RFI Official Responses - 3.pdf
PDF 97 KB Posted
- Solicitation number
- 127EAW21R0016
About this file
This document contains responses to a Request for Information related to a federal contract solicitation. The solicitation is for the rehabilitation of the Kirch Flat Campground located in the Sierra National Forest. It involves asphalt and concrete work with a project value between $1 million and $2 million, and has been set aside solely for small businesses. The response clarifies that subgrade compaction for asphalt areas should follow the specifications in the project plans requiring 12 inches of compacted subgrade at 90% relative compaction, rather than the 95% compaction over 24 inches stated in the specifications. Requests for information were required to be submitted to the Contracting Officer in writing by May 12, 2021.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
REQUEST FOR INFORMATION (RFI) OFFICIAL RESPONSES
127EAW21R0016 - Kirch Flat Campground Rehab
RFI responses will be responded to as necessary in amendment format which will be posted to the solicitation via beta.SAM.gov
Telephone requests for information will not be accepted or returned.
RFI #1 – Spec Section 2200.3.8 Site Backfill and Compaction states to compact all subgrade areas to receive surfacing (asphalt concrete or concrete pads) to not less than 95 percent of AASHTO T-
180, method C or D for a minimum depth of 2 feet below subgrade elevation. Areas identified for future landscaping shall be graded and wheel rolled.
On the plans, the Asphalt Surface detail 1/G-12 shows 90 percent compaction to a depth of 1 foot below subgrade elevation. There is a substantial cost difference between the what is stated on the spec compared to what is shown on the plan.
Please clarify which instructions will be required for the contractor to follow and price.
USFS Response – Match the subgrade compaction to the plans. 12” compacted subgrade compacted to 90% relative compaction.