This is a detailed engineering design document for the Groveland Storm Damage Repair project in the Stanislaus National Forest, California. The project involves road repair and stabilization at three specific sites along Crocker Ridge Road (FSR 2S30) and Sawmill Mountain Road (FSR 1S03), with work focused on roadway excavation, reinforced soil slope construction, drainage system installation, and asphalt concrete paving.
The project includes approximately 3,300 cubic yards of cut and 700 cubic yards of fill at the sites, with reinforced soil slopes using geogrid reinforcement and specific layering techniques. Critical specifications include a limited operation period between March 1 and July 9, mandatory erosion control measures, traffic control requirements, and detailed drainage system installations using HDPE pipes, geomembranes, and non-woven geotextile fabrics. The United States Department of Agriculture Forest Service, specifically the Groveland Ranger District, is overseeing the project, with work to be performed in compliance with specified Forest Service standards and best management practices.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A00001 - Groveland Storm Damage Repair - 127EAW26R0002.pdf | ||
| 2. Schedule Of Items - Updated Via Amendment A00001.docx | DOCX document | |
| 3. Specifications.pdf | ||
| 5. Fire Plan.pdf | ||
| 6. Davis Bacon WD. CA20250018.pdf | ||
| 1. Statement Of Work.pdf | ||
| 2. Schedule Of Items.docx | DOCX document | |
| 7. RFI Form.docx | DOCX document | |
| Solicitation 127EAW26R0002 - Groveland Storm Damage Repair.pdf | ||
| 4. Project Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
United States Department of Agriculture Forest Service
GROVELAND STORM DAMAGE REPAIR
FROM THE GROVELAND RANGER DISTRICT OFFICE, TURN RIGHT ON CA-120, TOWARDS YOSEMITE NATIONAL PARK. CONTINUE APPROXIMATELY 9 MILES. FSR 1S03 SAWMILL MOUINTAIN ROAD WILL BE ON THE LEFT. TO REACH CROCKER RIDGE ROAD, CONTINUE ON CA-120 FOR APPROXIMATELY 5.5 MILES. TURN RIGHT ONTO HARDIN FLAT ROAD, CONTINUE 0.3 MILES. TURN LEFT TO STAY ON HARDIN FLAT ROAD, AFTER APPROXIMATELY 0.1 MILES, HARDIN FLAT ROAD TURNS RIGHT AND BECOMES FSR
2S30CROCKER RIDGE ROAD.
RECOMMENDED BY:
APPROVED:
ENGINEER
DATE
DATE
DATE
N
IC
OL
ET
HO
MP
SO
N C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N
F\
MP
2.1 6&
MP
6.8
2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D
W G;
CALIFORNIA
TUOLUMNE COUNTY
(R05) PACIFIC SOUTHWEST REGION
STANISLAUS NATIONAL FOREST
GROVELAND RANGER DISTRICT
SHEET SHEET TITLE DATE
G-01 COVERSHEET 8/5/2025
G-02 PROJECT AREA 8/5/2025
G-03 SCHEDULE OF ITEMS 8/5/2025
G-04 BEST MANAGEMENT PRACTICES 8/5/2025
G-05 BMP CHECKLIST 8/5/2025
C-01 SITE 1 CROCKER RIDGE ROAD MP 2.16 8/5/2025
C-02 SITE 2 CROCKER RIDGE ROAD MP 6.82 8/5/2025
C-03 SITE 3 SAWMILL MOUNTAIN ROAD MP 10.9 8/5/2025
D-01 DEADMAN DETAILS 8/5/2025
D-02 ASPHALT CONCRETE PAVING DETAILS 8/5/2025
D-03 ROLLED EROSION CONTROL 8/5/2025
D-04 DRAINAGE DETAILS 8/5/2025
JONATHAN BERRY Digitally signed by JONATHAN BERRY Date: 2025.08.08 11:51:39 -07'00'
BRIAN MC CRORY
Digitally signed by BRIAN MC
CRORY
Date: 2025.08.08 12:29:40 -07'00'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
PROJECT AREA
J.BERRY
J.BERRY
N.THOMPSON
PROJECT NOTES:
DURING CONSTRUCTION, FSR 2S30 AND FSR 1S03 SHALL BE CLOSED TO ALL PUBLIC TRAFFIC
WHILE THE REINFORCED FILL EXCAVATION AND RECONSTRUCTION IS OCCURRING. ACCOMMODATE
THRU TRAFFIC AS SOON AS POSSIBLE.
