127EAU26Q0008 Attachment 1 SOW.pdf
PDF 513 KB Posted
- Solicitation number
- 127EAU26Q0008
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for toilet pumping services for the US Forest Service Tonto National Forest South Zone. The contract covers septic collection services across three ranger districts (Cave Creek, Globe, and Mesa) with vault toilets ranging from single to double vault capacities (1,000-2,000 gallons). The contractor will be responsible for pumping vault toilets on a flexible, as-needed basis, with service frequencies ranging from rarely to often, depending on the specific recreation site.
Key requirements include removing all septic refuse, debris, and waste materials, ensuring leak-proof transportation and proper disposal outside Forest Service land, and maintaining work areas in a clean condition. The contract period is from September 30, 2025 to September 29, 2026, with four additional one-year option periods. The contractor must provide all necessary equipment, ensure compliance with environmental regulations, avoid prohibited substances, and perform services Monday through Thursday, excluding federal holidays. A status report documenting any issues must be submitted within 24 hours of completing each pumping service.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAU26Q0008- SF 1449 Amend 1.pdf | ||
| 127EAU26Q0008 Questions and Answers.docx | DOCX document | |
| Commercial Services Combined SS RFQ Amend 1.pdf | ||
| Maricopa and Pinal County WD.pdf | ||
| 127EAU26Q0008 Attachment 3_ProjectMaps.pdf | ||
| 127EAU26Q0008- SF 1449.pdf | ||
| Commercial Services Combined SS RFQ.pdf | ||
| 127EAU26Q0008 Attachment 2 Schedule of Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
US Forest Service
Tonto National Forest
South Zone
Toilet Pumping
Statement of Work
Contents Project
1.0 Scope of Work
1.1 Vault Access
1.2 Waste/Debris Material Transport and Disposal
1.3 Work Area
2.0 Background
2.1 Contract Administration
3.0 Technical Requirements / Tasks
3.1 Contractor Personnel
3.2 Laws and Regulations
3.3 Prohibited Substances/Chemicals
4.0 Government Furnished
5.0 Deliverables / Schedule
5.1 Federal Holidays
6.0 Travel
Appendix 1 Facilities and Locations
Project Tonto NF South Zone Toilet Pumping
1.0 Scope of Work
The intent of this contract is to provide septic collection services for the North Zone of the Tonto National Forest, including the Cave Creek Ranger District, Globe Basin Ranger District, & Mesa Ranger District. The contractor shall provide any and all labor, equipment, supplies, services, permits, and licenses necessary to collect, load, haul and dump septic refuse from recreation sites. The contractor shall remove all debris, wash down, cleanup, disinfect, and dispose of all waste products removed from the vaults/holding tanks. Debris may include, but is not limited to: cans, bottles, rocks, sticks/logs, animal parts, clothing, plastic bags, metal products, toilet paper rolls/dispensers, tools, diapers, sanitary napkins, and other miscellaneous trash. If the bottom of the vault is flat, waste shall be removed down to within 4-5 inches from the bottom. If the bottom of the vault is sloped, waste shall be removed until the suction hose begins to suck too much air to make further pumping practical. Any spilled waste must be cleaned by the contractor prior to leaving the work area.
The contractor shall inspect for any damage and notify the Contracting Officer Representative (COR) immediately of suspected damage.
Work will be performed on District 1 (Cave Creek), District 2 (Globe), and District 3 (Mesa) of the Tonto National Forest during the base period September 30, 2025 to September 29, 2026, including 4 additional one-year Option Periods.
This statement of work consists of completing the tasks/subtasks in Section 3 to the deliverable requirements of Section 5.
1.1 Vault Access
The contractor shall utilize the outside vault access opening, not the toilet riser, unless there is not an outside vault access opening or if the outside vault access opening is less than 20 inches diameter (or 20 inches square). If the toilet riser must be utilized for pumping, the contractor shall protect the riser from damage. The contractor must ensure the toilet paper and dispenser are not contaminated with waste. The contractor shall notify the COR or technical POC if the toilet paper is contaminated. If the interior of the vault toilet is contaminated, the contractor shall thoroughly disinfect the contaminated area prior to leaving. The vault cover must fit with an airtight seal so that the venting process of the vault toilet is not interfered with; the contractor shall notify the COR or technical POC of any vaults that do not have an airtight seal.
1.2 Waste/Debris Material Transport and Disposal
The contractor shall transport and dispose of all waste materials to an approved site in accordance with all applicable laws, ordinances, and regulations. All debris shall be removed from the vault in a leak-proof container/bag so not to contaminate the surrounding ground and area. All waste/debris shall be disposed of outside of Forest Service land.
1.3 Work Area
The contractor shall, at all times, keep work areas free from accumulations of waste material, rubbish, tools, scaffolding, equipment, and materials. Upon completion of the job or when away from the work site, the contractor shall leave the work area and premises in a clean, neat, safe and workmanlike condition. The contractor shall remove and properly dispose of all job-related waste material.
2.0 Background
The designated locations are within recreation sites across the South Zone of the Tonto National Forest.
