The document is a Schedule of Items for the Groveland Storm Damage Repair project (Solicitation No. 127EAW26R0002) in the Stanislaus National Forest. The project involves storm damage repair across three sites (Crocker Ridge MP 2.16, Crocker Ridge MP 6.82, and Sawmill Mountain MP 10.9), with comprehensive roadway reconstruction and infrastructure restoration. Key work items include roadway excavation, reinforced soil slope construction, geogrid reinforcement, aggregate surface course placement, asphalt concrete installation, geocomposite underdrain installation, seeding, erosion control, and pavement markings.

The solicitation is a Total Small Business Set Aside, managed by the Department of Agriculture Forest Service, with an amendment (A00001) issued on 1/8/2026 to extend proposal submission deadlines and provide updated project documents. The schedule includes detailed line items with estimated quantities for each site, requiring contractors to submit pricing for all items and provide a bid bond for proposals exceeding $150,000. Contractors must field verify quantities to satisfy all project requirements, with final acceptance based on verified tonnage and meeting specified technical specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

GROVELAND STORM DAMAGE REPAIR

Item No.
Description
Pay Unit
Est. QTY.
Unit Price
Total Price
15101
Mobilization
LS
1
15206
Construction Survey and Staking
LS
1
15401
Contractor Sampling and Testing
LS
1
15713
Soil Erosion and Sediment Control
LS
1
20305
Removal of Asphalt
LS
1
20412.1
Roadway Excavation: Site 1 - Crocker Ridge MP 2.16
CY
3333
20412.2
Roadway Excavation: Site 2 - Crocker Ridge MP 6.82
CY
626
20412.3
Roadway Excavation: Site 3 - Sawmill Mountain MP 10.9
CY
356
26101.1
Contractor Designed Reinforced Soil Slope: Site 1 - Crocker Ridge MP 2.16
SF Face
1200
26101.2
Contractor Designed Reinforced Soil Slope: Site 2 - Crocker Ridge MP 6.82
SF Face
1440
26101.3
Contractor Designed Reinforced Soil Slope: Site 3 - Sawmill Mountain MP 10.9
SF Face
1200
26102.1
Reinforcement Geogrid: Site 1 - Crocker Ridge MP 2.16
SY
1667
26102.2
Reinforcement Geogrid: Site 2 - Crocker Ridge MP 6.82
SY
2040
26102.3
Reinforcement Geogrid: Site 3 - Sawmill Mountain MP 10.9
SY
889
30101.1
Aggregate Surface Course, Gradation E, Compaction C: Site 1 - Crocker Ridge MP 2.16
Ton
300
30101.2
Aggregate Surface Course, Gradation E, Compaction C: Site 2 - Crocker Ridge MP 6.82
Ton
49
30101.3
Aggregate Surface Course, Gradation E, Compaction C: Site 3 - Sawmill Mountain MP 10.9
Ton
72
40301.1
Asphalt Concrete, Type 1, 1/2", PG 64-28: Site 1 - Crocker Ridge MP 2.16
Ton
120
40301.2
Asphalt Concrete, Type 1, 1/2", PG 64-28: Site 2 - Crocker Ridge MP 6.82
Ton
20
40301.3
Asphalt Concrete, Type 1, 1/2", PG 64-28: Site 3 - Sawmill Mountain MP 10.9
Ton
39
60502.1
Geocomposite Underdrain: Site 1 - Crocker Ridge MP 2.16
LF
624
60502.2
Geocomposite Underdrain: Site 2 - Crocker Ridge MP 6.82
LF
178
60502.3
Geocomposite Underdrain: Site 3 - Sawmill Mountain MP 10.9
LF
216
62501
Seeding, Dry Seeding Method A
LS
1
62901
Erosion Control Mat, Type B
LS
1
63401
Permanent Pavement Markings
LS
1
63501
Temporary Traffic Control
LS
1
Contract Total Cost
$

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* The paving dimensions provided are approximate. Final acceptance will be based on the verified tonnage.

* One award will be made from this solicitation, contractors must submit pricing for all items.

* Bid Bond/Guarantee. REQUIRED for proposals exceeding $150,000 IAW FAR 52.228-1 Bid Guarantee.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

The contractor shall complete the table below and include the information with their proposal.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID:

127EAW26R0002 - Groveland Storm Damage Repair Stanislaus National Forest Updated via Amendment A00001 on 1/8/2026

File details come from the government source that posted it. Updated .