TRAFFIC ADVISORY SIGNS SHALL BE PLACED AT THE FOLLOWING LOCATIONS:MAJOR
INTERSECTIONS LEADING TO THE AREA, INFORMING THE PUBLIC WHERE THE CLOSURE WILL BE. AT INTERSECTIONS WHERE THE SECTION OF ROAD WILL BE CLOSED INDICATING THE ROAD IS CLOSED.
SPECIFIC DETAILS OF THE ROAD CLOSURES AND SIGNING REQUIREMENTS ARE TO COMPLY WITH FP-14 STANDARDS. CONTRACTOR TO SUBMIT TRAFFIC CONTROL PLAN AT LEAST 30 DAYS BEFORE
INTENDED USE.
WHEN THE CONTRACTOR IS NOT WORKING ON SITE AND THE EXCAVATION IS OPEN, THEY SHALL
TAKE SAFETY MEASURES TO PREVENT INADVERTENT VEHICLE ACCESS NEAR THE EXCAVATION.
CONTRACTOR TO SUBMIT A SITE SAFETY PLAN AT LEAST 30 DAYS BEFORE INTENDED USE.
NON-POTABLE WATER FOR CONSTRUCTION MAY BE OBTAINED AT RUSH CREEK ALONG HARDIN
FLAT ROAD, THE MIDDLE FORK TUOLUMNE RIVER, CARLON DAY USE AREA, OR SWEETWATER
CAMPGROUND. POTENTIAL MATERIAL BORROW AND STOCKPILE SITES ARE SHOWN ON MAP. NOTIFY COR 7 DAYS PRIOR TO INTENDED USE OF ANY USFS WATER SOURCE, BORROW SITE, OR STOCKPILE
SITE. CONTRACTOR MUST COMPLY WITH ALL BEST MANAGEMENT PRACTICES.
IT IS PRESUMED THAT THE CONTRACTOR WILL REMOVE APPROX. 250 LF OF EXISTING
PAVEMENT TO ACCOMPLISH THE WORK. ANY ADDITIONAL AC REMOVAL SHALL BE APPROVED BY THE
CONTRACTING OFFICER.
CONTRACTOR SHALL MINIMIZE TRAVEL OF STEEL TRACKED MACHINES ON THE EXISTING AC
PAVEMENT. ANY DAMAGE TO THE ROAD(S) AS A RESULT OF THEIR ACTIVITIES SHALL BE REPAIRED BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
PRIOR TO ANY WORK ON THE GROUND, THE CONTRACTOR MUST SUBMIT AN EROSION CONTROL
PLAN AND SPILL PREVENTION AND CONTAINMENT AND COUNTER MEASURES PLAN (SPCC).
CONTRACTOR TO COMPLY WITH ALL PROJECT BMPs, AND DOCUMENT PROJECT COMPLIANCE.
PLACE ROAD
CLOSED SIGN
PLACE ROAD CLOSED SIGN
AT INTERSECTION
SITE 1 MP 2.16
SITE 2 MP 6.82
PLACE ROAD
CLOSED SIGN
SITE 3 SAWMILL
MOUNTAIN ROAD
SAWMILL MOUNTAIN
ROAD, FSR 1S03
CROCKER RIDGE
ROAD, FSR 2S30
POTENTIAL MATERIAL
STOCKPILE LOCATIONS
POTENTIAL BORROW
SITES
POTENTIAL BORROW SITES
POTENTIAL BORROW SITE
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
SCHEDULE OF ITEMS
N.THOMPSON
N.THOMPSON
J.BERRY
NOTES TO THE SCHEDULE OF ITEMS
1. ITEM 15713 INCLUDES ALL LABOR, EQUIPMENT, AND MATERIALS REQUIRED TO PREVENT CONTAMINATION OR LOSS OF CONTROL OF MATERIAL DUE TO SPILLAGE, STORM WATER RUNOFF, AND
OTHER REASONABLY EXPECTED CAUSES.
