SECTION B – SCHEDULE OF ITEMS
127EAW21R0016 - Kirch Flat Campground Rehab High Sierra Ranger District Sierra National Forest
B- 1 - SCHEDULE OF ITEMS
ITEM NO.
DESCRIPTION
PAY UNIT
EST.
QTY.
UNIT PRICE
TOTAL PRICE
| 1050 |
| CONSTRUCTION STAKING |
| LS |
| 1 |
| $________ |
| $____________ |
| 1442 |
| QUALITY CONTROL AND QUANTITY MEASUREMENT |
| LS |
| 1 |
| $________ |
| $____________ |
| 2100 |
| DEMOLITION (e.g., any required vegetation, facilities, concrete pavement, asphalt pulverizing, toilet vaults, etc.) |
| LS |
| 1 |
| 2340 |
| INSTALL AGGREGATE BASE FOR CONSTRUCTION OF ROADS AND PARKING AREAS |
| CY |
| 455 |
| 2513 |
| CONSTRUCT ROADS AND PARKING AREAS |
| TON |
| 1834 |
| 2525 |
| CONSTRUCT AC CURB AND CURB OUTLET |
| LF |
| 1027 |
| 2580 |
| INSTALL STRIPING |
| LS |
| 1 |
| 2722 |
| INSTALL CULVERT |
| LF |
| 188 |
| 2722 |
| INSTALL INLET PROTECTION |
| EA |
| 5 |
| 2722 |
| INSTALL OUTLET PROTECTION |
| EA |
| 9 |
| 2725 |
| INSTALL ROCKLINED DITCH |
| LF |
| 1295 |
| 2725 |
| INSTALL ROCK DISSIPATER |
| EA |
| 4 |
| 2735 |
| INSTALL TOILET BUILDING |
| EA |
| 3 |
| 2805 |
| INSTALL ROCK AND POST BARRIERS |
| EA |
| 506 |
| 2816 |
| INSTALL FENCE |
| LF |
| 1700 |
| 2818 |
| CONSTRUCT CAMPSITES |
| SQ FT |
| 10160 |
| 2818 |
| CONSTRUCT TENT PADS |
| SQ FT |
| 5358 |
| $________ |
| $____________ |
| 2830 |
| CONSTRUCT OUTDOOR RECREATION ACCESS ROUTES (ORARS) |
| SQ FT |
| 1757 |
| 2830 |
| CONSTRUCT STEPS |
| EA |
| 9 |
| 2872 |
| INSTALL BENCHES |
| EA |
| 6 |
| 2873 |
| INSTALL PICNIC TABLES |
| EA |
| 32 |
| 2876 |
| INSTALL FIRE RINGS |
| EA |
| 15 |
| 2877 |
| INSTALL FOOD LOCKERS |
| EA |
| 28 |
| 2878 |
| INSTALL PEDESTAL GRILLS |
| EA |
| 5 |
| 2879 |
| INSTALL SERVICE TABLES |
| EA |
| 3 |
| 2880 |
| INSTALL STONE FIRE RING |
| EA |
| 1 |
| 2881 |
| CONSTRUCT TRASH ENCLOSURES |
| EA |
| 4 |
| 2882 |
| INSTALL WHEEL STOPS |
| EA |
| 12 |
| 2883 |
| INSTALL ENTRANCE SIGN |
| EA |
| 2 |
| 2883 |
| INSTALL BULLETIN BOARDS |
| EA |
| 3 |
| 2883 |
| INSTALL CAMPGROUND SIGNS |
| EA |
| 33 |
| 3300 |
| CONSTRUCT EXPOSED AGGREGATE CONCRETE ORAR |
| SQ FT |
| 603 |
TOTAL:
* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.
NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.
| Company Name: |