFI#3: Are liquidated damages included?

Answer: Liquidated damages provisions are not included. However, it is anticipated that the contractor will be able to commence mobilization promptly following contract award, specifically within 10 days of receiving the Notice to Proceed (NTP).

RFI#4: Do you have any additional maps for the Groveland Storm Damage Repair project in Stanislaus National Forest?

Answer: All maps are located in the project plans.

RFI#5: What determines if the culvert is replaced?

Answer: A new geocomposite underdrain system including HDPE with CMP end connections for fire resistance shall be installed as specified, refer to sheet D-04. There is no other work related to culverts in this project.

RFI#6: The non-operation period for 1S03 Sawmill Mt. Rd , are the limits based on if a culvert is removed, or is that unrelated?

Answer: It is unrelated. Any stream or ditch drainage CMPs are to remain. A new geocomposite underdrain system including HDPE with CMP end connections for fire resistance shall be installed as specified, refer to sheet D-04. There is no other work related to culverts in this project.

RFI#7: Is the culvert shown on the plans?

Answer: A new geocomposite underdrain system including HDPE with CMP end connections for fire resistance shall be installed as specified, refer to sheet D-04. There is no other work related to culverts in this project.

RFI#8: Is there a detail and spec for the permanent pavement Markings?

Answer: Refer to FP-14 section 634 – Permanent Pavement Markings, there is not a detail for markings. Due to the narrow road width, only Fog Lines are required.

RFI#9: Are the limits of the rolled erosion control mat equal to the Reinforced soil slope SF?

Answer: Rolled erosion control products are required on all disturbed surfaces. This includes the reinforced soil slopes as well as borrow sites, material stockpile sites, and any other area disturbed during construction.

RFI#10: Can the proposal due date be extended?

Answer: The deadline for proposal submissions has been extended. Proposals are now due by 10:00 AM PST on 13 January 2026.

B. All other terms

AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. 3 OF 3

CONTINUATION PAGE

CONTRACT NO:

127EAW26R0002

ORDER NO: MODIFICATION NO:

A00001

14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED)

RFI#11: Solicitation requires design of RSS walls; however, no geotechnical report or global stability analysis has been provided within the solicitation docs. Are we to assume that contractor RSS wall design will incorporate a full geotechnical site investigation?

Answer: If the RSS wall design submittal adheres to all specified plan requirements—including reinforcement embedment, reinforcement length, reinforcement spacing, design dimensions, and material strengths—a geotechnical investigation is not necessary. However, any proposed design modifications will necessitate an internal stability analysis. Contractors must ensure compliance with the lines and grades indicated on the plans for embedment and wall layout. Additionally, contractors are required to provide internal stability calculations based on the product they propose. Geoslope was utilized for the global stability analysis.

RFI# 12: Sheets C-01 and C-02 specify a geogrid with a minimum tensile capacity of 14,000 lbs/ft. Please clarify whether the 14,000 lbs/ft requirement refers to: Ultimate Tensile Strength (UTS), or Long-Term Design Strength (LTDS / allowable strength after reduction factors). Please confirm the intended tensile strength basis for the geogrid material to ensure proper material selection, pricing, and compliance with the contract requirements.

Answer: Ultimate Tensile Strength.

RFI# 13: Please confirm that geogrid vertical spacing requirements are site-specific and governed by the applicable plan sheet for each repair location. (i.e. C-01 1ft max spacing, C-02 2ft max spacing) Answer: Yes, the design dimensions differ across various sites. The specific requirements are comprehensively outlined in the drawings and work notes associated with each site

RFI# 14: Sheet G-02 indicates an assumed quantity of 250 linear feet of pavement removal. Please clarify how the 250 linear feet assumption is intended to correlate to the ton-based pay item, including, if the 250 linear feet is provided for informational purposes only.

Answer: Please be advised that the updated plans now include clarified paving dimensions for each site. The linear footage is provided solely for informational purposes, as the contract tonnage is calculated using standard unit weights for materials available in the local market. For detailed paving specifications, including the depth of asphalt concrete pavement, please refer to document D-02.

It is important to note that the paving dimensions are approximate, and final acceptance will be contingent upon the verified tonnage.

Site 1 Crocker Ridge MP 2.16 Paving Length 330 LF Paving Width 15 FT

Site 2 Crocker Ridge MP 6.82 Paving Length 60 LF Paving Width 14 FT

Site 3 Sawmill Mountain MP 10.9 Paving Length 100 LF Paving Width 16 FT

Total Paving Length 490 LF (All Sites)

///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////

B. All other terms and conditions remain unchanged.