2. ITEM 20412 INCLUDES THE PREPARATION OF A LEVEL, COMPACTED, BASE ON WHICH THE RSS IS CONSTRUCTED. ALSO INCLUDED IS THE APPROPRIATE STOCKPILING OF ALL EXCAVATED
MATERIAL SUITABLE FOR INCORPORATION INTO THE CONSTRUCTION.
3. TOPSOIL CONSERVATION: ALL TOPSOIL SHALL BE CONSERVED AND PLACED ON DISTURBED AREAS OUTSIDE THE LIMITS OF THE ROADWAY AFTER CONSTRUCTION IS COMPLETED, BUT PRIOR TO SEEDING. LOCATION TO STOCKPILE TOPSOIL TO BE STAKED BY COR. TOPSOIL CONSERVATION INCIDENTAL TO ITEM 20412. PROTECT STOCKPILED MATERIALS FROM EROSION DURING
CONSTRUCTION. PROTECTION INCIDENTAL TO ITEM 15713.
4. ITEM 26101 INCLUDES ALL LABOR AND EQUIPMENT REQUIRED TO CONSTRUCT THE RSS IN ACCORDANCE WITH THE RECOMMENDATIONS AND PROCEDURE OF THE MANUFACTURER AND AS SHOWN ON THE DRAWINGS. MINIMUM REQUIREMENTS ARE SHOWN IN DRAWINGS, FINAL DESIGN TO BE DONE BY CONTRACTOR. 26102, REINFORCEMENT GEOGRID, IS LISTED AS A SEPARATE
PAY ITEM.
5. ITEM 60502 IS SHOWN AS THE DRAIN SYSTEM IN THE DRAWINGS. MATERIALS INCLUDE THE GEOMEMBRANE (714.05), THE COMPOSITE SHEET (TYPE 1), THE HDPE & GALV. DRAIN PIPE, AND THE PIPE COUPLINGS. THE MEMBRANE AND GEOCOMPOSITE SHALL EXTEND 1' PAST THE ENDS OF THE WALL STRUCTURE.
6. CONTRACTOR QUALITY CONTROL: SECTION 106 - PROVIDE A QUALITY CONTROL SYSTEM THAT WILL ENSURE CONSTRUCTION REQUIRED UNDER THIS CONTRACT MEETS CONTRACT REQUIREMENTS. SUBMIT QUALITY CONTROL PLAN IN WRITING. PLAN TO INCLUDE AT A MINIMUM; COMPACTION TESTING REQUIREMENTS FOR RSS BACKFILL, SUBBASE, AND AGGREGATE SURFACING. SUBMIT QC PLAN AND SHOP DRAWINGS TO CO FOR APPROVAL A MINIMUM 14 DAYS PRIOR TO CONSTRUCTION. WORK IS CONSIDERED INCIDENTAL TO ITEM 26101.
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
BEST MANAGEMENT
PRACTICES
STF
N.THOMPSON
JB
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
BMP CHECKLIST
STF
N.THOMPSON
JB
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
SITE 1
CROCKER RIDGE ROAD
MP 2.16
J.BERRY
N.THOMPSON
J.B.
REALIGN ROAD
APPROX. 10'
INSLOPE OF
EXISTING. MAINTAIN
EXISTING ROAD
WIDTH. OUTSLOPE
ROAD 2%.
TAPER BACK TO EXISTING ROAD
ALIGNMENT, PROVIDE SMOOTH
TRANSITION
TAPER FROM EXISTING
ROAD ALIGNMENT.
PROVIDE SMOOTH
TRANSITION
ASSUMED EXISTING
FAILED SURFACE
M
AI
NT
AI
N (E
) R O
AD
W
ID
TH
APPROXIMATE GRADING VOLUMES
CUT: 3,300 CY
FILL: 700 CY
NET: 2,600 CY (CUT)
WORK NOTES:
1. MATERIAL STOCKPILE LOCATIONS SHALL BE STAKED BY COR PRIOR TO USE. POTENTIAL STOCKPILE
LOCATION IS SHOWN ON SHEET G2.
2. REINFORCED SOIL SLOPE WORK TO COMPLY WITH FP-14 SECTION 261. MINIMUM REQUIREMENTS ARE
SHOWN, FINAL DESIGN TO BE DONE BY CONTRACTOR.
