REVISED SECTION B. SCHEDULE OF ITEMS.pdf
PDF 325 KB Posted
- Attached to
- Camp 16 Demolition and Cleanup Project
- Solicitation number
- 127EAW24R0028
- Issued by
-
Department of Agriculture Forest Service
About this file
This document appears to be a revised section of a Schedule of Items for a federal contract solicitation, Solicitation Number 127EAW24R0028, titled "Camp 16 Demolition and Cleanup Project" for the Department of Agriculture Forest Service.
The Schedule of Items lists a variety of demolition and removal tasks, including asphalt, concrete, chain link fence, metal debris, storage tanks, and contaminated soil and roofing materials. The quantities for these items are estimated, and the contractor is required to field verify to satisfy all requirements. The solicitation is a total small business set-aside between $250,000 and $500,000. Important dates include a pre-proposal site visit on June 5, 2024, and a deadline for requests for information on June 6, 2024. The contractor must submit pricing for all items listed, and payment for bond premiums is not in addition to the contract price.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Est Qty Unit Unit Price Est Cost
BASE 001
1 LS
BASE 002
Demolition and removal of existing asphalt road and parking lots up to 5" in depth. Work inlcudes minor soil spreading and recontouring surface to natural slopes. 90,000 SQ FT ‐$
*BASE 003
Concrete Walls/Remnants/Debri/Walkway 190 CU YD ‐$
Concrete Buidlings Foundation Remnants +20ft wall (bldg #7) 1100 SF ‐$
Concrete Buidlings Foundation Remnants (bldg#50) 630 SF ‐$
Concrete Buidlings Foundation Remnants (bldg #12) 1700 SF ‐$
Concrete Buidlings Foundation Remnants (bldg #57) 1385 SF ‐$
CMU Wall Remnants 550 LF ‐$
Concrete Bollards 4 EA ‐$
Concrete Tables 2 LS ‐$
Concrete Footings (Hollow) 30 CU YD ‐$
*BASE 004
Chain link fence and Posts 2200 LF ‐$
Metal Pipe Hand Rails 40 LF ‐$
Metal Scafolding 200 LF ‐$
Sheet Metal 600 SF ‐$
BASE 005
Proper removal and disposal of existing stone/rock wall. 118 CU YD ‐$
BASE 006
Removal and proper disposal of steel AST 500 gal tank and concrete base. 1 LS ‐$
BASE 007
Debris Removal – Removal of random debris at the project site. Such debris included bundles of stick/wood material, plastic containers, illegal dumping, general household waste and burned
PVC pipes. The contractor shall remove and dispose of all debris from the project site in accordance with local, state, and federal regulations. 200 CU YD ‐$
OPTION 001
1 LS ‐$
OPTION 002
If items at the project site are unknown and the contractor is suspicious of the material being hazardous, an abatement survey will be required to properly classify material. 1 LS ‐$
OPTION 003
Soil sampling for materials that are known to seep into and contaminant surrounding soil.
1 LS ‐$
OPTION 004
Requires the contractor to properly remove and dispose of contaminated soil.
Possible contaminated soil include locations near the 500 gal. steel AST Tank (approx. 30 sq ft), near the shed in the NW section of the project site (approx. 100 sq ft), and the derbi piles near the heliport (approx. 300 sq ft). 1 LS ‐$
OPTION 005
Requires the contractor to properly remove and dispose of contaminated roofing material includingthe felt underlayment located near the shed in NW section of the project location. 1 LS ‐$
TOTAL BASE BID ITEMS
TOTAL OPTION BID ITEMS
GRAND TOTAL
SOIL SAMPLING
TOTAL OPTION 003
REMOVAL OF CONTAMINATED SOIL
TOTAL OPTION 004
REMOVAL OF CONTAMINATED ROOFING MATERIALS
TOTAL OPTION 005
DEBRIS REMOVAL
TOTAL BASE 007
MOBILIZATION
TOTAL OPTION 001
ABATEMENT SURVEY
TOTAL OPTION 002
TOTAL BASE 004 (Paid as LS)
RETAINING WALL REMOVAL
TOTAL BASE 005
ABOVE GROUND STORAGE TANK REMOVAL (AST)
TOTAL BASE 006
ASPHALT REMOVAL
TOTAL BASE 002
CONCRETE REMOVAL
TOTAL BASE 003 (Paid as LS)
METAL DEBRIS REMOVAL
REVISED SECTION B-- SCHEDULE OF ITEMS
REVISED B.1 SCHEDULE OF ITEMS - BASE CONSTRUCTION
Description
MOBILIZATION
TOTAL BASE 001
REVISED SOLICITATION NO: 127EAW24R0028
PROJECT NAME: CAMP 16 DEMOLITION AND CLEANUP PROJECT
ANGELES NATIONAL FOREST
B.2 SCHEDULE NOTES
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF
THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
* Items labeled as optional are not required to be exercised by the government. If exercised, the contractor will be required to perform the optional work in accordance with the terms and conditions of this contract.
* One award will be made from this solicitation, contractors must submit pricing for all items.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
The contractor shall complete the table below and include the information with their proposal.
Company Name: POC & Title:
Email: Phone Number:
UEI Number: Tax ID:
Amendment A00003 127EAW24R0028 - Camp 16 Demolition and Cleanup Project, Angeles National Forest
| B.pdf |
| B.2 SCHEDULE NOTES |