The Contractor shall provide septic removal services to any vault toilet, holding tank, septic tank and lift station shown below. Each vault toilet tank holds up to 1000 gallons of septic refuse, with camp host tank capacity ranging from 300-4,000 gallons. Lift Station Vault holds 4,000 gallons in capacity. The table below details the total number of tanks for each location.
2.1 Contract Administration
The CO is the only person authorized to approve changes. This authority remains solely with the CO. In the event that the contractor affects any changes at the direction of any person other than the CO, the changes will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase incurred as a result thereof.
3.0 Technical Requirements / Tasks
TASK/ SUBTASK PERFORMANCE
STANDARD
ACCEPTABLE
QUALITY LEVEL
(AQL)
MONITORING
METHOD
DISINCENTIVES FOR
NOT MEETING
STANDARDS
Pump and remove septic refuse
Any vault toilet and lift station is pumped on a flexible, pre-scheduled basis. Pumping should be performed to remove all septic refuse (1,000 Gallons). All sites are serviced between sunrise and sunset.
Contractor employees maintain a reasonable appearance and are courteous to the public.
Vault lids are closed after servicing.
100%
Visual Inspection
Contractor will be assessed actual damages incurred by the Government for repairing/cleanin g vault toilets.
Poor performance rating.
3.1 Contractor Personnel
Contract Manager. The contractor shall designate a contract manager who will be responsible for performance of services and have full authority to act for the contractor on all matters relating to daily operation of this contract. Upon contract award and prior to the contract start date, the contractor shall submit the name and telephone number of the contract manager.
Contractor Employee Conduct. The Government reserves the right to require removal from federal property any contractor employee who endangers persons or property, whose actions are inconsistent with professional conduct, or who is found to be incapacitated or under the influence of alcohol, drugs, or other substances. Removal of employees for any reason does not relieve the contractor of the requirement to perform services specified herein.
3.2 Laws and Regulations
The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection. In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the COR when violations occur and cooperate fully with fire department personnel and Government investigators.
3.3 Prohibited Substances/Chemicals
The contractor shall not use products that are, or contain Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any HAZMAT containing one of these banned substances will not be allowed on forest service land.
4.0 Government Furnished
Government will not provide any furnished property for the contractor
Contractor shall furnish all supplies and equipment, except for already existing Government-furnished vault toilets, necessary to perform this contract, including:
• Motorized equipment in good operating condition for removal of septic refuse from any designated vault toilet. Equipment shall not allow septic refuse to leak out as the vehicle travels down the road.
Truck beds shall be watertight and enclosed.
5.0 Deliverables / Schedule
All vault toilets shall be serviced on an as-needed, flexible basis.
Pumping service shall be done on a weekday, Monday-Thursday. If servicing of any vault toilet is missed due to road closures, blocked access, and/or weather, the contractor shall immediately notify the COR or technical POC. No damages will be assessed for missed collections due to circumstances beyond the control of the contractor.
Key Deliverables
Item No. Deliverable Objective Due 1 Vault Pump Pumping and removal of septic refuse from tank Pumping will be determined on an as-needed basis by the Contracting Officer’s Representative (COR) and/or technical representatives
2 Status Report Brief Report documenting issues encountered during any pumping.
Within 24 hours of completion of pumping
5.1 Federal Holidays
The contractor should not schedule services on federal holidays.
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January President’s Day - 3rd Monday in February Memorial Day - last Monday in May Juneteenth – 19 June Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
6.0 Travel
Contractor shall be responsible for covering any associated costs in traveling to each vault toilet location.
The Cave Creek Ranger District Office can be accessed via the 101 North to Pima Road, then east on Cave Creek Road to the Bartlett Lake turn-off. To reach Bartlett Lake, continue east on Bartlett Dam Road, which terminates at the recreation area. To reach Needle Rock & Box Bar, travel east on Rio Verde Dr. from Pima Rd.
for approximately 14 miles, turning north onto FR 20.
The Globe Ranger District Office can be accessed via Hwy 60 to S Hill St, turn right to head South down Hill St then take left to head Southeast down Jesse Hayes Rd/Six Shooter Canyon Rd for approximately 1 ½ miles.
The Mesa Ranger District Office can be accessed via the 202 East to South Higley Road, then a short distance West on Ingram St. To reach Four Peaks and Cottonwood Staging Areas, continue North on Hwy 87 from 202 East. To Reach Blue Point, head North on Bush Hwy from 202 East. To Reach Usery, head East on Mckellips Rd from 202 East then North on Usery Pass Rd. To reach Dutchman Staging Area, head east on Apache Trail from 202 East and continue onto Hwy 88.