3. SUBMITTALS ARE REQUIRED FOR ALL PRODUCTS USED ON SITE. REFER TO FP-14 SECTION 261 FOR
SUBMITTAL REQUIREMENTS RELATED TO THE REINFORCED SOIL SLOPE. SUBMITTALS MUST BE
SUBMITTED AT LEAST 30 DAYS BEFORE STARTING CONSTRUCTION.
4. FACING ELEMENT, IF USED, SHALL BE FIRE RESISTANT.
5. ALL MATERIALS SHALL BE UTILIZED AND INSTALLED IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATION.
5. REINFORCEMENT SHALL BE VERTICALLY SPACED A MAXIMUM OF 1', WITH AN MINIMUM EMBEDMENT
LENGTH OF 20'.
6. REINFORCEMENT AT THIS SITE SHALL BE GEOGRID WITH A MINIMUM TENSILE CAPACITY OF 14,000
LB/FT
8. LIMITED OPERATION PERIOD: THERE IS A LIMITED OPERATION PERIOD AT THIS SITE. NO WORK MAY
BE PERFORMED BETWEEN MARCH 1 AND JULY 9.
(E) ROAD
ALIGNMENT
EXTEND ON
SHOULDER MIN 3',
EXTEND BASE ON
SHOULDER MIN 6'.
MAX SLOPE 6%
MAX SLOPE 2:1
MAX SLOPE
1:1
Feet 0 50 100
PRE-FAILURE SURFACE CONTOURS
ALIGNMENT (E)
ALIGNMENT (P)
CROCKER RIDGE ROAD, FSR 2S30, MP 2.16
GEOCOMPOSITE DRAIN, SEE
DRAIN DETAIL
EMBED REINFORCEMENT
MIN. 20'
R
EI
N
FO
R C
EM
EN
T 1'
TY
P.
ASPHALT PAVEMENT,
BASE, AND SUBBASE
REFER TO PAVING
DETAILS
PLACE GEOGRID DEADMAN
AT TOP THREE LAYERS,
SEE DEADMAN DETAIL
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
STATION (FEET)
ALIGNMENT -CL SLIDE PROFILE
0+15 0+50 1+00
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
SITE 2
CROCKER RIDGE ROAD
MP 6.82
J.BERRY
J.BERRY
N.T.
ASSUMED EXISTING FAILED SURFACE
GEOCOMPOSITE DRAIN
SEE DRAIN DETAIL
PRIMARY REINFORCEMENT
LENGTH 15'
SPACED EVERY 3 FEET
PR
IM
AR
Y
R
EI
N
FO
R C
EM
EN
T 3'
T
YP
INSTALL PRIMARY REINFORCEMENT IN TOP FOUR LAYERS
INSTALL TOP TWO LAYERS LEVEL
SE
C
O N
D
AR
Y R
EI
N
FO
R
C
EM
EN
T
1' T
YP
SECONDARY
REINFORCEMENT LENGTH 6'
4°
EMBED GEOGRID 18' MEASURED FROM SLOPE FACE.
INSTALL WITH 4 DEGREE BATTER SLOPED INTO THE SLOPE.
SPACE EVERY 2' VERTICALLY.
ASSUMED EXISTING FAILED SURFACE
(E) ROAD ALIGNMENT
PRE-FAILURE SURFACE CONTOURS
Feet 0 24.959 49.918
APPROX. GRADING VOLUMES
630 CY (FILL)
WORK NOTES:
1. REINFORCED SOIL SLOPE WORK TO COMPLY WITH FP-14 SECTION 261. MINIMUM REQUIREMENTS ARE SHOWN, FINAL DESIGN TO BE DONE BY CONTRACTOR.
2. SUBMITTALS ARE REQUIRED FOR ALL PRODUCTS USED ON SITE. REFER TO FP-14 SECTION 261 FOR SUBMITTAL REQUIREMENTS RELATED TO THE REINFORCED SOIL SLOPE. SUBMITTALS MUST BE SUBMITTED AT LEAST 30 DAYS BEFORE STARTING
CONSTRUCTION.
