Q_A Solicitation 127EAV25Q0036.pdf

PDF 67 KB Posted

Attached to
Well Repair at Quemado Lake
Solicitation number
127EAV25Q0036
Issued by

About this file

This is a Questions and Answers document for Solicitation 127EAV25Q0036 regarding well repair services. The contractor must supply all necessary parts and materials for the repair, with no predefined list provided by the government. The contractor will be responsible for identifying what parts of the well are not functioning and determining all required materials independently. Performance begins 10 days after contract award.

The well is located at Quemado Lake and has specific technical parameters: 400 feet deep with static water at 28 feet. Equipment includes pump chlorinator, pressure tank, well head/casing, standard piping and valves, and electrical controls for the pumps. The well ID from the New Mexico Office of the State Engineer is NM3580202. A mandatory site visit is scheduled for August 13, 2025 at 1PM, with RSVP required by August 12, 2025 to Ma Estrellita Dasmarinas (maestrellita.dasmarinas@usda.gov) and Jacob Ferguson (Jacob.ferguson2@usda.gov). No technical plans or drawings are available for the well itself.

View the file

Other files

File Type Posted
Q_A Solicitation 127EAV25Q0036.pdf PDF
A6 SOI 127EAV25Q0036.xlsx XLSX spreadsheet
A7 SF 30 127EAV25Q0036.pdf PDF
A6 SCA WD 2015-5459_ 127EAV25Q0036.pdf PDF
A6 Solicitation RFQ 127EAV25Q0036.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answer for Solicitation 127EAV25Q0036

1. Plans or Diagrams: Are there any technical plans, schematics, or layout drawings associated with the well repair that can be provided? We did not see any attached in the current documentation and want to confirm whether any are available or expected.

We don’t have any technical plans or drawings of the well itself.

A Site Visit is scheduled for 13 Wednesday 2025 @ 1PM

Location: Quemado Lake

RSVP NLT 12 August 2025 to Ma Estrellita Dasmarinas at maestrellita.dasmarinas@usda.gov and Jacob Ferguson at Jacob.ferguson2@usda.gov

2. Material Requirements: The solicitation mentions that the contractor shall supply all parts listed in their quote. Could you please confirm whether there is a predefined list of required materials or components from the government, or if the contractor is expected to determine and itemize all necessary parts independently?

There isn’t a predefined list of required materials or components. Contractor will determine and itemize necessary parts.

3. Please provide information on well or what parts are not functioning.

The contractor will identify what parts of the well are not functioning.

4. Actual start date/Period or Performance?

10 days After Contract Award

5. How deep is the well(s)? 400FT

6. Where is static water for the well(s)? 28FT

7. Please list any/all equipment in the well(s): Equipment from the well house:

Pump chlorinator, pressure tank, well head/casing and standard piping and vales/electrical controls for the pumps

8. Well ID or drilling log (if known) issued from the New Mexico Office of the State Engineer: NM3580202 mailto:maestrellita.dasmarinas@usda.gov mailto:Jacob.ferguson2@usda.gov

File details come from the government source that posted it. Updated .