Appendix 1 Facilities and Locations Single Vault Capacity = 1,000 Gallons Double Vault Capacity = 2,000 Gallons
District
Recreation Site
Type & Count of Facilities
Estimated Service
Frequency
Latitude, Longitude
Cave Creek Sears Kay 1 Single Vault Rarely 33.8856818, -111.8160161 Cave Creek Bronco Trailhead 1 Double Vault Rarely 33.934784, -111.820572 Cave Creek CCC Campground 1 Double Vault Rarely 33.970526, -111.865975 Cave Creek Cave Creek TH 1 Single Vault Rarely 33.97297875, -111.8661009 Cave Creek CCC Group Site 2 Single Vaults Rarely 33.970526, -111.865975 Cave Creek Wildcat Staging Area 1 Double Vault Rarely 33.847580, -111.816507 Cave Creek Mesquite Campground 2 Double Vaults Rarely 33.96591764, -111.7181801 Cave Creek Horseshoe Campground 1 Double Vault Rarely 33.976977, -111.717436 Cave Creek Catfish Point 1 Double Vault Rarely 33.981127, -111.711387 Cave Creek Ocotillo 1 Double Vault Rarely 33.98772635, -111.7245643 Cave Creek Box Bar 1 Double Vault Rarely 33.743712, -111.660821
Cave Creek Needle Rock (Walk-In) 1 Double Vault Rarely 33.766968, -111.669963 Cave Creek Needle Rock Picnic 2 Double Vaults Rarely 33.766968, -111.669963 Cave Creek Jojoba Boat Launch 2 Double Vaults Often 33.837752, -111.63579 Cave Creek Rattlesnake Picnic 3 Double Vaults Often 33.84880219, -111.6331804 Cave Creek SB Cove 2 Double Vaults, 1
Single Vault Often 33.8683, -111.61738
Cave Creek Yellow Cliffs 1 Double Vault Often 33.872529, -111.615632 Cave Creek Bartlett Flat 1 Double Vault Often 33.87896221, -111.6149445 Cave Creek Riverside Campground 1 Double Vault Rarely 33.80986043-111.6464633 Globe Icehouse CCC 1 Single Vault Rarely 33.326072, -110.805469
Globe Jones Water Campground
2 Single Vault Rarely 33.590847, -110.643588
Globe Kellner 1 Single Vault Rarely 33.335268, -110.828945 Globe Pinal Campground 1 Single Vault Rarely 33.284376, -110.821310 Globe Six Shooter
Campground 3 Single Vaults Rarely 33.288105, -110.830593
Globe Pioneer Pass
Campground 4 Single Vaults Rarely 33.284643, -110.794654
Globe Sulfide del Rey Campground
1 Single Vault Occasionally 33.293574, -110.867182
Globe Timber Camp Day Use 1 Single Vault Often 33.688533, -110.571009
Globe Timber Camp Campground
4 Single Vaults Often 33.688435, -110.572184
Globe Timber Camp Equestrian Group
2 Single Vaults Rarely 33.672284, -110.573701
Globe Pipeline OHV Staging Area
1 Double Vault Rarely 33.371364, -110.739047
Globe Picketpost TH 1 Double Vault Often 33.272158, -111.176456 Mesa Acacia 3 Single Vaults Occasionally 33.53687038, -111.4316991 Mesa Blue Point 2 Single Vaults Occasionally 33.5552977, -111.5737484 Mesa Boulder 2 Single Vaults Occasionally 33.531427, -111.42531 Mesa Butcher Jones 4 Single Vaults Occasionally 33.5767655, -111.5148951 Mesa First Water TH 1 Double Vault Occasionally 33.479399, -111.442564 Mesa Fish Creek Vista 1 Double Vault Occasionally 33.534836, -111.313687 Mesa Goldfield 3 Single Vaults Occasionally 33.553663, -111.621131 Mesa Granite Reef 1 Double Vault Occasionally 33.513783, -111.682901 Mesa Laguna 1 Double Vault Occasionally 33.53335954, -111.4158531 Mesa Larry Forbis 2 Single Vaults Occasionally 33.55008, -111.570576 Mesa Palo Verde 3 Single Vaults Occasionally 33.536583, -111.429342 Mesa Pebble Beach 6 Single Vaults Occasionally 33.552669, -111.574027 Mesa Peralta TH 1 Double Vault Occasionally 33.397289, -111.347931 Mesa Phon D Sutton 4 Single Vaults Occasionally 33.54697106, -111.6571505 Mesa Pobrecito 1 Double Vault Occasionally 33.575965, -111.536326 Mesa Raccoon Bluff 3 Single Vaults Occasionally 33.546914, -111.644048 Mesa Saguaro del Norte 1 Single Vault Occasionally 33.5765521, -111.5382178 Mesa Sheeps Crossing 1 Single Vault Ocassionally 33.55603604, -111.5771091 Mesa Water Users 3 Single Vault Occasionally 33.555518, -111.543833
| Project |
| 1.0 Scope of Work |
| 1.1 Vault Access |
| 1.2 Waste/Debris Material Transport and Disposal |
| 1.3 Work Area |
| 2.0 Background |
| 2.1 Contract Administration |
| 3.0 Technical Requirements / Tasks |
| 3.1 Contractor Personnel |
| 3.2 Laws and Regulations |
| 3.3 Prohibited Substances/Chemicals |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| 5.1 Federal Holidays |
| 6.0 Travel |
| Appendix 1 Facilities and Locations |
File details come from the government source that posted it. Updated .