3. MATERIAL STOCKPILE LOCATIONS SHALL BE STAKED BY COR PRIOR TO USE. POTENTIAL STOCKPILE LOCATION IS SHOWN ON SHEET G2.
4. REINFORCED SOIL SLOPE WORK TO COMPLY WITH FP-14 SECTION 261
5. FACING ELEMENT, IF USED, SHALL BE FIRE RESISTANT.
6. ALL MATERIALS SHALL BE UTILIZED AND INSTALLED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATION.
8. LIMITED OPERATION PERIOD: THERE IS A LIMITED OPERATION PERIOD AT THIS SITE. NO WORK MAY BE PERFORMED BETWEEN MARCH 1 AND JULY 9.
CROCKER RIDGE ROAD, FSR 2S30, MP 6.82
NOTE
EL
EV
AT
IO
N (F
EE
T)
EL
EV
AT
IO
N (F
EE
T)
STATION (FEET)
SAWMILL MP 10.9 PROFILE
0+50 1+00 1+10
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
SITE 3
SAWMILL MOUNTAIN
MP 10.9
J.BERRY
N. THOMPSON
JB
ASSUMED EXISTING FAILED SURFACE
GEOCOMPOSITE DRAIN, SEE
DRAIN DETAIL
EMBED REINFORCEMENT
MIN. 10'
R
EI
N
FO
R C
EM
EN
T 1'
TY
P.
Feet 0 50 100
APPROX. GRADING VOLUMES
350 CY (FILL)
WORK NOTES:
1. REINFORCED SOIL SLOPE WORK TO COMPLY WITH FP-14 SECTION 261. MINIMUM REQUIREMENTS ARE SHOWN, FINAL DESIGN TO BE DONE BY CONTRACTOR.
2. SUBMITTALS ARE REQUIRED FOR ALL PRODUCTS USED ON SITE. REFER TO FP-14 SECTION 261 FOR SUBMITTAL REQUIREMENTS RELATED TO THE REINFORCED SOIL SLOPE. SUBMITTALS MUST BE SUBMITTED AT LEAST 30 DAYS BEFORE STARTING
CONSTRUCTION.
3. FACING ELEMENT, IF USED, SHALL BE FIRE RESISTANT.
4. ALL MATERIALS SHALL BE UTILIZED AND INSTALLED IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATION.
5. REINFORCEMENT SHALL BE VERTICALLY SPACED A MAXIMUM OF 1', WITH AN MINIMUM EMBEDMENT LENGTH OF 10'.
6. REINFORCEMENT AT THIS SITE SHALL BE GEOGRID WITH A MINIMUM TENSILE CAPACITY OF 1,500 LB/FT
7. LIMITED OPERATION PERIOD: THERE IS A LIMITED OPERATION PERIOD AT THIS SITE. NO GROUND DISTURBING WORK MAY BE PERFORMED BETWEEN DECEMBER 1ST AND AUGUST 15TH WITHOUT PRIOR APPROVAL AND MITIGATION PLAN BY USFS.
8. LIMITED OPERATION PERIOD: THERE IS A LIMITED OPERATION PERIOD AT THIS SITE. NO WORK MAY BE PERFORMED BETWEEN MARCH 1 AND JULY 9.
ASPHALT PAVEMENT, BASE, AND SUBBASE REFER TO
PAVING DETAILS
PLACE GEOGRID DEADMAN AT TOP THREE
LAYERS, SEE DEADMAN DETAIL
SAWMILL MOUNTAIN ROAD, FSR 1S03, MP 10.9
NOTE
NOTES:
1. TENSION GEOGRID IN DEADMAN THEN STAKE TO MAINTAIN POSITION DURING DEADMAN BACKFILLING AND COMPACTION.
2. DEADMAN SHALL BE FORMED IN TOP THREE LAYERS OF GEOGRID/GEOTEXTILE ON ALL REINFORCED SOIL SLOPES
3. EMBED DEADMAN MINIMUM 2'
1 DEADMAN DETAILS
NOT TO SCALE
GEOGRID/GEOTEXTILE
GEOGRID/GEOTEXTILE WITH DEADMAN
ASPHALT PAVEMENT, SEE PAVING DETAIL
BASE
SUBBASE
GEOGRID/GEOTEXTILE W/O DEADMAN
SLIDE PLANE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
DEADMAN DETAIL
STANDARD DETAIL
N.THOMPSON
J..BERRY
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
AC PAVING DETAIL
STANDARD DETAIL
N.THOMPSON
JB
WORK NOTES:
1. PLACED ASPHALT WIDTH SHALL BE EXISTING TRAVELWAY WIDTH, NO WIDTH CHANGES PERMITTED.
2. SAWCUT EXISTING ASPHALT AND FORM A SMOOTH JOINT BETWEEN NEW AND EXISTING ASPHALT COURSES.
3. ASPHALT CONCRETE, CALIFORNIA STATE DOT, 12 IN. TYPE A HMA, PG 64-16.
4. ASPHALT SAWCUT, REMOVAL, TACK COAT, BASE, AND NEW ASPHALT CONCRETE FOR PATCHING ARE INCIDENTAL TO THE PAVEMENT
PATCH LINE ITEM.
5. PERFORM PAVEMENT PATCHING IN ACCORDANCE WITH FP-14 SUBSECTION 418.03.
6. SAWCUT REPAIR LIMITS TO PROVIDE VERTICAL SIDES IN REASONABLY SOUND PAVEMENT. DISPOSE OF ASPHALT OFF PROJECT.
7. CLEAN THE PATCH AREA BY SWEEPING OR OTHER ACCEPTABLE METHODS. REMOVE WATER AND DEBRIS FROM POTHOLE.
8. CROWN TOP OF NEW ASPHALT ABOVE EXISTING TRAIL/ROAD SURFACE TO PREVENT WATER POOLING.
9. THE LIMITS OF THE PAVEMENT PATCHING WILL BE MARKED BY THE COR DURING CONSTRUCTION, WITHIN 7 DAYS AFTER A REQUEST IS
RECEIVED FROM THE CONTRACTOR'S REPRESENTATIVE.
2%
SUBGRADE
PROFILE GRADE POINT
6" AGGREGATE BASE TO MIN.
95% MAXIMUM DENSITY
4" ASPHALT CONCRETE
1.5H:1V
AGGREGATE SHOULDER
TYP
DITCH WHEN PRESENT
FILL SLOPE
CUT SLOPE
HINGE POINT
HINGE
POINT
1 ASPHALT CONCRETE PAVING DETAIL
NOT TO SCALE
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
ROLLED EROSION
COMTROL
STANDARD DETAIL
N.THOMPSON
J..BERRY
NOTES:
1. EROSION CONTROL MAT MUST BE CERTIFIED WEED FREE.
2. INSTALL TEMPORARY ROLLED EROSION CONTROL PRODUCTS ON ALL DISTURBED
SURFACES AFTER COMPLETION OF FILL SLOPE REPAIRS.
3. INSTALL STAPLES ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.
4. OVERLAP IN THE DIRECTION OF THE PREVAILING WIND.
PREVAILING WIND
SEE NOTE 4
4" EDGE OVERLAP
3' MAX O.C.
12" MAX O.C.
BLANKET EDGE
STAPLE (TYP.)
SHINGLE SPLICE
SEE DETAIL C
ANCHOR TRENCH
AT TOP OF SLOPE
SEE DETAIL A
3'
12" MAX O.C.
12" MAX O.C.
