Amendment No.2.docx

DOCX document 65 KB Posted

Attached to
GAOA Sierra Day Use Toilet Replacement and Accessibility, Inyo National Forest, California
Solicitation number
127EAW22Q0032
Issued by

View the file

Other files

File Type Posted
Copy of Schedule of Items.xlsx XLSX spreadsheet
RFI Responses.docx DOCX document
Updated sheet 19.pdf PDF
Amendment No.1 -.docx DOCX document
Schedule of Items-2.xlsx XLSX spreadsheet
Inyo_Vaul_Toilet_Site_Work_Drawings_FINAL.pdf PDF
NRE_Construction_RFQ_08102022 - new combined.docx DOCX document
Schedule of Items.xlsx XLSX spreadsheet
Section J Fire Plan.doc DOC document
Inyo_Vaul_Toilet_Site_Work_Drawings_4_19_FINAL_signed.pdf PDF
Section C.docx DOCX document
wage determination.pdf PDF
Technical Specifications.docx DOCX document
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
09/02/2022
1066026
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONSAMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGEOF PAGES
11

USDA Forest Service Construction Contracting 3237 Peacekeeper Way, Suite 101 McClellan, CA 95652 USDA Forest Service Construction Contracting 3237 Peacekeeper Way, Suite 101 McClellan, CA 95652

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER To all Prospective Offerors

127EAW22Q0032

9B. DATED (SEE ITEM 11)

08/19/2022

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE

FACILITY CODE

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.

is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GAOA Sierra Day Use Toilet Replacement and Accessibility Project, Inyo National Forest, California. Please note change as follows:

This Amendment includes three attachments:

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED
16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

1. Drawing (1 sheet) 2. Schedule of Items (1 page) 3. RFI Responses (1 page)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Previous edition unusable

STANDARD FORM 30