STAPLE SPACING
SEE NOTE 3
ANCHOR TRENCH AT
TOE OF SLOPE SEE
DETAIL B
6"
6"
EROSION CONTROL BLANKET
STAPLE
STAPLES 12" MAX O.C. SPACING
COMPACTED
NATIVE SOIL
DETAIL A
ANCHOR
TRENCH AT
TOP OF SLOPE
DETAIL B
ANCHOR
TRENCH AT
TOE OF SLOPE
DETAIL C
SHINGLE
SPLICE
STAPLES 12" MAX
O.C. SPACING
EROSION CONTROL BLANKET
TOE OF SLOPE
6"
6"
FLOW
STAPLE
EROSION
CONTROL
BLANKET
6" MIN. OVERLAP
6"x6"
TRENCH
6"x6"
TRENCH
NOT TO SCALE
ROLLED EROSION CONTROL BLANKET1
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
OFSHEET
United States Department of Agriculture Forest Service
8/5 /25
:3
4 N
IC
OL
ET
HO
MP
SO
N
C:
\U
SE
RS
\N
IC
OL
ET
HO
MP
SO
N\
BO
X\
ST
AN
IS
LA
US
N F\
MP
2.1
6&
MP
6.8 2\A
LL
S
IT
ES
E
RF
O2
5_
NT
.D W
G;
(R05)
PACIFIC SOUTHWEST REGION
2023 ERFO
REPAIRS
STANISLAUS NATIONAL
FOREST
GROVELAND DISTRICT
DRAINAGE DETAILS
J.BERRY
J.BERRY
X.XXX
LAYOUT OF DRAINAGE SYSTEM
UPPER DRAINAGE
LOWER DRAINAGE
GEO-COMPOSITE
GEO-MEMBRANE
UPPER DRAIN DETAIL
LOWER DRAIN DETAIL
GEO-MEMBRANE END 3" ABOVE TOP OF PIPE
GEO-COMPOSITE DRAIN
EXTEND UPSLOPE
NON-WOVEN GEO-TEX
8" - 16GA GALV. STEEL OUTLET PIPE 6" DOUBLE WALL HDPE DRAIN PIPESCREENED END CAP
6" HDPE DOUBLE-WALL DRAIN PIPE
5' MIN.12" MAX
6" HDPE PERFORATED DRAIN PIPE
LOWER DRAIN, LOW POINT
UPPER DRAIN, MID-POINT
2% INSLOPE
C
6" HDPE DOUBLE-WALL DRAIN PIPE
6" HDPE PERFORATED DRAIN PIPE
CMP CONNECTION
MECHANICAL COUPLING (OR APPROVED EQUAL)
MEETING FSSS SECTION 605.03. SEE NOTE #5
BENTONITE SEAL. SEE NOTE 3
GEOMEMBRANE
NOTES:
1. HDPE DRAINAGE PIPE MAY BE CONNECTED BY, THERMOFUSE WELDING OR WITH
MECHANICAL (BELL & SPIGOT) FITTINGS. PIPE AND FITTINGS SHALL CONFORM TO
AASHTO M253 AND ASTM F2648 & D3212. ANY METAL COMPONENTS SHALL BE
STAINLESS STEEL.
2. HORIZONTAL DRAIN PIPE SHALL BE PLACED AT 2 - 3% SLOPE.
3. THE BENTONITE SEALS SHALL BE PLACED AT THE TRANSITION FROM PERFORATE
TO SOLID PIPE AND BE NO MORE THAN 12" INSIDE THE EDGE OF THE
GEOMEMBRANE OR GEO-TEX.
4. THE DRAIN ROCK IN THE DRAINAGE SYSTEM SHALL BE COMPLETELY ENCASED IN
NON-WOVEN GEO-TEX AS SHOWN IN DETAIL D4-A & B. THE HORIZONTAL
PERFORATED PIPE IN THE UPPER DRAINAGE SYSTEM SHALL BE COVERED WITH
NON-WOVEN GEO-TEX PRIOR TO BACKFILL OF THE SUB-BASE.
5. THERE ARE SEVERAL METHODS TO AFFECT AN EFFECTIVE SEAL BETWEEN THE
HDPE PIPE AND THE CMP. THE CONTRACTOR SHALL SUBMIT FOR GOVERNMENT
APPROVAL A SEALING SYSTEM DESIGNED TO CREATE A LASTING SEAL BETWEEN
THE TWO PIPES.
6. NON-WOVEN GEO-TEX, MIRAFI 403 FILTERWEAVE FABRIC OR EQUIVALENT.
MONOFILAMENT INCIDENTAL TO DRAIN SYSTEM.
7. GEOMEMBRANE WILL BE 30 MIL SCRIM REINFORCED, PUNCTURE RESISTANT.
GRANULAR BACKFILL CONFORM TO FP-14
703.03(a)
NON-WOVEN GEO-TEX
GRANULAR BACKFILL
6" HDPE PERFORATED DRAIN PIPE
6" HDPE PERFORATED DRAIN PIPE
GEO-MEMBRANE TOPS ROCK FACE
TIER 5 WWM CAP
NTS
NTS
NTS
NTS
NTS
NTS
NTS
1- 2'
8 OZ NEEDLE PUNCH FILTER
FABRIC
DRAIN AND SEAL
C
D
A
A
D
B
B
File details come from the government source that posted it. Updated .